New offices in Austin 78729
10 addresses in 78729 have permits or project filings for offices in the last two years. The most recent was filed at 7700 Parmer Ln.
Latest filings
- 7700 Parmer Ln · 7700 Parmer Cafe RemodelNov 9, 20267700 west parmer lane
- 7700 W Parmer Ln · Accenture 7700 Parmer B3 Phase 2Oct 29, 2026Eplan: commercial expedited review - interior remodel to existing dining room areas (250000 sq ft)
- 13400 Briarwick DrOct 29, 2026Replace prv in yard
- 13729 N US 183 Hwy NbOct 22, 2026Change of use office to retail with demolition to interior walls demolition electrical in interior walls install cameras in existing locations re-route outlets and switches all plumbing and mechanical to remain polished concrete floors paint
- 6500 Mc Neil DrAug 13, 2026Mcneil drive medical center
- 13831 N US 183 Hwy Svrd NbJul 13, 2026Change of use to medical office with project is an upfit of an existing tenant space involving the reconfiguration of the existing space
- 12463 Los Indios TrlJul 10, 2026Qt - the following work is occuring at an existing retirement living community - ova 11 = steel piers - 30: g.l. hunt foundation repair utilizes a steel pipe pressing method to ensure maximum stability for your home. 1 = breakout - exterior: g.l. hunt foundation repair will perform a 3x3 penetration on the exterior concrete slab to install the pier. after installation we will repour the concrete patch. 2 = g.l. hunt foundation repair will perform a 3x3 penetration on the interior concrete slab to install the pier. the price covers area preparation but excludes flooring and post-construction 2.00 corporate office: (817) 222-9253 billing office: (817) 438-8824 corporate address: 3932 benbrook hwy fort worth tx 76116 bill to clairmont retirement 12463 los indios trail austin tx 78729 usa estimate #355950641 page 1 of 2 cleaning. after installation we will repour the concrete patch
- 13561 Pond Springs RdJun 2, 2026Demolition of a two-story office and maintenance/storage building approximately 1959 square feet which was constructed several years ago without a permit. 2026 035831 da - approved
- 6900 W Parmer LnMar 2, 2026New facilities building for mech5
- 10355 Pecan Park Blvd · Q2 Aspen Lake III Level 2 RemodelJan 26, 20267 day interior remodel of existingadmin space
- 9004 Anderson Mill RdJul 19, 2022Anderson mill office
- 10121 Lake Creek PkwyDec 15, 2009Lake creek professional center (doctors office)
- 8863 Anderson Mill RdMar 2, 2007Puett office warehouse
Questions
What offices are being built in Austin 78729?
10 addresses in 78729 have permits or project filings for offices in the last two years. The most recent was filed at 7700 Parmer Ln. Others include 7700 W Parmer Ln, 13400 Briarwick Dr, 13729 N US 183 Hwy Nb.
How can I find out when a new office is permitted near me?
Watch your ZIP code or address on groundranger to get an email as soon as a new office permit is filed.