New offices in Austin 78744
65 addresses in 78744 have permits or project filings for offices in the last two years. The most recent was filed at 8001 Metropolis Dr.
Latest filings
- 8001 Metropolis DrNov 13, 2026Met center ii base power campus site improvements
- 7301 Metro Center DrNov 13, 2026Install concrete pad new nitro tank and lines
- 7051 Burleson Road · Kendra Scott WarehouseNov 13, 2026Kendra scott warehouse — renovation/alteration — warehouse/industrial and office ti with phased handovers
- 8208 Burleson RdNov 13, 2026Westbrook metals
- 7910 Burleson RdNov 13, 2026Burleson road office warehouse
- 5001 Nuckols Crossing RdNov 13, 2026Change of use & remodel to dental office (no med gas)
- 7051 Burleson Rd · Burleson Tech Bldg. 3 Spec SuiteNov 10, 2026Tech west industrial
- 2101 E St Elmo RdNov 9, 2026Upgrade electrical service
- 5810 Trade Center DrNov 9, 2026Replacement of complete existing central heat and air system with or without duct work 2 units
- 7551 Metro Center Dr · Zimmer Biomet Tenant Fit-OutNov 6, 2026Zimmer biomet tenant fit-out — renovation/alteration — 60,000 sq ft interior office fit-out on 2 floors of existing office building
- 5315 E Ben White Blvd Svrd EbNov 4, 2026Temporary office/jobsite trailer - no public access - no plumbing
- 4411 Meinardus Dr · Electrification Infrastructure Phase 5 - 4411 Meinardus Dr. Bldg BNov 3, 20263 new pre-engineered metal buildings for vehicle storage with storage rooms. building q has restrooms an office space and storage rack for meter distribution
- 2500 S US 183 Hwy SbNov 1, 2026Building 3 unit 370- new above-ground lp (propane) gas piping installation commercial roasting equipment. this is a standalone new-work trade permit (gas piping) not a repair permit. no existing gas piping is being repaired replaced or altered; this is new piping to a newly installed appliance. purpose: install new above-ground lp gas piping to supply a commercial coffee roaster (imf rm-15a_std manufacturer data sheet doc st_00) inside the modular building at this address. piping runs from the roasters gas train inlet connection to a new exterior termination stub at the rear exterior wall of the modular building. the exterior stub is a dead-end termination point only valved and capped for future connection by the propane supplier. contractor scope ends at the exterior stub; it does not include the propane tank exterior regulators or any underground/trenched piping from the tank to the stub; that work is performed separately by the propane supply company. work dimensions: total piping run approximately 25 to 35 feet (35 ft design basis) routed above ground through the rear interior of the modular building to an exterior wall penetration terminating at an exterior stub at the rear of the building. pipe size: 3/4 in nominal schedule 40 black steel trunk line reduced to 1/2 in npt at the roasters gas train connection. scope includes: pipe sizing and installation appliance shutoff valve at the roaster union sediment trap (drip leg) wall penetration with sleeve and seal exterior stub termination (valved and capped) pressure test and leak test of all new piping and coordination of required city inspections. no underground piping by the applicant. appliance dimensions and specs (imf rm-15a_std data sheet): overall dimensions 87.16 in l x 41.73 in w x 76.45 in h; weight 1433 lb (650 kg); burner riello gulliver bs1f lpg; maximum thermal input 178000 btu/hr; lpg consumption 8.4 lb/hr; required inlet pressure minimum 12 in wc maximum 48 in wc; gas train connection 1/2 in; c
- 7009 E William Cannon DrOct 30, 2026Construct sidewalk pathway of 5 ft sp-2024-0152c 2026 004947 000 00 ssi
- 7811 Burleson Rd · Ross Business Park - Bldg 01 - Spec OfficeOct 29, 2026Ross business park - building 01 - spec office — renovation/alteration — the scope of work includes a 2,580 sq ft speculative office space build within an existing warehouse space, warehouse lighting, and addition of two dock levelers. total building area is 156,506 sq ft
- 4100 Smith School Rd · Aus02 - Office RenovationOct 27, 2026Switch expansion (with r sp-2024-0474c)
- 7400 Burleson RdOct 14, 2026Colorado crossing block e
- 7909 E William Cannon DrSep 30, 2026New construction dumpster pad enclosure
- 6406 Burleson Road · Parts Tree Office Expansion & Warehouse RenovationSep 29, 2026Parts tree office expansion & warehouse renovation — renovation/alteration — 3,000 s.f. interior renovation & finish-out located within a existing shell building
- 5811 Trade Center DrSep 29, 2026Repairing damages to the service. replacing damaged gear
- 3907 South Industrial DrSep 29, 2026Simple re-roof. existing austin water offices
- 6320 E Stassney LnSep 29, 2026Secondary mechanical contractor- installing 2 kitchen hoods. first kitchen hood is 12 ft and the second kitchen hood is 10ft
- 8016 Burleson Shallow · Lmg Burleson Shallow BaySep 29, 2026Lmg burleson shallow bay — new construction — concrete tilt new construction with offices and warehouse
- 4801 Freidrich LnSep 28, 2026Eplan: commercial expedited review - interior remodel to existing warehouse suite scope of work to include adding hvac and insulation in one portion and install high pile storage racks and coordinating lightning in the other portion (194338 sq ft)
- 5217 Winnebago LnSep 28, 2026New construction of a 4 story office for r&d
- 7200 Burleson Rd · A-A1 FoodsAug 31, 2026Irrigation system installation ref 2025-145080 w
- 8000 Metropolis DrAug 25, 2026Finish out for admin office
- 2307 Business Center Dr · Portal WarehousingAug 20, 2026Eplan: commercial expedited review - interior remodel to existing office/warehouse. modular walls and doors vendor plans included. no racking in scope of work. no access control in scope of work (62261 sq ft)
- 4437 Supply Ct · Radiant - Omni Business ParkAug 6, 2026Interior finish-out for an office/warehouse (suite 101)
- 6406 Old Burleson RdAug 3, 2026Replace mop sink and relocate existing water heater
- 2090 Woodward StJul 31, 2026Interior remodel of existing office space in a single tenant building
- 6301 Stassney Lane · Atomic Semi - Project 2.0Jul 27, 2026Atomic semi - project 2.0 — renovation/alteration — renovation to existing office
- 8200 Fritillary DrJul 24, 2026New construction of 2 story sfr condo with 4 beds 3 baths attached garage covered porch and covered patio (this will be a model home garage space will be used as sales office then converted back to garage space when sold)
- 8204 Fritillary DrJul 24, 2026Model home. new construction of sfr condo with 2 beds 2.5 baths 2 car attached garage and covered front porch. the garage will be used as a construction office
- 4509 Freidrich Ln · Daikin AppliedJul 16, 2026Interior tenant improvements of ike kind to an existing office/ warehouse lease space within an existing single story building
- 4500 S Pleasant Valley RdJun 25, 2026Replacement of an existing water heater swapping out two electric tank water heaters for similar models
- 6231 E Stassney LnJun 23, 2026Replacing a bad 600a main breaker. building 13 unit 400
- 8601 Dongan DrJun 5, 2026Irrigation installation
- 7401 E Ben White Blvd Svrd EbJun 1, 2026Eplan: commercial expedited review - new construction of dumpster enclosure
- 8001 Metropolis Drive · Base Power Met 3 Phase 2May 25, 2026Base power met 3 phase 2 — renovation/alteration — second phase of a tenant finish out in a cold/dark shell building for office occupancy
- 3900 Drossett DrMay 22, 2026A 6773 sq ft tenant finish out for an office not sprinkled with no site improvements
- 7050 Burleson RdMay 19, 2026Eplan: commercial expedited review -[approved] interior remodel to convert building into a commercial production kitchen and warehousing facility phase 2 to include prep areas cooking vent hood areas dish room and additional refrigeration units. (31986sf)
- 8201 E Riverside Dr · Pentagon TechnologiesMay 18, 2026Eplan: commercial expedited review- interior remodel and change of use to create mixed use offices (18710 sq ft)
- 5811 Palo Blanco LnMay 12, 20267 day - install sports lights for park - ova
- 3505 Montopolis Dr · Lcra - Dsc - Building J & Facilities UpgradesApr 22, 2026Eplan: commercial expedited review - new construction of 4 story admin office building (56903 sq ft)
- 3913 Todd LnApr 15, 2026Change of use from office/warehouse to retail/warehouse 2026 004229 da - approved
- 8208 Fritillary DrApr 7, 2026New construction of 2 story sfr condo with 2 beds 2.5 baths porch (adding temporary office to garage area convert back before occupation) pud
- 8216 Fritillary DrApr 7, 2026New construction of sfr condo with 3 beds 2.5 baths porch (temporary office to garage area will convert back to garage before occupation) pud
- 4611 Cottonwood StMar 11, 2026Electrical connection from house to new backyard shed as an office space via sub panel. the office will consist of electrical outlets and lights shed is 186 square feet
- 4905 Winnebago LnMar 3, 2026Interior office remodeling no envelope work no warehouse
Questions
What offices are being built in Austin 78744?
65 addresses in 78744 have permits or project filings for offices in the last two years. The most recent was filed at 8001 Metropolis Dr. Others include 7301 Metro Center Dr, 7051 Burleson Road, 8208 Burleson Rd.
How can I find out when a new office is permitted near me?