groundranger
Active · latest filing Nov 2026Commercial

2500 S US 183 Hwy Sb

Austin, TX 78744

Propane piping permitted for a coffee roaster at 2500 S US 183

A City of Austin permit filed Nov. 1, 2026, covers new above-ground propane piping to serve a commercial coffee roaster inside a modular building at 2500 S US 183. The permit describes a roughly 35-foot piping run and does not include a propane tank or underground piping. Earlier permits covered an interior remodel of an existing office/light-manufacturing/limited-warehouse building and an HVAC installation; both are listed as expired.

Summarized from City of Austin records · updated Nov 1, 2026

Projects
4
4 filings
Latest filing
Nov 1, 2026
since Feb 26, 2024
Largest scope
—
Listed value
—

Where this project stands

Permit active · work underway

Building 3 unit 370- new above-ground lp (propane) gas piping installation commercial roasting equipment. this is a standalone new-work trade permit (gas piping) not a repair permit. no existing gas piping is being repaired replaced or altered; this is new piping to a newly installed appliance. purpose: install new above-ground lp gas piping to supply a commercial coffee roaster (imf rm-15a_std manufacturer data sheet doc st_00) inside the modular building at this address. piping runs from the roasters gas train inlet connection to a new exterior termination stub at the rear exterior wall of the modular building. the exterior stub is a dead-end termination point only valved and capped for future connection by the propane supplier. contractor scope ends at the exterior stub; it does not include the propane tank exterior regulators or any underground/trenched piping from the tank to the stub; that work is performed separately by the propane supply company. work dimensions: total piping run approximately 25 to 35 feet (35 ft design basis) routed above ground through the rear interior of the modular building to an exterior wall penetration terminating at an exterior stub at the rear of the building. pipe size: 3/4 in nominal schedule 40 black steel trunk line reduced to 1/2 in npt at the roasters gas train connection. scope includes: pipe sizing and installation appliance shutoff valve at the roaster union sediment trap (drip leg) wall penetration with sleeve and seal exterior stub termination (valved and capped) pressure test and leak test of all new piping and coordination of required city inspections. no underground piping by the applicant. appliance dimensions and specs (imf rm-15a_std data sheet): overall dimensions 87.16 in l x 41.73 in w x 76.45 in h; weight 1433 lb (650 kg); burner riello gulliver bs1f lpg; maximum thermal input 178000 btu/hr; lpg consumption 8.4 lb/hr; required inlet pressure minimum 12 in wc maximum 48 in wc; gas train connection 1/2 in; c

  1. AppliedOct 8, 2026
  2. IssuedNov 1, 2026
  3. WorkNov '26 – May '27
  4. Final inspection
10% through of the permit windowNov 1, 2026 → May 2, 2027

1 contact on this project · 1 phone number

Permit & project history

4 projects
  1. Building 3 unit 370- new above-ground lp (propane) gas piping installation commercial roasting equipment. this is a standalone new-work trade permit (gas piping) not a repair permit. no existing gas piping is being repaired replaced or altered; this is new piping to a newly installed appliance. purpose: install new above-ground lp gas piping to supply a commercial coffee roaster (imf rm-15a_std manufacturer data sheet doc st_00) inside the modular building at this address. piping runs from the roasters gas train inlet connection to a new exterior termination stub at the rear exterior wall of the modular building. the exterior stub is a dead-end termination point only valved and capped for future connection by the propane supplier. contractor scope ends at the exterior stub; it does not include the propane tank exterior regulators or any underground/trenched piping from the tank to the stub; that work is performed separately by the propane supply company. work dimensions: total piping run approximately 25 to 35 feet (35 ft design basis) routed above ground through the rear interior of the modular building to an exterior wall penetration terminating at an exterior stub at the rear of the building. pipe size: 3/4 in nominal schedule 40 black steel trunk line reduced to 1/2 in npt at the roasters gas train connection. scope includes: pipe sizing and installation appliance shutoff valve at the roaster union sediment trap (drip leg) wall penetration with sleeve and seal exterior stub termination (valved and capped) pressure test and leak test of all new piping and coordination of required city inspections. no underground piping by the applicant. appliance dimensions and specs (imf rm-15a_std data sheet): overall dimensions 87.16 in l x 41.73 in w x 76.45 in h; weight 1433 lb (650 kg); burner riello gulliver bs1f lpg; maximum thermal input 178000 btu/hr; lpg consumption 8.4 lb/hr; required inlet pressure minimum 12 in wc maximum 48 in wc; gas train connection 1/2 in; c

    Building 3 unit 370- new above-ground lp (propane) gas piping installation commercial roasting equipment. this is a standalone new-work trade permit (gas piping) not a repair permit. no existing gas piping is being repaired replaced or altered; this is new piping to a newly installed appliance. purpose: install new above-ground lp gas piping to supply a commercial coffee roaster (imf rm-15a_std manufacturer data sheet doc st_00) inside the modular building at this address. piping runs from the roasters gas train inlet connection to a new exterior termination stub at the rear exterior wall of the modular building. the exterior stub is a dead-end termination point only valved and capped for future connection by the propane supplier. contractor scope ends at the exterior stub; it does not include the propane tank exterior regulators or any underground/trenched piping from the tank to the stub; that work is performed separately by the propane supply company. work dimensions: total piping run approximately 25 to 35 feet (35 ft design basis) routed above ground through the rear interior of the modular building to an exterior wall penetration terminating at an exterior stub at the rear of the building. pipe size: 3/4 in nominal schedule 40 black steel trunk line reduced to 1/2 in npt at the roasters gas train connection. scope includes: pipe sizing and installation appliance shutoff valve at the roaster union sediment trap (drip leg) wall penetration with sleeve and seal exterior stub termination (valved and capped) pressure test and leak test of all new piping and coordination of required city inspections. no underground piping by the applicant. appliance dimensions and specs (imf rm-15a_std data sheet): overall dimensions 87.16 in l x 41.73 in w x 76.45 in h; weight 1433 lb (650 kg); burner riello gulliver bs1f lpg; maximum thermal input 178000 btu/hr; lpg consumption 8.4 lb/hr; required inlet pressure minimum 12 in wc maximum 48 in wc; gas train connection 1/2 in; c

    City of Austin permitPlumbing PermitActive
    Tenant / owner
    Pro
    Contractor
    Pro
    Contact
    Pro
  2. Eplan: expedited review - interior remodel to an existing office/light manufacturing/limited warehouse building. (11495 sq ft)

    Eplan: expedited review - interior remodel to an existing office/light manufacturing/limited warehouse building. (11495 sq ft)

    City of Austin permitElectrical PermitExpired
    Tenant / owner
    Pro
    Contractor
    Pro
    Contact
    Pro
  3. Installation of 1 electric hvac system with duct work

    Installation of 1 electric hvac system with duct work

    City of Austin permitMechanical PermitExpired
    Tenant / owner
    Pro
    Contractor
    Pro
    Contact
    Pro
  4. Eplan: expedited review - interior remodel to an existing office/light manufacturing/limited warehouse building. (11495 sq ft)

    Eplan: expedited review - interior remodel to an existing office/light manufacturing/limited warehouse building. (11495 sq ft)

    City of Austin permitBuilding PermitExpired
    Tenant / owner
    Pro
    Contractor
    Pro
    Contact
    Pro

Sources: City of Austin

Questions about 2500 S US 183 Hwy Sb

What is being built at 2500 S US 183 Hwy SB?

A Nov. 1, 2026, permit covers new above-ground propane piping for a commercial coffee roaster inside a modular building. It does not describe a new building.

Is a coffee shop opening at 2500 S US 183?

The permit identifies a commercial coffee roaster, but the records do not confirm that a coffee shop or other public-facing business is opening.

What does permit 2026-132862 PP cover?

The permit covers new propane piping from the roaster’s gas connection to a capped exterior stub. It excludes the propane tank and underground piping.

When was the coffee-roaster piping permit filed?

The City of Austin permit, 2026-132862 PP, was filed Nov. 1, 2026.

Was there also a remodel planned at this address?

A permit filed May 12, 2025, described an interior remodel of an existing 11,495-square-foot office/light-manufacturing/limited-warehouse building. That electrical permit is listed as expired.

Is HVAC work permitted at 2500 S US 183?

A mechanical permit filed Apr. 21, 2025, covered installation of one electric HVAC system with ductwork. The permit is listed as expired.

More warehouses & industrial in 78744, offices in 78744, restaurants in 78744.

Email me when it passes final inspection