New warehouses & industrial in Austin 78744
75 addresses in 78744 have permits or project filings for warehouses & industrial in the last two years. The most recent was filed at 3404 Comsouth Dr.
Latest filings
- 3404 Comsouth DrNov 14, 2026Sfc warehouse
- 8208 Burleson Rd · Westbrook MetalsNov 13, 2026Westbrook metals
- 7910 Burleson RdNov 13, 2026Burleson road office warehouse
- 8001 Metropolis DrNov 13, 2026Met center ii base power campus site improvements
- 7051 Burleson Road · Ctx Burleson Industrial LPNov 13, 2026Kendra scott warehouse — renovation/alteration — warehouse/industrial and office ti with phased handovers
- 7301 Metro Center Dr · Bgogc Met Center 15 Owner LPNov 13, 2026Rwe austin training center
- 7051 Burleson Rd · Ctx Burleson IndustrialNov 10, 2026Tech west industrial
- 1821 Directors BlvdNov 10, 2026Replacement of complete existing central heat and air system with or without duct work replacement of any self-contained packaged units change out of rtus and split systems. work will take place on the roof and ceiling spaces of levels 1 and 2. new controls wiring will installed and new t-stats
- 2101 E St Elmo RdNov 9, 2026Upgrade electrical service
- 4411 Meinardus Dr · City Of AustinNov 3, 20263 new pre-engineered metal buildings for vehicle storage with storage rooms. building q has restrooms an office space and storage rack for meter distribution
- 2500 S US 183 Hwy SbNov 1, 2026Building 3 unit 370- new above-ground lp (propane) gas piping installation commercial roasting equipment. this is a standalone new-work trade permit (gas piping) not a repair permit. no existing gas piping is being repaired replaced or altered; this is new piping to a newly installed appliance. purpose: install new above-ground lp gas piping to supply a commercial coffee roaster (imf rm-15a_std manufacturer data sheet doc st_00) inside the modular building at this address. piping runs from the roasters gas train inlet connection to a new exterior termination stub at the rear exterior wall of the modular building. the exterior stub is a dead-end termination point only valved and capped for future connection by the propane supplier. contractor scope ends at the exterior stub; it does not include the propane tank exterior regulators or any underground/trenched piping from the tank to the stub; that work is performed separately by the propane supply company. work dimensions: total piping run approximately 25 to 35 feet (35 ft design basis) routed above ground through the rear interior of the modular building to an exterior wall penetration terminating at an exterior stub at the rear of the building. pipe size: 3/4 in nominal schedule 40 black steel trunk line reduced to 1/2 in npt at the roasters gas train connection. scope includes: pipe sizing and installation appliance shutoff valve at the roaster union sediment trap (drip leg) wall penetration with sleeve and seal exterior stub termination (valved and capped) pressure test and leak test of all new piping and coordination of required city inspections. no underground piping by the applicant. appliance dimensions and specs (imf rm-15a_std data sheet): overall dimensions 87.16 in l x 41.73 in w x 76.45 in h; weight 1433 lb (650 kg); burner riello gulliver bs1f lpg; maximum thermal input 178000 btu/hr; lpg consumption 8.4 lb/hr; required inlet pressure minimum 12 in wc maximum 48 in wc; gas train connection 1/2 in; c
- 7811 Burleson Rd · Hci Rbp Owner LLCOct 29, 2026Ross business park - building 01 - spec office — renovation/alteration — the scope of work includes a 2,580 sq ft speculative office space build within an existing warehouse space, warehouse lighting, and addition of two dock levelers. total building area is 156,506 sq ft
- 8016 Burleson RdOct 22, 2026Lmg warehouse austin
- 8302 Talferd TrlOct 21, 2026>ev charger install...roposed installation plan: install a new 60a circuit in the 80a subpanel and route wiring to the charger location hardwire the rivian wall charger to the right of panel on the right interior garage wall and configure to draw up to 48a continuous replace the existing nema receptacle with the industrial-rated evse-ready nema receptacle provided by treehouse
- 5904 Burleson RdOct 20, 2026Armada car storage
- 4015 Drossett DrOct 20, 2026New construction of one metal warehouse building with two tenant suites. sp-2025-0324c - approved
- 6301 E Stassney LnOct 16, 2026Tpo roof overlay. adding 1/2 coverboard and tpo membrane over existing roof. existing warehouse
- 7400 Burleson RdOct 14, 2026Colorado crossing block e
- 5411 E William Cannon DrOct 5, 2026New irrigation installation ref: 2025-132399w
- 5811 Trade Center Dr · Commercial Ctr Ind., INCSep 29, 2026Repairing damages to the service. replacing damaged gear
- 3520 Comsouth Dr · Fed Airport LPSep 29, 2026Interior remodel for tenant occupancy combining two suites into a single suite. no changes to occupancy type or exterior work. no mechanical scope. no access control. deferred submittal requested for stairs
- 6406 Burleson Road · Montopolis 1Sep 29, 2026Parts tree office expansion & warehouse renovation — renovation/alteration — 3,000 s.f. interior renovation & finish-out located within a existing shell building
- 8016 Burleson Shallow · Lmg Austin LLCSep 29, 2026Lmg burleson shallow bay — new construction — concrete tilt new construction with offices and warehouse
- 6320 E Stassney Ln · Freeport Bldg. 3Sep 29, 2026Secondary mechanical contractor- installing 2 kitchen hoods. first kitchen hood is 12 ft and the second kitchen hood is 10ft
- 4801 Freidrich Ln · Colfin 2017-1 Industrial Owner LLCSep 28, 2026Eplan: commercial expedited review - interior remodel to existing warehouse suite scope of work to include adding hvac and insulation in one portion and install high pile storage racks and coordinating lightning in the other portion (194338 sq ft)
- 3800 Promontory Point DrSep 24, 2026Installation of a new rtu to provide cooling and ventilation for the packing are of the existing tortilla manufacturing facility
- 3733 Drossett Dr · Deposition TechnologySep 16, 2026*secondary contractor install a new 4000a 277/480v service only ref; 2026 080239 bp & 2026 080240 bp
- 7200 Burleson Rd · Clpf Blv TX Colorado Crossing Phase I Owner LLCAug 31, 2026Irrigation system installation ref 2025-145080 w
- 3335 Caseybridge CtAug 28, 2026Airport gateway apartments
- 4117 Mc Kinney Falls PkwyAug 26, 2026Cut in new mobile dock door in existing concrete tilt-up building. no sq ft added no change in egress occupancy load or fire protection
- 2307 Business Center Dr · Business Center Dr.Aug 20, 2026Eplan: commercial expedited review - interior remodel to existing office/warehouse. modular walls and doors vendor plans included. no racking in scope of work. no access control in scope of work (62261 sq ft)
- 4606 Burleson Rd · 4606 Burleson RdAug 18, 2026Installation of fireline
- 4612 Burleson RdAug 18, 2026Installation of fireline
- 6412 Old Burleson RdAug 14, 2026Install full irrigation system to landscape areas using reclaimed water meter
- 4015 Drossett Drive · 4015 Drossett LLCAug 13, 2026Kwik ice — new construction — new metal building for ice distribution
- 4800 Mc Kinney Falls PkwyAug 10, 2026Omni business park ii
- 4437 Supply Ct · Omni 2000 LLCAug 6, 2026Interior finish-out for an office/warehouse (suite 101)
- 6406 Old Burleson RdAug 3, 2026Simple re-roof. existing office
- 7900 Industry Way · Lit Finance IV LLCAug 3, 2026Upgrade ice machine. [7 day review]
- 5214 Burleson RdJul 29, 2026Change of use warehouse to car detail
- 8904 Fallkill DrJul 27, 2026Install new roof-mounted solar system energy storage system an ev wall connector to existing residence. bluebonnet
- 7901 Metropolis Drive · Austin TX Vii Fgf, LLCJul 22, 2026Va austin procedure suite & sps — renovation/alteration — renovate an existing procedure room with limited modifications to adjacent toilet room and soiled utility room; reconfigure the existing sps with new sink and ultrasonic station; convert two changing rooms to storage and unisex. ~770 sq ft
- 4714 Cypress BndJul 22, 2026Install new 1.962 kw rooftop solar system for existing residential only. ph3
- 4509 Freidrich Ln · Exeter 4509 Freidrich LPJul 16, 2026Interior tenant improvements of ike kind to an existing office/ warehouse lease space within an existing single story building
- 5711 China Berry RdJun 26, 2026Installing new grinder pump at the home and connecting to the city tap. will be setting in new basin pump and electrical to the pump
- 4500 S Pleasant Valley Rd · Nlp Southpark Commerce Center V LLCJun 25, 2026Replacement of an existing water heater swapping out two electric tank water heaters for similar models
- 6231 E Stassney LnJun 23, 2026Replacing a bad 600a main breaker. building 13 unit 400
- 4201 Supply CtJun 18, 2026Re roof
- 6321 E Stassney LnJun 16, 2026New shade structures over existing impervious cover parking lot exterior construction cp1 cp2 cp3 cp4 and cp5
- 9401 Brandts Wood StJun 3, 2026Ev charger installation
Questions
What warehouses & industrial are being built in Austin 78744?
75 addresses in 78744 have permits or project filings for warehouses & industrial in the last two years. The most recent was filed at 3404 Comsouth Dr. Others include 8208 Burleson Rd, 7910 Burleson Rd, 8001 Metropolis Dr.
How can I find out when a new industrial project is permitted near me?
Watch your ZIP code or address on groundranger to get an email as soon as a new industrial project permit is filed.