4714 Cypress Bnd

Austin, TX 78744

Rooftop solar permitted at 4714 Cypress Bnd

Austin permits indicate a 1.962 kW rooftop solar system is being installed at the existing residence. The solar permit was filed July 22, 2026; other permits cover a utility meter replacement on July 7, 2026, and energy storage and electrical work in November 2024.

Summarized from City of Austin records · updated Jul 22, 2026

Projects
4
4 filings
Latest filing
Jul 22, 2026
since Nov 20, 2024
Largest scope
—
Listed value
—

Where this project stands

Finaled

Install new 1.962 kw rooftop solar system for existing residential only. ph3

  1. AppliedJul 2, 2026
  2. IssuedJul 22, 2026
  3. WorkJul '26 – Jan '27
  4. Final inspectionSep 18, 2026

Passed final inspection Sep 18, 2026.

1 contact on this project · 1 phone number

Permit & project history

4 projects
  1. Install new 1.962 kw rooftop solar system for existing residential only. ph3

    Install new 1.962 kw rooftop solar system for existing residential only. ph3

    City of Austin permitElectrical PermitFinal
    Owner
    Pro
    Contractor
    Pro
    Contact
    Pro
  2. Disconnect/reconnect to replace utility meter

    Disconnect/reconnect to replace utility meter

    City of Austin permitElectrical PermitFinal
    Owner
    Pro
    Contractor
    Pro
    Contact
    Pro
  3. Disconnect/reconnect power to tie in pv/ess components. we are not upgrading the size of the service not upgrading the meter size

    Disconnect/reconnect power to tie in pv/ess components. we are not upgrading the size of the service not upgrading the meter size

    City of Austin permitElectrical PermitFinal
    Owner
    Pro
    Contractor
    Pro
    Contact
    Pro
  4. Install two 13.5kw energy storage system for existing residential only

    Install two 13.5kw energy storage system for existing residential only

    City of Austin permitElectrical PermitFinal
    Owner
    Pro
    Contractor
    Pro
    Contact
    Pro

Sources: City of Austin

Questions about 4714 Cypress Bnd

What is being installed at 4714 Cypress Bnd?

An Austin permit describes installation of a 1.962 kW rooftop solar system for an existing residence. Permit 2026-085004 EP was filed July 22, 2026.

When was the solar permit filed for 4714 Cypress Bnd?

The permit was filed July 22, 2026. The City of Austin lists permit 2026-085004 EP as final.

Is a new home being built at 4714 Cypress Bnd?

The solar permit describes work for an existing residence. The listed permits concern solar, energy storage, and electrical work.

Are battery or energy storage systems planned at 4714 Cypress Bnd?

A November 20, 2024 permit describes installation of two 13.5 kW energy storage systems for the existing residence. Permit 2024-145928 EP is listed as final.

Was the utility meter replaced at 4714 Cypress Bnd?

A permit filed July 7, 2026 describes disconnecting and reconnecting power to replace the utility meter. Permit 2026-085833 EP is listed as final.