New warehouses & industrial in Austin 78745
41 addresses in 78745 have permits or project filings for warehouses & industrial in the last two years. The most recent was filed at 4544 S Lamar Blvd Sb.
Latest filings
- 4544 S Lamar Blvd SbNov 13, 2026Rooftop solar. rooftop solar backfed breaker interconnection. 2026-125643 da
- 6509 S 1st StOct 29, 2026We will install 35 steel piers in the office. existing storage facility
- 6508 Libyan DrOct 26, 2026Coversion closet storage to full bath & deck
- 4700 Weidemar LnOct 13, 2026St. elmo site
- 3008 Davis Ln · Westgate/Davis INCOct 13, 2026Change of use from fitness to coffee shop - interior finish-out and renovation of an existing tenant space for a coffee shop. scope includes construction of customer seating and service areas barista station food preparation area restrooms storage mechanical electrical and plumbing modifications accessibility
- 4516 Merle DrOct 1, 2026New inground pool rear of main house
- 4503 Lucksinger Ln · K&k Welding LLCOct 1, 2026Ground up construction of a single story welding shop (custom manufacturing) with mezzanine
- 901 Ben White Blvd SvrdSep 17, 2026South austin medical center west tower expansion
- 210 E St Elmo Rd · Ws 210 E St Elmo Rd LLCSep 12, 2026Warespace st elmo — renovation/alteration — renovations to existing facility for business warehousing and storage facility
- 504 Industrial Blvd · Prospect Capital Holdings LLCSep 10, 20263rd wave climbing gym — renovation/alteration — the project consists of the renovation and change of occupancy of an existing warehouse building into an indoor climbing gym facility, including climbing areas, fitness areas, co-working space, accessory retail sales
- 4606 Clawson RdSep 9, 2026Addition/remodel. remove existing staircase to existing storage area on 2nd floor which is to be reconfigured into a den. add 5 new windows on 2nd floor. retroactively permit covered porch addition to side of existing 2-story single family residence
- 4202 Santiago StAug 26, 2026Interior partition remodel only - rearrange the existing climate controlled office/storage area into smaller sized self storage units. (building b)
- 1113 South Trace DrAug 21, 2026Remove existing storage water heater and install new tankless water heater
- 205 E St Elmo RdAug 18, 2026Finish out for admin office
- 808 Eberhart LnAug 4, 2026The proposed project of site improvement to an existing multifamily (senior living) community. work includes selective demolition and replacement of existing sidewalks to provide ada and tas compliant accessibility routs as well as repaving of existing parking areas striping and details as needed to meet current accessibility standards. an existing storage shed will be removed. widening existing front porch on hc units only community building. all interior work is contained entirely withing the existing building envelopes and does not affect the site building footprints or exterior building configuration
- 2304 Standish DrJul 29, 2026Install additional 2.64 kw dc rooftop solar system and an additional 10.0 kwh energy storage system to existing residential
- 4211 Willow Springs Rd · Building AJun 22, 2026*subcontractor install walk in cooler and freezer in building. reference 2025-031008 bp
- 2205 Southern Oaks DrJun 11, 2026New pool and spa
- 3308 Gallop CvJun 5, 2026Express: foundation repair
- 5006 Buffalo PassApr 27, 2026Retro permitting-covered patio 555sqft conditioned storage 260sqft covered front porch 80sqft
- 719 W William Cannon DrMar 19, 2026Change of use to daycare with remodel of an interior space non-structural
- 4301 Willow Springs Rd · Still Austin Whiskey CompanyFeb 12, 2026Change of use office/warehouse/bottling facility in an existing warehouse space. interior only no site work. site plan
- 1103 Kenyon DrFeb 12, 2026Add underground electrical for 160sqft tool/storage shed
- 2504 Berwyn CirJan 2, 2026Express: tub to shower conversion
- 2307 Lear LnDec 12, 2025Disconnect/reconnect to upgrade main distribution panel
- 5107 Woodgreen CvDec 2, 2025Retroactive: a portion of the current balcony was converted to a storage closet. kitchen remodel: remove 2 walls of garage to enlarge kitchen furr-down in living room removed 2nd story bathroom remodeled and paralleled attic space converted into walk in closet. convert attic and closet space into a new balcony
- 444 E St Elmo RdNov 28, 2025Eplan: commercial expedited review - remodel spec space for office/maufacturing/lab- (10000sf)
- 7506 Sherwood RdNov 20, 2025Install new 3.915 kw rooftop solar system and 13.5kw energy storage system for existing residential only
- 4202 Santiago St Build D & E · Ps Texas Holdings LtdNov 14, 2025Public storage (ps#25612) interior remodel — renovation/alteration — interior remodel of existing climate-controlled office / storage to smaller self-storage units
- 4601 Hank AveNov 6, 2025Building 1 (front left): new 2-story [3 bed 2.5 bath] detached residence with uncovered wood deck. part of 3-unit use
- 4804 Sylvandale DrNov 4, 2025Install new 11.31 kw rooftop solar system and 10kw energy storage system for existing residential only
- 1302 Falcon CvOct 16, 2025Install new 14.26 kw dc rooftop solar system and 10.0 kwh energy storage system to existing residential
- 5904 London DrOct 6, 2025New pool with required enclosure (heater or autofill)
- 2512 Broken Oak DrSep 26, 2025Disconnect/reconnect to upgrade main distribution panel
- 706 North Bluff DrSep 24, 2025Permit scope of work: electrical service upgrade single phase (320a metered) 1. service entrance and metering remove existing meter base and overhead riser. install new overhead service riser with weatherhead and mast for single-phase service. install new 320a continuous-rated meter base compatible with oncor/pec and austin energy. 2. main disconnects and gutter install one 125-amp surface-mounted service-rated disconnect. install one 200-amp surface-mounted service-rated disconnect. install 4-foot metal gutter (wireway) mounted above the disconnects to manage incoming and outgoing conductors. 3. panel and distribution equipment remove all existing electrical panels. install one new 200/225 amp 42-space indoor main lug panel surface-mounted. 4. grounding and bonding install two 8-foot copper ground rods connected with #4 copper wire to establish the main grounding system. install gas bond using #4 copper 2140 feet in length from the gas line to the main panel. install water bond using #4 copper from an outdoor hose bib to the main panel. 5. surge protection install a whole-home surge protector at the main panel
- 2700 Inridge DrSep 19, 2025Install 10.0 kwh energy storage system to existing residential
- 4414 S 1st StSep 15, 2025Rack service to feed building 123
- 1306 Falcon CvSep 10, 2025Install new roof mounted pv solar system and energy storage system to existing single family residence. underground ae
- 4501 Roundup TrlSep 9, 2025Disconnect/reconnect to tie in pv/ess components. we are not upgrading the size of the service not upgrading the meter size
- 4507 Lucksinger Ln · Esbg Lucksinger LLCAug 19, 2025Eplan: commercial expedited review - new consruction of mixed use office/custom manufacturing building (14951 sq ft)
- 440 E St Elmo RdAug 13, 2025Change of use. no new construction. existing office with test kitchen and dining space change of use to a mixed-use non-separated uses office and restaurant. existing equipment remains
- 4503 Roundup TrlAug 8, 2025Install new 5.160 kw rooftop solar system and 13.5kw energy storage system for existing residential only
- 6510 Emerald StJul 18, 2025Disconnect/reconnect to upgrade main distribution panel
- 7203 Elm Forest RdJul 15, 2025New single-story sfr (4br/3.5ba) with attached covered parking and covered patio
- 7300 Lunar DrJul 14, 2025Install new 13.12 kw roof top solar and 11.5 kw energy storage system to existing residential only
- 2304 Southern Oaks DrJun 27, 2025Install new 6.320 kw rooftop solar system and 13.500 kw energy storage system for existing residential only
- 2602 Inridge DrJun 12, 2025Install new 7.38 kw rooftop solar system and 13.5 kw energy storage system for existing residential only
- 5510 S IH 35 Svrd SbMay 5, 2025Lease space remodel for new ice cream parlor
- 4409 S Congress AveApr 9, 2025Install new service distribution box wire way and provided 800 amp meter can with 600 amp disconnect for new suite address used to be 4403 s congress ave building hp1
- 1907 Forestglade · Destino View LLCMar 29, 20251907 forestglade — renovation/alteration — change of use from residence to office with interior renevation including bringing utilities up to code. replacing rotten deck and partial garage/carport with a new garage storage space and expanded footprint
Questions
What warehouses & industrial are being built in Austin 78745?
41 addresses in 78745 have permits or project filings for warehouses & industrial in the last two years. The most recent was filed at 4544 S Lamar Blvd Sb. Others include 6509 S 1st St, 6508 Libyan Dr, 4700 Weidemar Ln.
How can I find out when a new industrial project is permitted near me?
Watch your ZIP code or address on groundranger to get an email as soon as a new industrial project permit is filed.