groundranger
Recent · latest filing Sep 2025Residential

4501 Roundup Trl

Austin, TX 78745

Rooftop solar and battery storage permitted at 4501 Roundup Trl

City of Austin permits filed September 9, 2025, cover a 1.640 kW rooftop solar system and a 13.5 kW energy storage system for an existing residence at 4501 Roundup Trl. A second electrical permit covers disconnecting and reconnecting the system components; the description says the service and meter sizes are not being upgraded. Both permits are marked final.

Summarized from City of Austin records · updated Sep 9, 2025

Projects
2
2 filings
Latest filing
Sep 9, 2025
since Sep 9, 2025
Largest scope
—
Listed value
—

Where this project stands

Finaled

Disconnect/reconnect to tie in pv/ess components. we are not upgrading the size of the service not upgrading the meter size

  1. AppliedSep 5, 2025
  2. IssuedSep 9, 2025
  3. WorkSep '25 – Sep '25
  4. Final inspectionSep 29, 2025

Passed final inspection Sep 29, 2025.

1 contact on this project · 1 phone number

Permit & project history

2 projects
  1. Disconnect/reconnect to tie in pv/ess components. we are not upgrading the size of the service not upgrading the meter size

    Disconnect/reconnect to tie in pv/ess components. we are not upgrading the size of the service not upgrading the meter size

    City of Austin permitElectrical PermitFinal
    Owner
    Pro
    Contractor
    Pro
    Contact
    Pro
  2. Install new 1.640 kw rooftop solar system and 13.5kw energy storage system for existing residential only

    Install new 1.640 kw rooftop solar system and 13.5kw energy storage system for existing residential only

    City of Austin permitElectrical PermitFinal
    Owner
    Pro
    Contractor
    Pro
    Contact
    Pro

Sources: City of Austin

Questions about 4501 Roundup Trl

What is being installed at 4501 Roundup Trl?

A City of Austin permit covers a 1.640 kW rooftop solar system and a 13.5 kW energy storage system for an existing residence. Permit 2025-113301 EP was filed September 9, 2025, and is marked final.

Is there a battery installation at 4501 Roundup Trl?

Yes. Permit 2025-113301 EP describes a 13.5 kW energy storage system along with a rooftop solar system. It was filed September 9, 2025.

How large is the solar system at 4501 Roundup Trl?

The permit describes a 1.640 kW rooftop solar system. The City of Austin filed permit 2025-113301 EP on September 9, 2025.

When were the solar permits filed for 4501 Roundup Trl?

Both City of Austin electrical permits were filed September 9, 2025. They are numbered 2025-113301 EP and 2025-113310 EP, and both are marked final.

Is the electrical service being upgraded at 4501 Roundup Trl?

The description for permit 2025-113310 EP says the work ties in the solar and energy storage components without upgrading the service or meter size.

Are the permits for a new home at 4501 Roundup Trl?

No new home is described in these records. Permit 2025-113301 EP describes the solar and energy storage installation as being for an existing residence.

Also being built nearby

All of 78745

More warehouses & industrial in 78745, solar installs in 78745.

Email me when a new permit is filed