4500 Navajo Path
Austin, TX 78745
Two foundation repair permits at 4500 Navajo Path
City of Austin records show foundation repair work at this residential address, not a new building. Permits were filed August 18, 2025, and September 16, 2026; both are listed as final.
Summarized from City of Austin records · updated Sep 16, 2026
- Projects
- 2
- 2 filings
- Latest filing
- Sep 16, 2026
- since Aug 18, 2025
- Largest scope
- —
- Listed value
- —
Where this project stands
FinaledExpress- foundation repair
- AppliedSep 8, 2026
- IssuedSep 16, 2026
- WorkSep '26 – Oct '26
- Final inspectionOct 6, 2026
Passed final inspection Oct 6, 2026.
2 contacts on this project · 2 phone numbers
Permit & project history
2 projectsExpress- foundation repair
Express- foundation repair
City of Austin permitBuilding PermitFinal- Record
- 2026-117380 BP
- Owner
- Pro
- Contractor
- Pro
- Contact
- Pro
Express: foundation repair
Express: foundation repair
City of Austin permitBuilding PermitFinal- Record
- 2025-104275 BP
- Owner
- Pro
- Contractor
- Pro
- Contact
- Pro
Sources: City of Austin
Questions about 4500 Navajo Path
What is being built at 4500 Navajo Path?
The records show foundation repair permits, not a new building. Both permits are listed as final.
Is there new construction at 4500 Navajo Path in Austin?
The available City of Austin records describe foundation repair work. They do not list a new construction project.
When was the foundation repair permitted at 4500 Navajo Path?
Two permits are recorded: 2025-104275 BP, filed August 18, 2025, and 2026-117380 BP, filed September 16, 2026.
What does permit 2026-117380 BP cover?
The September 16, 2026, City of Austin permit describes express foundation repair at 4500 Navajo Path. Its status is listed as final.
Are the permits for 4500 Navajo Path final?
Yes. Both foundation repair permits in the City of Austin records are listed as final.
Also being built nearby
All of 78745- 4502 Navajo PathAug 12, 2025Electrical/repair permit (installation of a 6.480 kw roof-mounted photovoltaic solar power system for kristen lowman.) · 31 m away
- 4503 Navajo PathSep 5, 2024New finishes & fixtures at hall bath remodel to convert hall closet to 1/2 bath enlarge closet new built-ins cosmetic improvements at exterior. new trim new front door in existing opening install new beams per structural drawing/specifications. 8/23/24 sm - only rooms not impacted by the remodel is the primary bath and kitchen. full 1 1/2 bath remodel along with a new office sitting room for primary suite · 46 m away
- 4504 Navajo PathFeb 11, 2026Express: replacing 7 windows and 1 door like-for-like in an existing residential home · 48 m away
- 2503 Western Trails BlvdFeb 24, 2025New 550 sq ft unit with 1 bed and 1 bath · 62 m away
- 4504 Roundup TrlFeb 10, 2025Replace sewer line · 72 m away
- 4507 Navajo PathJan 6, 2025New in-ground gunite pool (200 sq ft) new wood and concrete decking · 82 m away
- 4506 Roundup TrlJun 20, 2024Replace 40 section of sewer yard line · 83 m away
- 4502 Tejas TrlJul 7, 2025Interior remodel and driveway/sidewalk work (retro active permit) · 89 m away
- 4508 Tejas TrlApr 16, 2026Installation of an in-ground pool with spa water pool & spa coping and equipment pad · 100 m away
- 4509 Navajo PathJan 27, 2026Express - removing and replacing 12 windows & 1 door like for like · 112 m away
- 4503 Roundup TrlAug 8, 2025Install new 5.160 kw rooftop solar system and 13.5kw energy storage system for existing residential only · 123 m away
- 4510 Tejas TrlJun 23, 2025Foundation repair · 125 m away