groundranger
Recent · latest filing Aug 2025Residential

4502 Navajo Path

Austin, TX 78745

Rooftop solar systems permitted at 4502 Navajo Path

City of Austin permits indicate rooftop solar installations at this home: an 8-kW photovoltaic system was permitted on June 3, 2024, and a 6.48-kW system was permitted on July 21, 2025. The July 2025 permit is marked final; a later permit for the same 6.48-kW system, filed August 12, 2025, was withdrawn.

Summarized from City of Austin records · updated Aug 12, 2025

Projects
3
3 filings
Latest filing
Aug 12, 2025
since Jun 3, 2024
Largest scope
—
Listed value
—

Where this project stands

Permit withdrawn

Electrical/repair permit (installation of a 6.480 kw roof-mounted photovoltaic solar power system for kristen lowman.)

  1. AppliedAug 11, 2025
  2. IssuedAug 12, 2025
  3. !WorkAug '25 – Feb '26
  4. Final inspection

Marked withdrawn Aug 25, 2025.

1 contact on this project · 1 phone number

Permit & project history

3 projects
  1. Electrical/repair permit (installation of a 6.480 kw roof-mounted photovoltaic solar power system for kristen lowman.)

    Electrical/repair permit (installation of a 6.480 kw roof-mounted photovoltaic solar power system for kristen lowman.)

    City of Austin permitElectrical PermitWithdrawn
    Owner
    Pro
    Contractor
    Pro
    Contact
    Pro
  2. Installation of a 6.480 kw roof-mounted photovoltaic solar power system for kristen lowman

    Installation of a 6.480 kw roof-mounted photovoltaic solar power system for kristen lowman

    City of Austin permitElectrical PermitFinal
    Owner
    Pro
    Contractor
    Pro
    Contact
    Pro
  3. Installation of 8.000 kw photovoltaic system on roof of home. no mpu. address at 4502 navajo path austin texas 78745 - kristen lowman

    Installation of 8.000 kw photovoltaic system on roof of home. no mpu. address at 4502 navajo path austin texas 78745 - kristen lowman

    City of Austin permitElectrical PermitFinal
    Owner
    Pro
    Contractor
    Pro
    Contact
    Pro

Sources: City of Austin

Questions about 4502 Navajo Path

What is being built at 4502 Navajo Path in Austin?

City of Austin permit records list rooftop photovoltaic solar systems at the home, including an 8-kW system and a 6.48-kW system.

When was the solar work permitted at 4502 Navajo Path?

The 8-kW system permit was filed June 3, 2024. A permit for a 6.48-kW system was filed July 21, 2025.

Is the 6.48-kW solar permit at 4502 Navajo Path approved?

The July 21, 2025 permit, 2025-083577 EP, is marked final. A later permit for the same system, 2025-101376 EP, was filed August 12, 2025, and is marked withdrawn.

What size solar system is listed for 4502 Navajo Path?

The City of Austin records list an 8-kW photovoltaic system in a June 2024 permit and a 6.48-kW roof-mounted system in a July 2025 permit.

Is 4502 Navajo Path a commercial solar project?

The records describe the address as a home and list residential rooftop photovoltaic installations.

Also being built nearby

All of 78745

More solar installs in 78745.

Email me when a new permit is filed