706 North Bluff Dr

Austin, TX 78745

Electrical service upgrade permitted at 706 North Bluff Dr

An electrical service upgrade was permitted at 706 North Bluff Dr in Austin on September 24, 2025. Permit 2025-101265 EP covers a new 320-amp meter base, service disconnects, electrical panel and grounding and surge-protection equipment; it does not specify a new business or use.

Summarized from City of Austin records · updated Sep 24, 2025

Projects
1
1 filings
Latest filing
Sep 24, 2025
since Sep 24, 2025
Largest scope
—
Listed value
—

Where this project stands

Finaled

Permit scope of work: electrical service upgrade single phase (320a metered) 1. service entrance and metering remove existing meter base and overhead riser. install new overhead service riser with weatherhead and mast for single-phase service. install new 320a continuous-rated meter base compatible with oncor/pec and austin energy. 2. main disconnects and gutter install one 125-amp surface-mounted service-rated disconnect. install one 200-amp surface-mounted service-rated disconnect. install 4-foot metal gutter (wireway) mounted above the disconnects to manage incoming and outgoing conductors. 3. panel and distribution equipment remove all existing electrical panels. install one new 200/225 amp 42-space indoor main lug panel surface-mounted. 4. grounding and bonding install two 8-foot copper ground rods connected with #4 copper wire to establish the main grounding system. install gas bond using #4 copper 2140 feet in length from the gas line to the main panel. install water bond using #4 copper from an outdoor hose bib to the main panel. 5. surge protection install a whole-home surge protector at the main panel

  1. AppliedAug 11, 2025
  2. IssuedSep 24, 2025
  3. WorkSep '25 – Oct '25
  4. Final inspectionOct 28, 2025

Passed final inspection Oct 28, 2025.

1 contact on this project · 1 phone number

Permit & project history

1 project
  1. Permit scope of work: electrical service upgrade single phase (320a metered) 1. service entrance and metering remove existing meter base and overhead riser. install new overhead service riser with weatherhead and mast for single-phase service. install new 320a continuous-rated meter base compatible with oncor/pec and austin energy. 2. main disconnects and gutter install one 125-amp surface-mounted service-rated disconnect. install one 200-amp surface-mounted service-rated disconnect. install 4-foot metal gutter (wireway) mounted above the disconnects to manage incoming and outgoing conductors. 3. panel and distribution equipment remove all existing electrical panels. install one new 200/225 amp 42-space indoor main lug panel surface-mounted. 4. grounding and bonding install two 8-foot copper ground rods connected with #4 copper wire to establish the main grounding system. install gas bond using #4 copper 2140 feet in length from the gas line to the main panel. install water bond using #4 copper from an outdoor hose bib to the main panel. 5. surge protection install a whole-home surge protector at the main panel

    Permit scope of work: electrical service upgrade single phase (320a metered) 1. service entrance and metering remove existing meter base and overhead riser. install new overhead service riser with weatherhead and mast for single-phase service. install new 320a continuous-rated meter base compatible with oncor/pec and austin energy. 2. main disconnects and gutter install one 125-amp surface-mounted service-rated disconnect. install one 200-amp surface-mounted service-rated disconnect. install 4-foot metal gutter (wireway) mounted above the disconnects to manage incoming and outgoing conductors. 3. panel and distribution equipment remove all existing electrical panels. install one new 200/225 amp 42-space indoor main lug panel surface-mounted. 4. grounding and bonding install two 8-foot copper ground rods connected with #4 copper wire to establish the main grounding system. install gas bond using #4 copper 2140 feet in length from the gas line to the main panel. install water bond using #4 copper from an outdoor hose bib to the main panel. 5. surge protection install a whole-home surge protector at the main panel

    City of Austin permitElectrical PermitFinal
    Tenant / owner
    Pro
    Contractor
    Pro
    Contact
    Pro

Sources: City of Austin

Questions about 706 North Bluff Dr

What is being built at 706 North Bluff Dr?

A City of Austin permit covers an electrical service upgrade, including a new meter base, disconnects and panel. The permit does not describe a new building or business.

When was the electrical work at 706 North Bluff Dr permitted?

The permit was filed September 24, 2025. Its number is 2025-101265 EP, and its status is listed as Final.

Is a new business opening at 706 North Bluff Dr?

The permit describes electrical service work, not a new business or tenant. It does not identify an occupant.

What electrical work is planned at 706 North Bluff Dr?

The scope includes replacing the existing meter base and panels, installing a new 320-amp meter base and two service disconnects, and adding grounding and surge protection. The permit is 2025-101265 EP.

What construction is happening near 7 Brew on East William Cannon Drive?

A City of Austin permit filed September 24, 2025, covers an electrical service upgrade at 706 North Bluff Dr, about 398 meters from 7 Brew Austin, TX. It does not specify a new business or use.

Is there a new restaurant planned near China Harbor Restaurant?

The record for 706 North Bluff Dr, about 399 meters from China Harbor Restaurant, is for an electrical service upgrade. It does not identify a restaurant or other new tenant.