6320 IH 35 Svrd
Austin, TX 78745
6320 IH 35 Svrd: 1 project on record
City of Austin lists 1 filing across 1 project at 6320 IH 35 Svrd, Austin, TX 78745. The most recent, filed March 2, 2007, covers: “Capitol chevrolet”.
Compiled from City of Austin records · updated Mar 2, 2007
- Projects
- 1
- 1 filings
- Latest filing
- Mar 2, 2007
- since Mar 2, 2007
- Largest scope
- —
- Listed value
- —
Permit & project history
1 projectSources: City of Austin
Questions about 6320 IH 35 Svrd
What is being built at 6320 IH 35 Svrd?
The latest filing (City of Austin case 245916, March 2, 2007) covers capitol chevrolet.
How many permits and filings does 6320 IH 35 Svrd have?
1 filing across 1 project, from March 2, 2007 to March 2, 2007.
Is there other construction near 6320 IH 35 Svrd?
Yes. Nearby filings include 6200 IH 35 Svrd (capitol chevrolet parking garage, Mar 2, 2007); 6300 IH 35 Svrd (capitol chevrolet sales office addition, Mar 2, 2007); 6315 S IH 35 Svrd Nb (replace rpz above mop sink (applebees), Oct 18, 2024).
How do I get alerts for new permits at 6320 IH 35 Svrd?
Watch this address on groundranger and you'll get an email when a new permit or project filing appears here or nearby.
Also being built nearby
All of 78745- 6200 IH 35 SvrdMar 2, 2007Capitol chevrolet parking garage · 75 m away
- 6300 IH 35 SvrdMar 2, 2007Capitol chevrolet sales office addition · 96 m away
- 6315 S IH 35 Svrd NbOct 18, 2024Replace rpz above mop sink (applebees) · 107 m away
- 6201 IH 35 SvrdFeb 18, 2016Ferrari of austin · 145 m away
- 6200 S IH 35 Svrd SbSep 23, 2024Installation of two (2) ev chargers · 155 m away
- 6315 IH 35 SvrdMar 2, 2007Applebee's grill & bar (was shoney's) · 164 m away
- 6406 N IH 35 Svrd SbNov 5, 2026Maximum ac and heating llc. is working in conjunction with rodge ryan air on permit #2026-032217 to install one icemaker and on walk in cooler · 194 m away
- 6014 IH 35 SvrdNov 6, 2015Little texas pud lot 6 · 203 m away
- 1616 Nelms DrMar 13, 2009South creek bluff subdivision · 223 m away
- 706 North Bluff DrSep 24, 2025Permit scope of work: electrical service upgrade single phase (320a metered) 1. service entrance and metering remove existing meter base and overhead riser. install new overhead service riser with weatherhead and mast for single-phase service. install new 320a continuous-rated meter base compatible with oncor/pec and austin energy. 2. main disconnects and gutter install one 125-amp surface-mounted service-rated disconnect. install one 200-amp surface-mounted service-rated disconnect. install 4-foot metal gutter (wireway) mounted above the disconnects to manage incoming and outgoing conductors. 3. panel and distribution equipment remove all existing electrical panels. install one new 200/225 amp 42-space indoor main lug panel surface-mounted. 4. grounding and bonding install two 8-foot copper ground rods connected with #4 copper wire to establish the main grounding system. install gas bond using #4 copper 2140 feet in length from the gas line to the main panel. install water bond using #4 copper from an outdoor hose bib to the main panel. 5. surge protection install a whole-home surge protector at the main panel · 229 m away
- 6112-1/2 IH 35 SvrdMay 24, 2014Little texas pud, lot 6 · 249 m away
- 6015 IH 35 SvrdFeb 1, 2008Brake check phase 2 · 264 m away