groundranger
Historic · latest filing Mar 2007Commercial

6300 IH 35 Svrd

Austin, TX 78745

6300 IH 35 Svrd: 1 project on record

City of Austin lists 1 filing across 1 project at 6300 IH 35 Svrd, Austin, TX 78745. The most recent, filed March 2, 2007, covers: “Capitol chevrolet sales office addition”.

Compiled from City of Austin records · updated Mar 2, 2007

Projects
1
1 filings
Latest filing
Mar 2, 2007
since Mar 2, 2007
Largest scope
—
Listed value
—

Permit & project history

1 project
  1. CAPITOL CHEVROLET SALES OFFICE ADDITION

    Capitol chevrolet sales office addition

    City of Austin casesite_planApproved and Released
    Record
    155672
    Tenant / owner
    Pro
    Contractor
    Pro
    Contact
    Pro

Sources: City of Austin

Questions about 6300 IH 35 Svrd

What is being built at 6300 IH 35 Svrd?

The latest filing (City of Austin case 155672, March 2, 2007) covers capitol chevrolet sales office addition.

How many permits and filings does 6300 IH 35 Svrd have?

1 filing across 1 project, from March 2, 2007 to March 2, 2007.

Is there other construction near 6300 IH 35 Svrd?

Yes. Nearby filings include 6320 IH 35 Svrd (capitol chevrolet, Mar 2, 2007); 6200 IH 35 Svrd (capitol chevrolet parking garage, Mar 2, 2007); 706 North Bluff Dr (permit scope of work: electrical service upgrade single phase (320a metered) 1. service entrance and metering remove existing meter base and overhead riser. install new overhead service riser with weatherhead and mast for single-phase service. install new 320a continuous-rated meter base compatible with oncor/pec and austin energy. 2. main disconnects and gutter install one 125-amp surface-mounted service-rated disconnect. install one 200-amp surface-mounted service-rated disconnect. install 4-foot metal gutter (wireway) mounted above the disconnects to manage incoming and outgoing conductors. 3. panel and distribution equipment remove all existing electrical panels. install one new 200/225 amp 42-space indoor main lug panel surface-mounted. 4. grounding and bonding install two 8-foot copper ground rods connected with #4 copper wire to establish the main grounding system. install gas bond using #4 copper 2140 feet in length from the gas line to the main panel. install water bond using #4 copper from an outdoor hose bib to the main panel. 5. surge protection install a whole-home surge protector at the main panel, Sep 24, 2025).

How do I get alerts for new permits at 6300 IH 35 Svrd?

Watch this address on groundranger and you'll get an email when a new permit or project filing appears here or nearby.

Also being built nearby

All of 78745

More offices in 78745.

Get alerts for 6300 IH 35 Svrd