6201 IH 35 Svrd
Austin, TX 78744
6201 IH 35 Svrd: 4 projects on record
City of Austin lists 4 filings across 4 projects at 6201 IH 35 Svrd, Austin, TX 78744 since December 15, 2009. The most recent, filed February 18, 2016, covers: “Ferrari of austin”.
Compiled from City of Austin records · updated Feb 18, 2016
- Projects
- 4
- 4 filings
- Latest filing
- Feb 18, 2016
- since Dec 15, 2009
- Largest scope
- —
- Listed value
- —
Permit & project history
4 projectsSources: City of Austin
Questions about 6201 IH 35 Svrd
What is being built at 6201 IH 35 Svrd?
The latest filing (City of Austin case 11313765, February 18, 2016) covers ferrari of austin.
How many permits and filings does 6201 IH 35 Svrd have?
4 filings across 4 projects, from December 15, 2009 to February 18, 2016.
Is there other construction near 6201 IH 35 Svrd?
Yes. Nearby filings include 1616 Nelms Dr (south creek bluff subdivision, Mar 13, 2009); 6315 S IH 35 Svrd Nb (replace rpz above mop sink (applebees), Oct 18, 2024); 6015 IH 35 Svrd (brake check phase 2, Feb 1, 2008).
How do I get alerts for new permits at 6201 IH 35 Svrd?
Watch this address on groundranger and you'll get an email when a new permit or project filing appears here or nearby.
Also being built nearby
All of 78744- 1616 Nelms DrMar 13, 2009South creek bluff subdivision · 103 m away
- 6315 S IH 35 Svrd NbOct 18, 2024Replace rpz above mop sink (applebees) · 115 m away
- 6015 IH 35 SvrdFeb 1, 2008Brake check phase 2 · 141 m away
- 6200 S IH 35 Svrd SbSep 23, 2024Installation of two (2) ev chargers · 142 m away
- 6320 IH 35 SvrdMar 2, 2007Capitol chevrolet · 145 m away
- 6315 IH 35 SvrdMar 2, 2007Applebee's grill & bar (was shoney's) · 172 m away
- 6200 IH 35 SvrdMar 2, 2007Capitol chevrolet parking garage · 179 m away
- 1701 Nelms DrFeb 25, 2023Bluffs at nelms apartment · 182 m away
- 6014 IH 35 SvrdNov 6, 2015Little texas pud lot 6 · 193 m away
- 1704 Nelms DrJan 29, 2024Fire damage repair replacing all components like-for-like. the electrical scope of work will include replacement of some electrical boxes and associated wire. the existing panel will remain pending inspector approval. the mechanical scope will include replacement of the hvac system. the plumbing scope will consist of replacing the tub waste and overflow and damaged fixtures. the balance of the scope will be replacing insulation as required sheetrock (including installation of 2 layers of 5/8 type x sheetrock on the ceilings) cabinets fixtures as required and remaining finishes. two replacement windows will require fall protection · 200 m away
- 6112-1/2 IH 35 SvrdMay 24, 2014Little texas pud, lot 6 · 211 m away
- 6300 IH 35 SvrdMar 2, 2007Capitol chevrolet sales office addition · 241 m away