6315 IH 35 Svrd
Austin, TX 78744
6315 IH 35 Svrd: 2 projects on record
City of Austin lists 2 filings across 2 projects at 6315 IH 35 Svrd, Austin, TX 78744. The most recent, filed March 2, 2007, covers: “Applebee's”.
Compiled from City of Austin records · updated Mar 2, 2007
- Projects
- 2
- 2 filings
- Latest filing
- Mar 2, 2007
- since Mar 2, 2007
- Largest scope
- —
- Listed value
- —
Permit & project history
2 projectsSources: City of Austin
Questions about 6315 IH 35 Svrd
What is being built at 6315 IH 35 Svrd?
The latest filing (City of Austin case 156532, March 2, 2007) covers applebee's.
How many permits and filings does 6315 IH 35 Svrd have?
2 filings across 2 projects, from March 2, 2007 to March 2, 2007.
Is there other construction near 6315 IH 35 Svrd?
Yes. Nearby filings include 6315 S IH 35 Svrd Nb (replace rpz above mop sink (applebees), Oct 18, 2024); 1616 Nelms Dr (south creek bluff subdivision, Mar 13, 2009); 6320 IH 35 Svrd (capitol chevrolet, Mar 2, 2007).
How do I get alerts for new permits at 6315 IH 35 Svrd?
Watch this address on groundranger and you'll get an email when a new permit or project filing appears here or nearby.
Also being built nearby
All of 78744- 6315 S IH 35 Svrd NbOct 18, 2024Replace rpz above mop sink (applebees) · 68 m away
- 1616 Nelms DrMar 13, 2009South creek bluff subdivision · 161 m away
- 6320 IH 35 SvrdMar 2, 2007Capitol chevrolet · 164 m away
- 1701 Nelms DrFeb 25, 2023Bluffs at nelms apartment · 167 m away
- 6201 IH 35 SvrdFeb 18, 2016Ferrari of austin · 172 m away
- 6406 N IH 35 Svrd SbNov 5, 2026Maximum ac and heating llc. is working in conjunction with rodge ryan air on permit #2026-032217 to install one icemaker and on walk in cooler · 173 m away
- 6300 IH 35 SvrdMar 2, 2007Capitol chevrolet sales office addition · 222 m away
- 1704 Nelms DrJan 29, 2024Fire damage repair replacing all components like-for-like. the electrical scope of work will include replacement of some electrical boxes and associated wire. the existing panel will remain pending inspector approval. the mechanical scope will include replacement of the hvac system. the plumbing scope will consist of replacing the tub waste and overflow and damaged fixtures. the balance of the scope will be replacing insulation as required sheetrock (including installation of 2 layers of 5/8 type x sheetrock on the ceilings) cabinets fixtures as required and remaining finishes. two replacement windows will require fall protection · 233 m away
- 6200 IH 35 SvrdMar 2, 2007Capitol chevrolet parking garage · 239 m away
- 6301 Bluff Springs RdOct 16, 2026The circle at nelms multi-family development · 250 m away
- 6500-1/2 Bluff Springs RdNov 6, 2008South brook center two subdivision — south brook center two subdivision · 252 m away
- 6200 S IH 35 Svrd SbSep 23, 2024Installation of two (2) ev chargers · 282 m away
More restaurants in 78744.