6015 IH 35 Svrd
Austin, TX 78744
6015 IH 35 Svrd: 4 projects on record
City of Austin lists 4 filings across 4 projects at 6015 IH 35 Svrd, Austin, TX 78744 since March 2, 2007. The most recent, filed February 1, 2008, covers: “Brake check phase 2”.
Compiled from City of Austin records · updated Feb 1, 2008
- Projects
- 4
- 4 filings
- Latest filing
- Feb 1, 2008
- since Mar 2, 2007
- Largest scope
- —
- Listed value
- —
Permit & project history
4 projectsSources: City of Austin
Questions about 6015 IH 35 Svrd
What is being built at 6015 IH 35 Svrd?
The latest filing (City of Austin case 10092511, February 1, 2008) covers brake check phase 2.
How many permits and filings does 6015 IH 35 Svrd have?
4 filings across 4 projects, from March 2, 2007 to February 1, 2008.
Is there other construction near 6015 IH 35 Svrd?
Yes. Nearby filings include 6001 IH 35 Svrd (porsche south austin, Jan 21, 2022); 6201 IH 35 Svrd (ferrari of austin, Feb 18, 2016); 6112-1/2 IH 35 Svrd (little texas pud, lot 6, May 24, 2014).
How do I get alerts for new permits at 6015 IH 35 Svrd?
Watch this address on groundranger and you'll get an email when a new permit or project filing appears here or nearby.
Also being built nearby
All of 78744- 6001 IH 35 SvrdJan 21, 2022Porsche south austin · 99 m away
- 6201 IH 35 SvrdFeb 18, 2016Ferrari of austin · 141 m away
- 6112-1/2 IH 35 SvrdMay 24, 2014Little texas pud, lot 6 · 156 m away
- 6200 S IH 35 Svrd SbSep 23, 2024Installation of two (2) ev chargers · 160 m away
- 6014 IH 35 SvrdNov 6, 2015Little texas pud lot 6 · 177 m away
- 1616 Nelms DrMar 13, 2009South creek bluff subdivision · 185 m away
- 1704 Nelms DrJan 29, 2024Fire damage repair replacing all components like-for-like. the electrical scope of work will include replacement of some electrical boxes and associated wire. the existing panel will remain pending inspector approval. the mechanical scope will include replacement of the hvac system. the plumbing scope will consist of replacing the tub waste and overflow and damaged fixtures. the balance of the scope will be replacing insulation as required sheetrock (including installation of 2 layers of 5/8 type x sheetrock on the ceilings) cabinets fixtures as required and remaining finishes. two replacement windows will require fall protection · 238 m away
- 5809-1/2 IH 35 SvrdFeb 23, 2010Austowers-stassney crossing · 239 m away
- 6201 Sneed CvOct 1, 2026Structural repair area exterior covered balcony/patio walls at existing multi-family building · 240 m away
- 6315 S IH 35 Svrd NbOct 18, 2024Replace rpz above mop sink (applebees) · 256 m away
- 1701 Nelms DrFeb 25, 2023Bluffs at nelms apartment · 261 m away
- 6200 IH 35 SvrdMar 2, 2007Capitol chevrolet parking garage · 264 m away