2304 Standish Dr
Austin, TX 78745
Rooftop solar and battery storage added at Austin home
An additional 2.64 kW DC rooftop solar system and 10.0 kWh energy storage system are being installed at the existing residence. The City of Austin electrical permit was filed July 29, 2026, and is marked final.
Summarized from City of Austin records · updated Jul 29, 2026
- Projects
- 6
- 6 filings
- Latest filing
- Jul 29, 2026
- since Nov 28, 2023
- Largest scope
- —
- Listed value
- —
Where this project stands
FinaledInstall additional 2.64 kw dc rooftop solar system and an additional 10.0 kwh energy storage system to existing residential
- AppliedJun 16, 2026
- IssuedJul 29, 2026
- WorkJul '26 – Jan '27
- Final inspectionOct 5, 2026
Passed final inspection Oct 5, 2026.
1 contact on this project · 1 phone number
Permit & project history
6 projectsInstall additional 2.64 kw dc rooftop solar system and an additional 10.0 kwh energy storage system to existing residential
Install additional 2.64 kw dc rooftop solar system and an additional 10.0 kwh energy storage system to existing residential
City of Austin permitElectrical PermitFinal- Record
- 2026-076450 EP
- Owner
- Pro
- Contractor
- Pro
- Contact
- Pro
Outlet for a water heater
Outlet for a water heater
City of Austin permitElectrical PermitExpired- Record
- 2025-044182 EP
- Owner
- Pro
- Contractor
- Pro
- Contact
- Pro
Replacement of an existing water heater 50gal electric
Replacement of an existing water heater 50gal electric
City of Austin permitPlumbing PermitFinal- Record
- 2025-026161 PP
- Owner
- Pro
- Contractor
- Pro
- Contact
- Pro
Replace water line from water meter to house only
Replace water line from water meter to house only
City of Austin permitPlumbing PermitFinal- Record
- 2024-032313 PP
- Owner
- Pro
- Contractor
- Pro
- Contact
- Pro
Solar installation of 16 panels and 1 battery backup
Solar installation of 16 panels and 1 battery backup
City of Austin permitElectrical PermitFinal- Record
- 2023-082438 EP
- Owner
- Pro
- Contractor
- Pro
- Contact
- Pro
Move meter add panel outside and install ess system controller
Move meter add panel outside and install ess system controller
City of Austin permitElectrical PermitFinal- Record
- 2023-151903 EP
- Owner
- Pro
- Contractor
- Pro
- Contact
- Pro
Sources: City of Austin
Questions about 2304 Standish Dr
What is being built at 2304 Standish Dr?
A City of Austin permit describes an additional 2.64 kW DC rooftop solar system and 10.0 kWh energy storage system for the existing residence.
Is solar being installed at 2304 Standish Dr in Austin?
Yes. Electrical permit 2026-076450 EP, filed July 29, 2026, covers an additional rooftop solar system.
Is there a battery installation at 2304 Standish Dr?
The permit also describes an additional 10.0 kWh energy storage system. The permit is marked final.
When was the solar permit filed for 2304 Standish Dr?
The City of Austin filed electrical permit 2026-076450 EP on July 29, 2026. Its status is final.
Is 2304 Standish Dr a new home construction project?
The permit describes adding solar and energy storage to an existing residence; it does not describe new home construction.
Also being built nearby
All of 78745- 2306 Standish DrMay 1, 2026Addition and remodel: interior to be completely gutted. some walls to be removed or relocated. all windows and doors to be replaced. minor electrical and plumbing work. replacing roof. exterior work involves a small added patio under front entry area and a small deck in the backyard entry area. front fence relocation. revision 01 to add mp · 22 m away
- 2302 Standish DrOct 29, 2025Replacement of an existing water heater · 23 m away
- 2300 Standish DrDec 10, 2024Replacement of complete existing central heat and air system with or without duct work 1 system 4 ton straight cool gas furnace · 41 m away
- 2403 Gateshead CirAug 25, 2025Replacement of complete existing central heat and air system with or without duct work · 41 m away
- 2307 Whitestone DrMay 2, 2024Tunnel under slab foundation and replace call cast iron with new pvc 2 access points one through floor in garage and one near exterior front door. 50 total feet of tunnel under slab and new sewer yard line from house tro city sewer tap. *emergency · 64 m away
- 2302 Whitestone DrJul 9, 2026Tunnel under foundation to replace cast iron drain lines for 2 full bathrooms kitchen and washer drain lines. 2 access holes will be made one in the front side by doorway entrance and the second by the garage to tunnel and reroute kitchen and second bathroom total length of tunnel is approximately 60 feet of tunnel. sewer line will be replaced from the home to the city tap connection total length of sewer line is approximately 70 feet · 98 m away
- 5809 Buffalo PassAug 12, 2025Replacement of complete existing central heat and air system with or without duct work · 104 m away
- 2306 Brookhill DrApr 11, 2025Dig though ground under foundation to tunnel out and replace up to 50 feet of sewer line. this is for the kitchen and laundry lines only · 108 m away
- 2303 Whitestone DrJun 4, 2025Replace main panel · 111 m away
- 2307 Berry Hill CirDec 17, 2024Upgrading existing service to 200amps · 113 m away
- 2300 Whitestone DrDec 1, 2025Ev charger installation · 120 m away
- 5705 Buffalo PassApr 15, 2026Replacement of complete existing central heat and air system with or without duct work upflow in closet · 123 m away
More warehouses & industrial in 78745, solar installs in 78745.