2302 Standish Dr
Austin, TX 78745
Plumbing repairs permitted at 2302 Standish Dr
City of Austin permits at 2302 Standish Dr cover plumbing repairs to the home. A May 24, 2024 permit describes replacing kitchen and washing machine drain lines; an October 29, 2025 permit covers replacing an existing water heater. Both permits are marked final.
Summarized from City of Austin records · updated Oct 29, 2025
- Projects
- 2
- 2 filings
- Latest filing
- Oct 29, 2025
- since May 24, 2024
- Largest scope
- —
- Listed value
- —
Where this project stands
FinaledReplacement of an existing water heater
- AppliedOct 17, 2025
- IssuedOct 29, 2025
- WorkOct '25 – Feb '26
- Final inspectionFeb 23, 2026
Passed final inspection Feb 23, 2026.
1 contact on this project · 1 phone number
Permit & project history
2 projectsReplacement of an existing water heater
Replacement of an existing water heater
City of Austin permitPlumbing PermitFinal- Record
- 2025-134769 PP
- Owner
- Pro
- Contractor
- Pro
- Contact
- Pro
Tunnel under home to replace kitchen and washing machine drain lines
Tunnel under home to replace kitchen and washing machine drain lines
City of Austin permitPlumbing PermitFinal- Record
- 2024-063732 PP
- Owner
- Pro
- Contractor
- Pro
- Contact
- Pro
Sources: City of Austin
Questions about 2302 Standish Dr
What work was permitted at 2302 Standish Dr?
City of Austin records list drain-line replacement under permit 2024-063732 PP and replacement of an existing water heater under permit 2025-134769 PP. Both permits are marked final.
When were permits filed for 2302 Standish Dr?
The drain-line permit was filed May 24, 2024, and the water-heater permit was filed October 29, 2025.
Is a new home being built at 2302 Standish Dr?
The permits in the record describe plumbing work at a home, not construction of a new home. They cover drain-line and water-heater replacement.
What does permit 2024-063732 PP cover at 2302 Standish Dr?
The May 24, 2024 City of Austin plumbing permit describes tunneling under the home to replace kitchen and washing machine drain lines. Its status is final.
What does permit 2025-134769 PP cover at 2302 Standish Dr?
The October 29, 2025 City of Austin plumbing permit covers replacement of an existing water heater. Its status is final.
Also being built nearby
All of 78745- 2300 Standish DrDec 10, 2024Replacement of complete existing central heat and air system with or without duct work 1 system 4 ton straight cool gas furnace · 17 m away
- 2304 Standish DrJul 29, 2026Install additional 2.64 kw dc rooftop solar system and an additional 10.0 kwh energy storage system to existing residential · 23 m away
- 2306 Standish DrMay 1, 2026Addition and remodel: interior to be completely gutted. some walls to be removed or relocated. all windows and doors to be replaced. minor electrical and plumbing work. replacing roof. exterior work involves a small added patio under front entry area and a small deck in the backyard entry area. front fence relocation. revision 01 to add mp · 46 m away
- 2403 Gateshead CirAug 25, 2025Replacement of complete existing central heat and air system with or without duct work · 49 m away
- 2307 Whitestone DrMay 2, 2024Tunnel under slab foundation and replace call cast iron with new pvc 2 access points one through floor in garage and one near exterior front door. 50 total feet of tunnel under slab and new sewer yard line from house tro city sewer tap. *emergency · 51 m away
- 2302 Whitestone DrJul 9, 2026Tunnel under foundation to replace cast iron drain lines for 2 full bathrooms kitchen and washer drain lines. 2 access holes will be made one in the front side by doorway entrance and the second by the garage to tunnel and reroute kitchen and second bathroom total length of tunnel is approximately 60 feet of tunnel. sewer line will be replaced from the home to the city tap connection total length of sewer line is approximately 70 feet · 77 m away
- 2303 Whitestone DrJun 4, 2025Replace main panel · 99 m away
- 2300 Whitestone DrDec 1, 2025Ev charger installation · 100 m away
- 2307 Berry Hill CirDec 17, 2024Upgrading existing service to 200amps · 108 m away
- 2301 Whitestone DrJan 5, 2026Replacing building sewer line. tunneling up to 70 feet · 120 m away
- 2306 Brookhill DrApr 11, 2025Dig though ground under foundation to tunnel out and replace up to 50 feet of sewer line. this is for the kitchen and laundry lines only · 120 m away
- 2300 Brookhill DrJun 26, 2025Installing a 125amp main breaker panel and meter can (underground) · 120 m away
More restaurants in 78745.