2403 Gateshead Cir
Austin, TX 78745
2403 Gateshead Cir: 1 project on record
City of Austin lists 1 filing across 1 project at 2403 Gateshead Cir, Austin, TX 78745. The most recent, filed August 25, 2025, covers: “Replacement of complete existing central heat and air system with or without duct work”.
Compiled from City of Austin records · updated Aug 25, 2025
- Projects
- 1
- 1 filings
- Latest filing
- Aug 25, 2025
- since Aug 25, 2025
- Largest scope
- —
- Listed value
- —
Where this project stands
Permit expiredReplacement of complete existing central heat and air system with or without duct work
- AppliedAug 18, 2025
- IssuedAug 25, 2025
- !WorkAug '25 – Feb '26
- Final inspection
Marked expired Feb 22, 2026.
1 contact on this project · 1 phone number
Permit & project history
1 projectReplacement of complete existing central heat and air system with or without duct work
Replacement of complete existing central heat and air system with or without duct work
City of Austin permitMechanical PermitExpired- Record
- 2025-104701 MP
- Owner
- Pro
- Contractor
- Pro
- Contact
- Pro
Sources: City of Austin
Questions about 2403 Gateshead Cir
What is being built at 2403 Gateshead Cir?
The latest filing (City of Austin permit 2025-104701 MP, August 25, 2025) covers replacement of complete existing central heat and air system with or without duct work.
How many permits and filings does 2403 Gateshead Cir have?
1 filing across 1 project, from August 25, 2025 to August 25, 2025.
Is there other construction near 2403 Gateshead Cir?
Yes. Nearby filings include 2304 Standish Dr (install additional 2.64 kw dc rooftop solar system and an additional 10.0 kwh energy storage system to existing residential, Jul 29, 2026); 2306 Standish Dr (addition and remodel: interior to be completely gutted. some walls to be removed or relocated. all windows and doors to be replaced. minor electrical and plumbing work. replacing roof. exterior work involves a small added patio under front entry area and a small deck in the backyard entry area. front fence relocation. revision 01 to add mp, May 1, 2026); 2302 Standish Dr (replacement of an existing water heater, Oct 29, 2025).
How do I get alerts for new permits at 2403 Gateshead Cir?
Watch this address on groundranger and you'll get an email when a new permit or project filing appears here or nearby.
Also being built nearby
All of 78745- 2304 Standish DrJul 29, 2026Install additional 2.64 kw dc rooftop solar system and an additional 10.0 kwh energy storage system to existing residential · 41 m away
- 2306 Standish DrMay 1, 2026Addition and remodel: interior to be completely gutted. some walls to be removed or relocated. all windows and doors to be replaced. minor electrical and plumbing work. replacing roof. exterior work involves a small added patio under front entry area and a small deck in the backyard entry area. front fence relocation. revision 01 to add mp · 44 m away
- 2302 Standish DrOct 29, 2025Replacement of an existing water heater · 49 m away
- 2300 Standish DrDec 10, 2024Replacement of complete existing central heat and air system with or without duct work 1 system 4 ton straight cool gas furnace · 60 m away
- 2307 Berry Hill CirDec 17, 2024Upgrading existing service to 200amps · 78 m away
- 5705 Buffalo PassApr 15, 2026Replacement of complete existing central heat and air system with or without duct work upflow in closet · 82 m away
- 2307 Whitestone DrMay 2, 2024Tunnel under slab foundation and replace call cast iron with new pvc 2 access points one through floor in garage and one near exterior front door. 50 total feet of tunnel under slab and new sewer yard line from house tro city sewer tap. *emergency · 99 m away
- 5702 Buffalo PassSep 25, 2024Replacement of complete existing central heat and air system with or without duct work · 117 m away
- 2302 Whitestone DrJul 9, 2026Tunnel under foundation to replace cast iron drain lines for 2 full bathrooms kitchen and washer drain lines. 2 access holes will be made one in the front side by doorway entrance and the second by the garage to tunnel and reroute kitchen and second bathroom total length of tunnel is approximately 60 feet of tunnel. sewer line will be replaced from the home to the city tap connection total length of sewer line is approximately 70 feet · 122 m away
- 5802 Gateshead DrMar 26, 2024Interior remodel · 125 m away
- 5809 Buffalo PassAug 12, 2025Replacement of complete existing central heat and air system with or without duct work · 125 m away
- 2306 Brookhill DrApr 11, 2025Dig though ground under foundation to tunnel out and replace up to 50 feet of sewer line. this is for the kitchen and laundry lines only · 145 m away