New warehouses & industrial in Austin 78756
14 addresses in 78756 have permits or project filings for warehouses & industrial in the last two years. The most recent was filed at 1509 North St.
Latest filings
- 1509 North StNov 6, 2026Non-structural remodel for existing warehouse
- 5600 Sunshine Dr · Mccallum High SchoolOct 12, 2026Fireline permit per steve leitch: 2025-023926 pr sp-2024-0408cx
- 4208 Medical PkwySep 24, 2026New irrigation system installation
- 2603 Northland DrSep 4, 2026Base: installing a backup battery system and additional meter socket
- 4013 Ramsey AveSep 3, 2026Addition/ interior remodel to existing 2-unit use single-family residential 1-story to include: remodel of existing 1st floor to include mud room utility room laundry room 1 bath and large closet; 2nd story addition to include: 2 bedroom 1 bath and storage area; replacement of all windows adding sheathing to the older portion of the home reinsulating the walls and repainting the whole house
- 5800 Burnet RdAug 10, 2026Replace the main distribution panel. install a 225 amp tpl terminate the 4 feeder circuits into the tpl to provide electricity to the business while the main distribution panel is being replaced. demolition the existing main distribution panel. install the new main distribution
- 2310 Shoalmont DrJul 23, 2026Replacement of complete existing central heat and air system with or without duct work
- 4609 Shoalwood AveJul 6, 2026Replacement of outdoor tankless gas water heater
- 4415 Shoalwood AveJun 29, 2026Install new energy storage system to existing single family residence. ae
- 5611 Adams AveJun 18, 2026Demolition of an existing metal warehouse structure approximately 2499 square feet originally constructed circa 1955. 2026 022559 da - approved
- 5111 Burnet RdJun 11, 2026Existing mercantile facility for delivery operation. scope of work is limited to the interior modification to approximately 500 sq ft of the existing single story retail storage area to provide an accessory commercial coffee kitchen. renovation includes new equipment minor framing plumbing mechanical and electrical work
- 5343 Burnet RdMay 18, 2026Replacing grease trap. have gotten approval letter some austin water industrial waste
- 5222 Woodrow AveMay 18, 2026Install new 8.265kw rooftop solar system for existing residential only
- 5012 Shoal Creek BlvdMar 11, 2026Install new 13.34 kw dc rooftop solar system and 30.0 kwh energy storage system to existing residential
- 5107 Woodrow AveMar 9, 2026Relocate existing electric residential water heater to a new interior closet location. drain disconnect remove and properly dispose of existing water heater. extend and modify existing domestic hot and cold water distribution piping to serve new water heater location. install customer-provided electric storage-type water heater with required full-port shutoff valve approved drain pan pan drain piped by gravity to an approved exterior termination and temperature and pressure (t&p) relief valve discharge piping routed to an approved exterior termination in accordance with the 2021 uniform plumbing code as adopted by the city of austin. install new laundry rough-in including recessed washer outlet box with hot and cold supplies standpipe and trapped 2-inch waste connection. install approximately 50 linear feet of new 2-inch schedule 40 pvc sanitary drain piping along the exterior of the structure and connect to existing building drain upstream of the sewage ejector system using approved fittings and methods
- 4612 Burnet RdDec 3, 2025Change of use from office/warehouse to tattoo parlor and interior remodel 2025 105943 da - approved
- 5511 Joe Sayers AveNov 4, 2025Tceq-compliant components: * 1 dca backflow preventer (in-ground): required by tceq to protect the public water supply from contamination. this device will be tested and registered with the city upon completion. * 1 isolation valve: also required by tceq this allows for emergency shutoff of the irrigation system without affecting the homes water supply. * two 1 master valves (one per controller): as per tceq code a master valve is required for each controller to help prevent line leaks or water loss when the system is off. irrigation zones: * four irrigreen rotor zones: these precision digital rotors map watering patterns for each turf zone reducing overspray and maximizing efficiency. * two drip irrigation zones: installed for landscape beds these zones use subsurface drip tubing with 12 emitter spacing to deliver water directly to plant roots. installation details: * trenching: all piping will be installed at 810 inches deep using trenchers or hand tools depending on site conditions. * controllers and wiring: system will include complete controller installation wiring and testing
- 5111 Burnet Road · 5111 Burnet Road LPSep 16, 2025Gopuff — renovation/alteration — interior tenant fit out. @ new ada toilet rooms, break room and storage units. see cover sheet of documents for entire scope of work
- 4105 Sinclair AveAug 15, 2025Remove the existing electrical service equipment from the existing service pole. install a new 150 amp main breaker service panel and meter loop on the existing pole. connect existing loads to new panel. remove the 100 amp conductors from the existing conduit to the house and install new 150 amp rated conductors to the house 150 amp main breaker service panel
- 4412 Bellvue AveJul 15, 2025Construct new driveway approach of 10 ft. driveway approach is from the alley
- 4417 Marathon BlvdApr 7, 2025Attic conversion to living space and storage office/wetbar/craft space additional living space small closet storage room
- 1100 W. 49th Street · Texas Facilities CommissionJan 29, 2025Tfc dm 20-21 hazardous chemical stor. building — new construction — newly constructed hazardous chemical storage building to replace existing chemical storage facility
- 3804 Bailey LnDec 19, 2024Interior remodel - replace all wood and tile flooring on the 1st floor with same. replace carpet on staircase with same. replace back door to patio with same. replace swinging door to powder room with pocket door. install shower in the storage closet in powder room replace countertop and backsplash in kitchen. replace ceiling in attached 3 car garage with r38 and new drywall. replace carpet all on th 2nd fl with wood. paint all walls ceilings and cabinets
- 5500 Shoalwood AveNov 13, 2024New single story single family residence with 2 bedrooms 2.5 bathrooms covered porches attached garage and attached carport
- 3808 Tonkawa TrlNov 12, 202450 amp overhead temporary meter loop ref: 2024-068461 bp
- 1601 Houston StOct 22, 2024Install an ev charger in the garage. will have to run emt conduit exposed on the home then go through the exterior wall of the garage and continue to run conduit in the garage to the customer preferred location
- 5500 Woodrow AveSep 17, 2024Install new 9.875kw rooftop solar system and 11.5kw energy storage system for existing residential only
- 1100 W 39th Half StJun 13, 2024Renovation of the tenant space including the exam rooms chartings offices check in/out staff lounge storage scheduler screening lab restrooms and weight and measures alcoves
- 5005 Woodview AveMar 4, 2024Installation of 3.95 kw solar pv system
- 5715 Burnet RdDec 18, 2015North burnet self storage
- 5701 Burnet RdSep 17, 2015North burnet self storage
- 814 North Loop BlvdMar 2, 2007North loop mini-storage
Questions
What warehouses & industrial are being built in Austin 78756?
14 addresses in 78756 have permits or project filings for warehouses & industrial in the last two years. The most recent was filed at 1509 North St. Others include 5600 Sunshine Dr, 4208 Medical Pkwy, 2603 Northland Dr.
How can I find out when a new industrial project is permitted near me?
Watch your ZIP code or address on groundranger to get an email as soon as a new industrial project permit is filed.