5500 Woodrow Ave
Austin, TX 78756
5500 Woodrow Ave: 2 projects on record
City of Austin lists 2 filings across 2 projects at 5500 Woodrow Ave, Austin, TX 78756 since September 4, 2024. The most recent, filed September 17, 2024, covers: “Install new 9.875kw rooftop solar system and 11.5kw energy storage system for existing residential only”.
Compiled from City of Austin records · updated Sep 17, 2024
- Projects
- 2
- 2 filings
- Latest filing
- Sep 17, 2024
- since Sep 4, 2024
- Largest scope
- —
- Listed value
- —
Where this project stands
FinaledInstall new 9.875kw rooftop solar system and 11.5kw energy storage system for existing residential only
- AppliedAug 26, 2024
- IssuedSep 17, 2024
- WorkSep '24 – Nov '24
- Final inspectionNov 25, 2024
Passed final inspection Nov 25, 2024.
1 contact on this project · 1 phone number
Permit & project history
2 projectsInstall new 9.875kw rooftop solar system and 11.5kw energy storage system for existing residential only
Install new 9.875kw rooftop solar system and 11.5kw energy storage system for existing residential only
City of Austin permitElectrical PermitFinal- Record
- 2024-108814 EP
- Owner
- Pro
- Contractor
- Pro
- Contact
- Pro
Disconnect/reconnect power to tie in pv/ess components and install a tesla socket mounted backup switch that is rated up to 200amp. we are not upgrading the size of the service not upgrading the meter size
Disconnect/reconnect power to tie in pv/ess components and install a tesla socket mounted backup switch that is rated up to 200amp. we are not upgrading the size of the service not upgrading the meter size
City of Austin permitElectrical PermitFinal- Record
- 2024-108828 EP
- Owner
- Pro
- Contractor
- Pro
- Contact
- Pro
Sources: City of Austin
Questions about 5500 Woodrow Ave
What is being built at 5500 Woodrow Ave?
The latest filing (City of Austin permit 2024-108814 EP, September 17, 2024) covers install new 9.875kw rooftop solar system and 11.5kw energy storage system for existing residential only.
How many permits and filings does 5500 Woodrow Ave have?
2 filings across 2 projects, from September 4, 2024 to September 17, 2024.
Is there other construction near 5500 Woodrow Ave?
Yes. Nearby filings include 5503 Woodrow Ave (service upgrade of 150amp overhead with failing equipment to a new 200amp, Aug 18, 2026); 5506 Woodrow Ave (replacement of complete existing central heat and air system with or without duct work, Sep 15, 2025); 5507 Woodrow Ave (irrigation system, Mar 6, 2025).
How do I get alerts for new permits at 5500 Woodrow Ave?
Watch this address on groundranger and you'll get an email when a new permit or project filing appears here or nearby.
Also being built nearby
All of 78756- 5503 Woodrow AveAug 18, 2026Service upgrade of 150amp overhead with failing equipment to a new 200amp · 45 m away
- 5506 Woodrow AveSep 15, 2025Replacement of complete existing central heat and air system with or without duct work · 52 m away
- 5507 Woodrow AveMar 6, 2025Irrigation system · 60 m away
- 5406 Woodrow AveApr 22, 2024Upstairs only unit # b - replacement of complete existing central heat and air system with or without duct work · 74 m away
- 5409 Woodrow AveJul 21, 2025Replacement of complete existing central heat and air system with or without duct work replacing the upstairs system only. lennox 2 ton · 90 m away
- 5505 Joe Sayers AveDec 18, 2025Express- removal of current composition shingle roof covering. re-roof with composition shingle and new underlayment · 106 m away
- 5409 Joe Sayers AveJun 24, 2025Replacement of an existing water heater 5409 joe sayers avenue austin tx 78756 · 109 m away
- 5511 Joe Sayers AveNov 4, 2025Tceq-compliant components: * 1 dca backflow preventer (in-ground): required by tceq to protect the public water supply from contamination. this device will be tested and registered with the city upon completion. * 1 isolation valve: also required by tceq this allows for emergency shutoff of the irrigation system without affecting the homes water supply. * two 1 master valves (one per controller): as per tceq code a master valve is required for each controller to help prevent line leaks or water loss when the system is off. irrigation zones: * four irrigreen rotor zones: these precision digital rotors map watering patterns for each turf zone reducing overspray and maximizing efficiency. * two drip irrigation zones: installed for landscape beds these zones use subsurface drip tubing with 12 emitter spacing to deliver water directly to plant roots. installation details: * trenching: all piping will be installed at 810 inches deep using trenchers or hand tools depending on site conditions. * controllers and wiring: system will include complete controller installation wiring and testing · 118 m away
- 5516 Woodrow AveMay 24, 2024Replacement of an existing water heater · 120 m away
- 5518 Woodrow AveAug 14, 2025Construct new driveway approach of 12 ft. no sidewalk inspection per plan review · 133 m away
- 5502 Joe Sayers AveOct 1, 2024Replacing damaged overhead · 135 m away
- 5411 Roosevelt AveJul 8, 2026Replacement of complete existing central heat and air system with or without duct work · 149 m away
More warehouses & industrial in 78756, solar installs in 78756.