4612 Burnet Rd
Austin, TX 78756
4612 Burnet Rd permitted for tattoo parlor remodel
A change of use from office/warehouse to a tattoo parlor, along with an interior remodel, was permitted at 4612 Burnet Rd on Dec. 3, 2025. The City of Austin lists permit 2025-146244 BP as final.
Summarized from City of Austin records · updated Dec 3, 2025
- Projects
- 2
- 2 filings
- Latest filing
- Dec 3, 2025
- since Mar 24, 2024
- Largest scope
- —
- Listed value
- —
Where this project stands
FinaledChange of use from office/warehouse to tattoo parlor and interior remodel 2025 105943 da - approved
- AppliedSep 2, 2025
- IssuedDec 3, 2025
- WorkDec '25 – Jan '26
- Final inspectionJan 30, 2026
Passed final inspection Jan 30, 2026.
2 contacts on this project · 2 phone numbers
Permit & project history
2 projectsChange of use from office/warehouse to tattoo parlor and interior remodel 2025 105943 da - approved
Change of use from office/warehouse to tattoo parlor and interior remodel 2025 105943 da - approved
City of Austin permitBuilding PermitFinal- Record
- 2025-146244 BP
- Tenant / owner
- Pro
- Contractor
- Pro
- Contact
- Pro
Sources: City of Austin
Questions about 4612 Burnet Rd
What is being built at 4612 Burnet Rd?
A City of Austin permit describes a change of use from office/warehouse to a tattoo parlor and an interior remodel. Permit 2025-146244 BP is dated Dec. 3, 2025, and listed as final.
When was the tattoo parlor permit filed?
The City of Austin record for permit 2025-146244 BP is dated Dec. 3, 2025. Its status is listed as final.
What's changing near Pacha on Burnet Road?
A permit for 4612 Burnet Rd describes a change from office/warehouse use to a tattoo parlor, with an interior remodel. The nearby activity record lists Pacha coffee house at 4618 Burnet Rd.
Is a tattoo parlor opening at 4612 Burnet Rd?
The Dec. 3, 2025 permit describes a change of use to a tattoo parlor and an interior remodel. The record does not give an opening date.
What happened to the Bramlett Office Development plan?
The City of Austin recorded a site-plan case named Bramlett Office Development on March 24, 2024. That case, 13054509, is listed as expired.
Is 4612 Burnet Rd still planned as an office development?
The Bramlett Office Development site-plan case is listed as expired. A later permit dated Dec. 3, 2025 describes a change of use from office/warehouse to a tattoo parlor.
Also being built nearby
All of 78756- 4618 Burnet RdMar 2, 2007Pacha coffee house · 15 m away
- 4634 Burnet RdSep 11, 2025Gas repair 1 water heater replacement · 16 m away
- 4636 Burnet RdJun 5, 2026Replace meter socket 200amp 1ph heat damaged · 17 m away
- 4609 Rosedale AveOct 14, 2024Replacement of complete existing central heat and air system with or without duct work · 52 m away
- 4605 Rosedale AveDec 15, 2025Replacement of complete existing central heat and air system with or without duct work · 53 m away
- 4606 Rosedale AveDec 21, 2023Restore gas to home · 95 m away
- 4610 Rosedale AveMay 1, 2025Replacement of complete existing central heat and air system with or without duct work · 98 m away
- 4602 Rosedale AveJun 19, 2025Replacement of complete existing central heat and air system with or without duct work · 99 m away
- 4517 Rosedale AveDec 8, 2025Install one (1) eg4 flexboss 21 hybrid inverter (240 v 16 kw ac output) and three (3) eg4 powerpro all-weather lithium batteries (51.2 vdc 280 ah each; 14.3 kwh per unit 42.9 kwh total) at the existing residence. equipment will be wall-mounted on the northeast exterior garage wall adjacent to existing pv inverters and service equipment. the system will integrate with two existing solaredge inverters (se-10000h & se-7600h) serving a 17.6 kwdc / 17.6 kwac rooftop pv array. the new hybrid inverter and battery system will be interconnected through an eg4 gridboss micro-grid interconnection device providing backup load capability and grid-interactive operation. ac output from the flexboss 21 will connect to the gridboss and then to the existing 200 a main service panel (240 v 1-phase 3-wire underground service). new conductors will be copper thwn-2 in emt conduit sized per nec 690.8 240 and 310.15 for a maximum 66.7 a inverter output. ocpds and disconnects will be provided per nec 705.12 and 706.15. a visible lockable labeled ac disconnect will be installed within 5 feet of the utility meter (austin energy #7163517). all components will be ul listed and installed per manufacturers specifications //ifc and city of austin electrical code. system includes rapid-shutdown functionality proper signage and labeling per nec 690 and 705. no structural modifications are required. work includes conduit routing grounding electrode bonding labeling commissioning and verification of interconnection with austin energy prior to energization · 104 m away
- 4612 Rosedale AveJul 15, 2026Replacement of complete existing central heat and air system with or without duct work like for like: 2 ton horizontal gas system · 105 m away
- 4516 Rosedale AveNov 5, 2026Addition- conditioning the existing accessory structure adding a bathroom and outdoor kitchen. scope also includes a carport and installing a new door at the existing house · 128 m away
- 4513 Rosedale AveJun 4, 2026Replacement of complete existing central heat and air system with or without duct work like for like: 2 ton vertical heat pump system (upstairs) · 130 m away