4517 Rosedale Ave
Austin, TX 78756
Battery backup system permitted at 4517 Rosedale Ave
A hybrid inverter and three lithium batteries are being added to the existing solar system at this residence. The City of Austin issued electrical permit 2025-135982 EP on December 8, 2025; the system is designed to provide backup loads and operate alongside the existing rooftop solar array.
Summarized from City of Austin records · updated Dec 8, 2025
- Projects
- 5
- 5 filings
- Latest filing
- Dec 8, 2025
- since Mar 4, 2024
- Largest scope
- —
- Listed value
- —
Where this project stands
FinaledInstall one (1) eg4 flexboss 21 hybrid inverter (240 v 16 kw ac output) and three (3) eg4 powerpro all-weather lithium batteries (51.2 vdc 280 ah each; 14.3 kwh per unit 42.9 kwh total) at the existing residence. equipment will be wall-mounted on the northeast exterior garage wall adjacent to existing pv inverters and service equipment. the system will integrate with two existing solaredge inverters (se-10000h & se-7600h) serving a 17.6 kwdc / 17.6 kwac rooftop pv array. the new hybrid inverter and battery system will be interconnected through an eg4 gridboss micro-grid interconnection device providing backup load capability and grid-interactive operation. ac output from the flexboss 21 will connect to the gridboss and then to the existing 200 a main service panel (240 v 1-phase 3-wire underground service). new conductors will be copper thwn-2 in emt conduit sized per nec 690.8 240 and 310.15 for a maximum 66.7 a inverter output. ocpds and disconnects will be provided per nec 705.12 and 706.15. a visible lockable labeled ac disconnect will be installed within 5 feet of the utility meter (austin energy #7163517). all components will be ul listed and installed per manufacturers specifications //ifc and city of austin electrical code. system includes rapid-shutdown functionality proper signage and labeling per nec 690 and 705. no structural modifications are required. work includes conduit routing grounding electrode bonding labeling commissioning and verification of interconnection with austin energy prior to energization
- AppliedOct 20, 2025
- IssuedDec 8, 2025
- WorkDec '25 – Jun '26
- Final inspectionFeb 10, 2026
Passed final inspection Feb 10, 2026.
1 contact on this project · 1 phone number
Permit & project history
5 projectsInstall one (1) eg4 flexboss 21 hybrid inverter (240 v 16 kw ac output) and three (3) eg4 powerpro all-weather lithium batteries (51.2 vdc 280 ah each; 14.3 kwh per unit 42.9 kwh total) at the existing residence. equipment will be wall-mounted on the northeast exterior garage wall adjacent to existing pv inverters and service equipment. the system will integrate with two existing solaredge inverters (se-10000h & se-7600h) serving a 17.6 kwdc / 17.6 kwac rooftop pv array. the new hybrid inverter and battery system will be interconnected through an eg4 gridboss micro-grid interconnection device providing backup load capability and grid-interactive operation. ac output from the flexboss 21 will connect to the gridboss and then to the existing 200 a main service panel (240 v 1-phase 3-wire underground service). new conductors will be copper thwn-2 in emt conduit sized per nec 690.8 240 and 310.15 for a maximum 66.7 a inverter output. ocpds and disconnects will be provided per nec 705.12 and 706.15. a visible lockable labeled ac disconnect will be installed within 5 feet of the utility meter (austin energy #7163517). all components will be ul listed and installed per manufacturers specifications //ifc and city of austin electrical code. system includes rapid-shutdown functionality proper signage and labeling per nec 690 and 705. no structural modifications are required. work includes conduit routing grounding electrode bonding labeling commissioning and verification of interconnection with austin energy prior to energization
Install one (1) eg4 flexboss 21 hybrid inverter (240 v 16 kw ac output) and three (3) eg4 powerpro all-weather lithium batteries (51.2 vdc 280 ah each; 14.3 kwh per unit 42.9 kwh total) at the existing residence. equipment will be wall-mounted on the northeast exterior garage wall adjacent to existing pv inverters and service equipment. the system will integrate with two existing solaredge inverters (se-10000h & se-7600h) serving a 17.6 kwdc / 17.6 kwac rooftop pv array. the new hybrid inverter and battery system will be interconnected through an eg4 gridboss micro-grid interconnection device providing backup load capability and grid-interactive operation. ac output from the flexboss 21 will connect to the gridboss and then to the existing 200 a main service panel (240 v 1-phase 3-wire underground service). new conductors will be copper thwn-2 in emt conduit sized per nec 690.8 240 and 310.15 for a maximum 66.7 a inverter output. ocpds and disconnects will be provided per nec 705.12 and 706.15. a visible lockable labeled ac disconnect will be installed within 5 feet of the utility meter (austin energy #7163517). all components will be ul listed and installed per manufacturers specifications //ifc and city of austin electrical code. system includes rapid-shutdown functionality proper signage and labeling per nec 690 and 705. no structural modifications are required. work includes conduit routing grounding electrode bonding labeling commissioning and verification of interconnection with austin energy prior to energization
City of Austin permitElectrical PermitFinal- Record
- 2025-135982 EP
- Owner
- Pro
- Contractor
- Pro
- Contact
- Pro
Construct new like for like driveway approach of 12 ft
Construct new like for like driveway approach of 12 ft
City of Austin permitDriveway / SidewalksFinal- Record
- 2024-111237 DS
- Owner
- Pro
- Contractor
- Pro
- Contact
- Pro
Repair - unsafe electrical enclosure found in attic. correction required to close aux permit with ae
Repair - unsafe electrical enclosure found in attic. correction required to close aux permit with ae
City of Austin permitElectrical PermitFinal- Record
- 2024-035389 EP
- Owner
- Pro
- Contractor
- Pro
- Contact
- Pro
Repair reverse wired pv meter. - solar already has pto
Repair reverse wired pv meter. - solar already has pto
City of Austin permitElectrical PermitFinal- Record
- 2024-017283 EP
- Owner
- Pro
- Contractor
- Pro
- Contact
- Pro
Replace existing sprinkler system
Replace existing sprinkler system
City of Austin permitPlumbing PermitFinal- Record
- 2023-072626 PP
- Owner
- Pro
- Contractor
- Pro
- Contact
- Pro
Sources: City of Austin
Questions about 4517 Rosedale Ave
What is being installed at 4517 Rosedale Ave?
A City of Austin permit describes a hybrid inverter and three lithium batteries being added to the existing residence. The permit was filed December 8, 2025, under 2025-135982 EP.
Is a new solar system being built at 4517 Rosedale Ave?
The permit describes new inverter and battery equipment integrated with an existing 17.6 kW rooftop solar array. It does not describe a new solar array.
How much battery storage is planned at 4517 Rosedale Ave?
The permit lists three batteries rated at 14.3 kWh each, for 42.9 kWh total. The system also includes a 16 kW AC-output hybrid inverter.
Will the batteries provide backup power at 4517 Rosedale Ave?
The permit says the system will provide backup load capability and grid-interactive operation. It was filed with the City of Austin on December 8, 2025.
What other work was permitted at 4517 Rosedale Ave?
Other City of Austin records include a 12-foot like-for-like driveway approach permit filed September 12, 2024, and electrical repair permits filed March 4 and March 22, 2024.
Also being built nearby
All of 78756- 4513 Rosedale AveJun 4, 2026Replacement of complete existing central heat and air system with or without duct work like for like: 2 ton vertical heat pump system (upstairs) · 29 m away
- 4516 Rosedale AveNov 5, 2026Addition- conditioning the existing accessory structure adding a bathroom and outdoor kitchen. scope also includes a carport and installing a new door at the existing house · 39 m away
- 4511 Rosedale AveJan 3, 2024New 2-story 4 bedroom 2 bathroom single family residence with covered front porch rear covered patio uncovered wood deck and 2nd floor covered deck · 47 m away
- 4510 Rosedale AveJan 24, 2025Digging up by city meter and trenching towards the front left corner of the house where we will then install a new water service which will be ran in three-quarter pex piping. this includes excavation and backfill.( beyond wow is not responsible for replacement of grass or landscaping.)a whole house shut off and pressure reducing valve will be installed with water pressure set to 65 psi. we will then enter underneath the house and connect onto existing cold water system. we will then catch the hot water system from heater and begin re-piping the whole hot potable water side using red pex both 3/4 and 1/2 to perform re-pipe water heater was replaced · 59 m away
- 4508 Rosedale AveJul 12, 2024Install evse · 72 m away
- 4602 Rosedale AveJun 19, 2025Replacement of complete existing central heat and air system with or without duct work · 74 m away
- 4605 Rosedale AveDec 15, 2025Replacement of complete existing central heat and air system with or without duct work · 75 m away
- 4606 Rosedale AveDec 21, 2023Restore gas to home · 103 m away
- 4612 Burnet RdDec 3, 2025Change of use from office/warehouse to tattoo parlor and interior remodel 2025 105943 da - approved · 104 m away
- 4609 Rosedale AveOct 14, 2024Replacement of complete existing central heat and air system with or without duct work · 105 m away
- 4503 Rosedale AveJun 8, 2026Replacement of an existing water heater we will be replacing the gas tank water heater with a similar model · 106 m away
- 4509 Ramsey AveOct 27, 2026Replacement of complete existing central heat and air system with or without duct work · 111 m away
More solar installs in 78756.