120 Corporate Drive
Bastrop, TX 78602 · Bastrop Fire Station 2
Bastrop Fire Station 2 interior remodel
Bastrop Fire Station 2 is being remodeled to make the existing station suitable for full-time professional firefighters. The 3,420-square-foot renovation was registered with TDLR on January 22, 2024, with an estimated project cost of $480,000. Its status is listed as Inspection Complete.
Summarized from Texas Department of Licensing and Regulation records · updated Jan 22, 2024
- Projects
- 1
- 1 filings
- Latest filing
- Jan 22, 2024
- since Jan 22, 2024
- Largest scope
- 3,420 sf
- Estimated cost
- $480K
- state registration
Where this project stands
Inspected · closing outInterior Remodel
3,420 sq ft · $480K est.
- RegisteredJan 22, 2024
- Plan review
- ConstructionMar '24 – Dec '24
- Inspected
- Closednow
The building is substantially done. Move-in, fit-out and service work usually follow.
4 contacts on this project · 2 phone numbers
Permit & project history
1 projectThe overall goal of the project is to remodel the existing bfd fire station #2 to make the space suitable for full time professional firefighters. — bastrop fire station 2
TDLR project registrationRenovation/AlterationInspection Complete3,420 sq ft$480K est.- Project #
- TABS2024009811
- Tenant / owner
- Interior Remodel
- Design firm
- Pro
- Contact
- Pro
Sources: Texas Department of Licensing and Regulation
Questions about 120 Corporate Drive
What is being built at 120 Corporate Drive in Bastrop?
The project is an interior remodel of the existing Bastrop Fire Station 2, intended to make it suitable for full-time professional firefighters. It is a renovation, not a new station.
When was the Bastrop Fire Station 2 remodel registered?
The TDLR project registration was filed January 22, 2024. The project number is TABS2024009811.
How large is the Fire Station 2 remodel?
The TDLR registration lists 3,420 square feet for the interior remodel.
How much will the Bastrop Fire Station 2 renovation cost?
The applicant's estimated project cost is $480,000, according to TDLR registration TABS2024009811.
Is the Bastrop Fire Station 2 remodel complete?
The TDLR project record lists the status as Inspection Complete.
What is happening near 106 Industry Drive and Tahitian in Bastrop?
A separate TDLR record describes a multi-tenant building shell project at 106 Industry Drive and Tahitian, with 8,960 square feet of new construction and site work. The filing date is October 1, 2026.