650 Cool Water Drive, Bastrop, Tx78602
Bastrop, TX 78602 · Board Of Regents Of The University Of Texas System
HVAC replacement and alterations at MD Anderson’s Bastrop facility
A project registered with TDLR on August 18, 2026, calls for HVAC replacement and alterations to reconfigure an existing animal holding area at the MD Anderson Bastrop Building 708A non-human primate PET isolation facility. The registration lists 3,250 square feet and an applicant-estimated project cost of $1,026,000.
Summarized from Texas Department of Licensing and Regulation records · updated Aug 18, 2026
- Projects
- 1
- 1 filings
- Latest filing
- Aug 18, 2026
- since Aug 18, 2026
- Largest scope
- 3,250 sf
- Estimated cost
- $1.0M
- state registration
Where this project stands
In state plan reviewHVAC End of Life Renewal / Space alterations to accommodate Non-Human Primate PET Isolation Fac.
3,250 sq ft · $1.0M est.
- RegisteredAug 18, 2026
- Plan reviewnow
- ConstructionJul '27 – Dec '27
- Inspected
- Closed
Construction is scheduled to start Jul 1, 2027. Subcontractors and suppliers are usually picked in the weeks before.
4 contacts on this project · 3 phone numbers
Permit & project history
1 projectReplacement of the hvac equipment, subdivision of existing animal holding area for new configuration — md anderson bastrop building - 708a, non-human primate pet isolation facility
TDLR project registrationRenovation/AlterationProject Registered3,250 sq ft$1.0M est.- Project #
- TABS2026028176
- Tenant / owner
- Hvac End Of Life Renewal / Space Alterations To Accommodate Non-Human Primate Pet Isolation Fac.
- Design firm
- Pro
- Contact
- Pro
Sources: Texas Department of Licensing and Regulation
Questions about 650 Cool Water Drive, Bastrop, Tx78602
What is happening at 650 Cool Water Drive in Bastrop?
A TDLR registration describes HVAC replacement and alterations to reconfigure an existing animal holding area at the MD Anderson Bastrop Building 708A non-human primate PET isolation facility. The project was registered August 18, 2026.
Is a new building being built at 650 Cool Water Drive?
The TDLR registration describes renovation and alteration work, not a new building: HVAC equipment will be replaced and an existing animal holding area reconfigured.
When was the Bastrop facility project registered?
It was registered with the Texas Department of Licensing and Regulation on August 18, 2026. Its registration number is TABS2026028176.
How large is the project at 650 Cool Water Drive?
The TDLR registration lists 3,250 square feet for the HVAC replacement and space alterations.
How much will the work at 650 Cool Water Drive cost?
The applicant's estimated cost for the project is $1,026,000, according to the TDLR registration. This is an estimate, not a confirmed final cost.
What's being built near Bastrop Modular Vivarium and 401 Main Building Repurposing?
At 650 Cool Water Drive, a separate TDLR listing registered November 3, 2026, describes a seven-modular-building complex with an added vestibule, plus modifications to an existing building, site work, and parking changes. The August 18 registration covers HVAC replacement and alterations to the existing animal holding area.
Also being built nearby
All of 78602- 650 Cool Water Drive · Board Of Regents Of The University Of Texas SystemNov 3, 2026Bastrop modular vivarium and 401 main building repurposing — new construction — construction of a 7 modular building complex with added vestibule. modifications to existing building for mep scope, site work and parking modifications
- 589 Cool Water Dr · Bastrop County Animal ServicesSep 2, 2025Bastrop county animal services new kennel — new construction — pemb for animal kennels · 237 m away