5711 E Grand Parkway S

Baytown, TX 77523 · Niagara Bottling , LLC

Niagara Bottling building modifications in Baytown

Niagara Bottling registered modifications to an existing building at 5711 E Grand Parkway S on Dec. 17, 2024. The work includes water lines, slab demolition and reinforcement, new drains and structural provisions for equipment, and two additional restrooms. The TDLR registration lists 31,570 square feet and an applicant-estimated project cost of $4 million.

Summarized from Texas Department of Licensing and Regulation records · updated Dec 17, 2024

Projects
1
1 filings
Latest filing
Dec 17, 2024
since Dec 17, 2024
Largest scope
31,570 sf
Estimated cost
$4.0M
state registration

Where this project stands

Completed

Niagara BAY3&4

31,570 sq ft · $4.0M est.

  1. RegisteredDec 17, 2024
  2. Plan review
  3. ConstructionJan '25 – Apr '26
  4. Inspected
  5. Closed

Ran as a 15-month build.

4 contacts on this project · 3 phone numbers

Permit & project history

1 project
  1. Niagara BAY3&4

    Modifications to an existing building, new distilled for water lines , slab demolition and reinforced slabs, new drains for proposed equipment, structural provisions for conveyance and reinforced joists, and an addition of two restrooms. — niagara bottling , llc

    TDLR project registrationAdditions to Existing BuildingProject Closed31,570 sq ft$4.0M est.
    Tenant / owner
    Niagara Bay3&4
    Design firm
    Pro
    Contact
    Pro

Sources: Texas Department of Licensing and Regulation

Questions about 5711 E Grand Parkway S

What is being built at 5711 E Grand Parkway S in Baytown?

The TDLR registration describes modifications to an existing Niagara Bottling building, including water lines, slab work, equipment drains and two additional restrooms.

When was the Niagara Bottling project in Baytown registered?

The project registration was filed on Dec. 17, 2024.

Is this a new building or an addition to an existing building?

The registration describes modifications to an existing building and lists the project type as an addition to an existing building.

How large is the Niagara Bottling project at 5711 E Grand Parkway S?

The TDLR registration lists a project size of 31,570 square feet.

What is the estimated cost of the Niagara Bottling project in Baytown?

The applicant’s TDLR estimate for the project is $4 million.

What is being built near Baytown Area Water Authority?

At 5711 E Grand Parkway S, about 75 meters from the Baytown Area Water Authority, Niagara Bottling registered modifications to an existing building and an addition of two restrooms. The filing date was Dec. 17, 2024.