5711 E Grand Parkway S
Baytown, TX 77523 · Niagara Bottling , LLC
Niagara Bottling building modifications in Baytown
Niagara Bottling registered modifications to an existing building at 5711 E Grand Parkway S on Dec. 17, 2024. The work includes water lines, slab demolition and reinforcement, new drains and structural provisions for equipment, and two additional restrooms. The TDLR registration lists 31,570 square feet and an applicant-estimated project cost of $4 million.
Summarized from Texas Department of Licensing and Regulation records · updated Dec 17, 2024
- Projects
- 1
- 1 filings
- Latest filing
- Dec 17, 2024
- since Dec 17, 2024
- Largest scope
- 31,570 sf
- Estimated cost
- $4.0M
- state registration
Where this project stands
CompletedNiagara BAY3&4
31,570 sq ft · $4.0M est.
- RegisteredDec 17, 2024
- Plan review
- ConstructionJan '25 – Apr '26
- Inspected
- Closed
Ran as a 15-month build.
4 contacts on this project · 3 phone numbers
Permit & project history
1 projectModifications to an existing building, new distilled for water lines , slab demolition and reinforced slabs, new drains for proposed equipment, structural provisions for conveyance and reinforced joists, and an addition of two restrooms. — niagara bottling , llc
TDLR project registrationAdditions to Existing BuildingProject Closed31,570 sq ft$4.0M est.- Project #
- TABS2025007925
- Tenant / owner
- Niagara Bay3&4
- Design firm
- Pro
- Contact
- Pro
Sources: Texas Department of Licensing and Regulation
Questions about 5711 E Grand Parkway S
What is being built at 5711 E Grand Parkway S in Baytown?
The TDLR registration describes modifications to an existing Niagara Bottling building, including water lines, slab work, equipment drains and two additional restrooms.
When was the Niagara Bottling project in Baytown registered?
The project registration was filed on Dec. 17, 2024.
Is this a new building or an addition to an existing building?
The registration describes modifications to an existing building and lists the project type as an addition to an existing building.
How large is the Niagara Bottling project at 5711 E Grand Parkway S?
The TDLR registration lists a project size of 31,570 square feet.
What is the estimated cost of the Niagara Bottling project in Baytown?
The applicant’s TDLR estimate for the project is $4 million.
What is being built near Baytown Area Water Authority?
At 5711 E Grand Parkway S, about 75 meters from the Baytown Area Water Authority, Niagara Bottling registered modifications to an existing building and an addition of two restrooms. The filing date was Dec. 17, 2024.
Also being built nearby
All of 77523More demolitions in 77523.