groundranger
Active · latest filing Aug 2026Commercial

2045 Bedford Road

Bedford, TX 76021 · Fotp Bedford

Second-floor corridor and ramp planned at 2045 Bedford Road

A 485-square-foot second-floor connecting corridor and ramp are planned between two existing wings at 2045 Bedford Road. A Texas Department of Licensing and Regulation project registration was filed August 27, 2026, and is marked “Review Complete.” The applicant’s estimated project cost is $380,000.

Summarized from Texas Department of Licensing and Regulation records · updated Aug 27, 2026

Projects
1
1 filings
Latest filing
Aug 27, 2026
since Aug 27, 2026
Largest scope
485 sf
Estimated cost
$380K
state registration

Where this project stands

Under construction

FORP Bedford Connecting Corridor

485 sq ft · $380K est.

  1. RegisteredAug 27, 2026
  2. Plan review
  3. ConstructionOct '26 – Mar '27
  4. Inspected
  5. Closed
32% through of a 5-month buildOct 1, 2026 → Mar 1, 2027

4 contacts on this project · 3 phone numbers

Permit & project history

1 project
  1. Addition of a second floor connecting corridor and ramp between two existing wings. — fotp bedford

    TDLR project registrationAdditions to Existing BuildingReview Complete485 sq ft$380K est.
    Tenant / owner
    Forp Bedford Connecting Corridor
    Design firm
    Pro
    Contact
    Pro

Sources: Texas Department of Licensing and Regulation

Questions about 2045 Bedford Road

What is being built at 2045 Bedford Road?

A second-floor connecting corridor and ramp between two existing wings are planned, according to TDLR registration TABS2026028958, filed August 27, 2026.

What is the project at 2045 Bedford Road in Bedford?

The registration describes a 485-square-foot addition of a second-floor corridor and ramp connecting two existing wings. Its status is “Review Complete.”

When was the 2045 Bedford Road project filed?

The TDLR project registration was filed August 27, 2026.

How much will the 2045 Bedford Road project cost?

The applicant’s estimated cost is $380,000. This is an estimate for the project, not a reported final cost.

What is being built next to the Fotp Bedford Elevator Addition and Youth Classroom Renovation?

At the same address, 2045 Bedford Road, a TDLR registration describes an addition of a second-floor corridor and ramp between two existing wings. The registration was filed August 27, 2026.

Is construction planned near QuikTrip at 2201 Central Drive?

A separate project at 2045 Bedford Road, about 425 meters from the QuikTrip site, is registered for a second-floor connecting corridor and ramp. Its TDLR filing date is August 27, 2026.

Also being built nearby

All of 76021
Email me when it passes inspection