Recent · latest filing Sep 2025Residential

2200 Cades Spirit Bnd

Bee Cave, TX 78733

2200 Cades Spirit Bnd: 1 project on record

City of Austin lists 1 filing across 1 project at 2200 Cades Spirit Bnd, Bee Cave, TX 78733. The most recent, filed September 19, 2025, covers: “Level 2 ev charger powered by a 60amp circuit breaker. run #6 thhn c.u. & #10 thhn c.u. ground through <5 feet new 3/4 emt conduit to power the level 2 ev charger at 48amp constant draw”.

Compiled from City of Austin records · updated Sep 19, 2025

Projects
1
1 filings
Latest filing
Sep 19, 2025
since Sep 19, 2025
Largest scope
—
Listed value
—

Where this project stands

Finaled

Level 2 ev charger powered by a 60amp circuit breaker. run #6 thhn c.u. & #10 thhn c.u. ground through <5 feet new 3/4 emt conduit to power the level 2 ev charger at 48amp constant draw

  1. AppliedSep 18, 2025
  2. IssuedSep 19, 2025
  3. WorkSep '25 – Oct '25
  4. Final inspectionOct 7, 2025

Passed final inspection Oct 7, 2025.

1 contact on this project · 1 phone number

Permit & project history

1 project
  1. Level 2 ev charger powered by a 60amp circuit breaker. run #6 thhn c.u. & #10 thhn c.u. ground through <5 feet new 3/4 emt conduit to power the level 2 ev charger at 48amp constant draw

    Level 2 ev charger powered by a 60amp circuit breaker. run #6 thhn c.u. & #10 thhn c.u. ground through <5 feet new 3/4 emt conduit to power the level 2 ev charger at 48amp constant draw

    City of Austin permitElectrical PermitFinal
    Owner
    Pro
    Contractor
    Pro
    Contact
    Pro

Sources: City of Austin

Questions about 2200 Cades Spirit Bnd

What is being built at 2200 Cades Spirit Bnd?

The latest filing (City of Austin permit 2025-119233 EP, September 19, 2025) covers level 2 ev charger powered by a 60amp circuit breaker. run #6 thhn c.u. & #10 thhn c.u. ground through <5 feet new 3/4 emt conduit to power the level 2 ev charger at 48amp constant draw.

How many permits and filings does 2200 Cades Spirit Bnd have?

1 filing across 1 project, from September 19, 2025 to September 19, 2025.

What is being built near 2508 Ashley Worth in Bee Cave?

2200 Cades Spirit Bnd is about 423 m from 2508 Ashley Worth (2508 Ashley Worth Blvd). Its latest filing is for level 2 ev charger powered by a 60amp circuit breaker. run #6 thhn c.u. & #10 thhn c.u. ground through <5 feet new 3/4 emt conduit to power the level 2 ev charger at 48amp constant draw.

Is there other construction near 2200 Cades Spirit Bnd?

Yes. Nearby filings include 2308 Chloes Bloom Bnd (emergency ae pulled the meter replacing meter, Jul 11, 2025); 11533 Lake Stone Dr (roof mount solar installation, Jul 30, 2025); 11500 Emerald Falls Dr (disconnect/reconnect power to tie in pv component and upgrading msp to 225 amps. upgrading revenue meter to 200 amps, Aug 26, 2024).

How do I get alerts for new permits at 2200 Cades Spirit Bnd?

Watch this address on groundranger and you'll get an email when a new permit or project filing appears here or nearby.

Also being built nearby

All of 78733
Email me when a new permit is filed