13504 Couri Pass
Bee Cave, TX 78738
13504 Couri Pass: 1 project on record
City of Austin lists 1 filing across 1 project at 13504 Couri Pass, Bee Cave, TX 78738. The most recent, filed March 7, 2024, covers: “Transfer switch and generator install. need temp disconnect from austin energy and service only inspection”.
Compiled from City of Austin records · updated Mar 7, 2024
- Projects
- 1
- 1 filings
- Latest filing
- Mar 7, 2024
- since Mar 7, 2024
- Largest scope
- —
- Listed value
- —
Where this project stands
FinaledTransfer switch and generator install. need temp disconnect from austin energy and service only inspection
- AppliedMar 5, 2024
- IssuedMar 7, 2024
- WorkMar '24 – Mar '24
- Final inspectionMar 18, 2024
Passed final inspection Mar 18, 2024.
1 contact on this project · 1 phone number
Permit & project history
1 projectTransfer switch and generator install. need temp disconnect from austin energy and service only inspection
Transfer switch and generator install. need temp disconnect from austin energy and service only inspection
City of Austin permitElectrical PermitFinal- Record
- 2024-027223 EP
- Owner
- Pro
- Contractor
- Pro
- Contact
- Pro
Sources: City of Austin
Questions about 13504 Couri Pass
What is being built at 13504 Couri Pass?
The latest filing (City of Austin permit 2024-027223 EP, March 7, 2024) covers transfer switch and generator install. need temp disconnect from austin energy and service only inspection.
How many permits and filings does 13504 Couri Pass have?
1 filing across 1 project, from March 7, 2024 to March 7, 2024.
Is there other construction near 13504 Couri Pass?
Yes. Nearby filings include 5601 Stage Stop Cir (request to disconnect - installing new service rated generac transfer switch and generator. this will require disconnecting and reconnecting power. the transfer switch will be placed between the meter and existing house panel. 200 amp service with 200 amp ats full oh service: meter riser and panel, Apr 10, 2025); 13404 Byrds Nest Dr (replace 200 amp meter can and mast for overhead service, May 6, 2024); 13412 Saddle Back Pass (whole home electrical upgrade including electrical panel replacement, Aug 6, 2024).
How do I get alerts for new permits at 13504 Couri Pass?
Watch this address on groundranger and you'll get an email when a new permit or project filing appears here or nearby.
Also being built nearby
All of 78738- 5601 Stage Stop CirApr 10, 2025Request to disconnect - installing new service rated generac transfer switch and generator. this will require disconnecting and reconnecting power. the transfer switch will be placed between the meter and existing house panel. 200 amp service with 200 amp ats full oh service: meter riser and panel · 187 m away
- 13404 Byrds Nest DrMay 6, 2024Replace 200 amp meter can and mast for overhead service · 237 m away
- 13412 Saddle Back PassAug 6, 2024Whole home electrical upgrade including electrical panel replacement · 413 m away
- 13935 Lone Rider TrlJan 2, 2024New service sfr etj 6140 sq ft · 598 m away