15813 Grumbles Ln
Bee Cave, TX 78738
Rooftop solar, energy storage and generator permitted
Permits indicate rooftop solar and an energy storage system were installed at this existing residence in Bee Cave. The solar and storage permit was filed September 15, 2025; a separate permit filed April 3, 2026, covers a 28 kW standby generator and connections to energy storage components.
Summarized from City of Austin records · updated Apr 3, 2026
- Projects
- 3
- 3 filings
- Latest filing
- Apr 3, 2026
- since Sep 10, 2025
- Largest scope
- —
- Listed value
- —
Where this project stands
FinaledDisconnect/reconnect to tie in ess components. we are not upgrading the size of the service not upgrading the meter size. install generac 28 kw air-cooled standby generator (model #g007282-0)
- AppliedApr 2, 2026
- IssuedApr 3, 2026
- WorkApr '26 – Jul '26
- Final inspectionJul 1, 2026
Passed final inspection Jul 1, 2026.
1 contact on this project · 1 phone number
Permit & project history
3 projectsDisconnect/reconnect to tie in ess components. we are not upgrading the size of the service not upgrading the meter size. install generac 28 kw air-cooled standby generator (model #g007282-0)
Disconnect/reconnect to tie in ess components. we are not upgrading the size of the service not upgrading the meter size. install generac 28 kw air-cooled standby generator (model #g007282-0)
City of Austin permitElectrical PermitFinal- Record
- 2026-039810 EP
- Owner
- Pro
- Contractor
- Pro
- Contact
- Pro
Install new 22.100 kw rooftop solar system and 27kw energy storage system for existing residential only
Install new 22.100 kw rooftop solar system and 27kw energy storage system for existing residential only
City of Austin permitElectrical PermitFinal- Record
- 2025-113263 EP
- Owner
- Pro
- Contractor
- Pro
- Contact
- Pro
Disconnect/reconnect to tie in pv/ess components. we are not upgrading the size of the service not upgrading the meter size
Disconnect/reconnect to tie in pv/ess components. we are not upgrading the size of the service not upgrading the meter size
City of Austin permitElectrical PermitFinal- Record
- 2025-113275 EP
- Owner
- Pro
- Contractor
- Pro
- Contact
- Pro
Sources: City of Austin
Questions about 15813 Grumbles Ln
What is being built at 15813 Grumbles Ln?
Permits indicate rooftop solar, an energy storage system and a standby generator are being installed at the existing residence.
Is a new house being built at 15813 Grumbles Ln?
The records describe work at an existing residence, including solar, energy storage and generator installation; they do not indicate a new house.
When was the solar system permitted at 15813 Grumbles Ln?
The solar and energy storage permit, 2025-113263 EP, was filed September 15, 2025. It describes a 22.1 kW rooftop solar system and a 27 kW energy storage system.
Is a generator being installed at 15813 Grumbles Ln?
Yes. Permit 2026-039810 EP, filed April 3, 2026, describes installation of a 28 kW air-cooled standby generator.
What does permit 2026-039810 EP cover?
Filed April 3, 2026, the permit describes connecting energy storage components and installing a 28 kW standby generator. It also says the service and meter sizes are not being upgraded.
Are the permits for solar and energy storage final?
The City of Austin records list permits 2025-113263 EP and 2025-113275 EP as final. They were filed September 15 and September 10, 2025, respectively.