6802 Mapleridge
Bellaire, TX 77401 · Bdg Interior Remodel, Bellaire Triangle Building Exterior Renovation
Office interior remodel at 6802 Mapleridge
An existing office at 6802 Mapleridge is being remodeled, with an approximately 300-square-foot expansion and changes to interior walls and the breakroom. The TDLR project registration was filed November 13, 2025, and lists the project at 4,423 square feet with an estimated cost of $100,000.
Summarized from Texas Department of Licensing and Regulation records · updated Nov 13, 2025
- Projects
- 2
- 2 filings
- Latest filing
- Nov 13, 2025
- since Sep 26, 2024
- Largest scope
- 4,423 sf
- Estimated cost
- $1.2M
- state registration
Where this project stands
Inspected · closing outBDG Interior Remodel
4,423 sq ft · $100K est.
- RegisteredNov 13, 2025
- Plan review
- ConstructionJan '26 – Jan '26
- Inspected
- Closednow
The building is substantially done. Move-in, fit-out and service work usually follow.
4 contacts on this project · 3 phone numbers
Permit & project history
2 projectsThis project is an interior remodel of an existing office space including expanding the space by approximately 300 square feet, minor interior modifications to non-loadbearing walls throughout and a remodel and expansion of an existing breakroom. — bellaire triangle building
TDLR project registrationRenovation/AlterationInspection Complete4,423 sq ft$100K est.- Project #
- TABS2026005814
- Tenant / owner
- Bdg Interior Remodel
- Design firm
- Pro
- Contact
- Pro
Add 3 patios and renovate the exterior of a 2-story building — bellaire triangle building
TDLR project registrationRenovation/AlterationInspection Complete1,000 sq ft$1.2M est.- Project #
- TABS2025001929
- Tenant / owner
- Bellaire Triangle Building Exterior Renovation
- Design firm
- Pro
- Contact
- Pro
Sources: Texas Department of Licensing and Regulation
Questions about 6802 Mapleridge
What is being built at 6802 Mapleridge in Bellaire?
The project is an interior remodel of an existing office, including an approximately 300-square-foot expansion, minor changes to non-load-bearing walls and an expanded breakroom.
When was the office remodel at 6802 Mapleridge permitted?
The TDLR project registration, TABS2026005814, was filed November 13, 2025.
How large is the 6802 Mapleridge office project?
The TDLR registration lists a project size of 4,423 square feet and describes an approximately 300-square-foot expansion of the existing office.
How much will the 6802 Mapleridge remodel cost?
The TDLR registration lists an estimated project cost of $100,000.
What is being remodeled near Cosmic Ice Cream in Bellaire?
An existing office at 6802 Mapleridge, about 57 meters from Cosmic Ice Cream, is undergoing an interior remodel and expansion. The TDLR registration was filed November 13, 2025.
What construction is happening near Bellaire Hardware Store on Bissonnet?
The project at 6802 Mapleridge is an interior remodel of an existing office, including a breakroom expansion and minor interior wall changes. The site is about 74 meters from Bellaire Hardware Store.
Also being built nearby
All of 77401- 5400 Bissonnet Street · Fkm Partnership LtdJan 13, 2026Cosmic ice cream — new construction — remodel existing lease space to be a new ice cream shop · 57 m away
- 5401 Bellaire Blvd · Luel Partnership, Ltd.Feb 7, 2025Cava bellaire — renovation/alteration — tenant improvement for a fast-casual restaurant use in an existing core and shell building. work includes new kitchen equipment, restrooms, and interiors, including mechanical, plumbing and electrical work · 67 m away
- 5307 Bissonnet · Mvm Capital Partners, LLCMay 28, 2024Shul of bellaire expansion — renovation/alteration — addition to existing synagogue with two classrooms and restrooms · 68 m away
- 5413 Bellaire Blvd · Fkm Partnership LtdJun 4, 2025Mias bellaire — renovation/alteration — project consists of a renovation of an existing space from a brewery to a restaurant in a shopping center · 68 m away
- 5423 Bellaire Blvd · Fkm Partnership LtdMar 27, 2025Dr. brett — new construction — new construction for dental office · 69 m away
- 5427 Bellaire Blvd · Bellaire TriangleMar 14, 2025Mhmg - primary care - bellaire triangle — renovation/alteration — remodel of an existing tenant lease space within a medical office building for a primary care clinic · 69 m away
- 5424 Bissonnet · Bellaire Triangle CenterJul 19, 2024Pauls wine pix — renovation/alteration — interior remodel · 71 m away
- 5430 Bissonnet St · Bellaire TriangleAug 26, 2026Bellaire hardware store — renovation/alteration — renovation of existing retail store into retail hardware store, within existing freestanding building · 74 m away
- 5410 Bellaire Blvd · Tagaropulos Family Partnership LtdApr 30, 2025Bellaire sewing shop — renovation/alteration — renovate interior space to accommodate sewing shop · 115 m away
- 5301 Bellaire Blvd · Allstate Bk Real Estate Holdings LtdApr 15, 2025Burger king - houston bellaire #1053 — renovation/alteration — the existing 2500 sq ft building to be remodeled with new burger king sizzle standards · 174 m away
- 5427 Bissonnet StAug 29, 20191,950 sq ft built-out (dermatology) 100% · 196 m away
- 5212 Bellaire Blvd · Bellaire Bissonnet, LtdJul 15, 2026Switchyards — renovation/alteration — interior remodel for switchyards · 240 m away
More offices in 77401.