300 Herff Blvd
Boerne, TX 78006 · Boerne ISD
Cibolo Creek Elementary playground surfacing project
A playground renovation at Cibolo Creek Elementary includes removing existing wood-fiber surfacing and installing rubberized surfaces and associated drainage. The project was registered with TDLR on March 27, 2024; the applicant estimated its cost at $258,805, and the record lists the project as closed.
Summarized from Texas Department of Licensing and Regulation records · updated Mar 27, 2024
- Projects
- 1
- 1 filings
- Latest filing
- Mar 27, 2024
- since Mar 27, 2024
- Largest scope
- 14,458 sf
- Estimated cost
- $259K
- state registration
Where this project stands
CompletedPlayground Rubberized Surfacing at Cibolo Creek ES
14,458 sq ft · $259K est.
- RegisteredMar 27, 2024
- Plan review
- ConstructionMay '24 – Aug '24
- Inspected
- Closed
Ran as a 3-month build.
4 contacts on this project · 3 phone numbers
Permit & project history
1 projectDemolition of existing wood fiber section at upper and lower level playgrounds, new rubberized surface section and associated drainage. — cibolo creek es
TDLR project registrationRenovation/AlterationProject Closed14,458 sq ft$259K est.- Project #
- TABS2024014750
- Tenant / owner
- Playground Rubberized Surfacing At Cibolo Creek Es
- Design firm
- Pro
- Contact
- Pro
Sources: Texas Department of Licensing and Regulation
Questions about 300 Herff Blvd
What is being built at 300 Herff Blvd in Boerne?
The project replaces wood-fiber sections at the upper and lower playgrounds at Cibolo Creek Elementary with rubberized surfacing and associated drainage. TDLR registration TABS2024014750 was filed March 27, 2024.
Is a new school being built at 300 Herff Blvd?
The TDLR record describes a playground renovation, not a new school building. It includes demolition of existing surfacing and installation of rubberized surfaces and drainage.
When was the Cibolo Creek Elementary playground project registered?
The project was registered with TDLR on March 27, 2024. Its record, TABS2024014750, lists the project status as closed.
How much is the Cibolo Creek Elementary playground project expected to cost?
The applicant estimated the project cost at $258,805 in the TDLR registration. This is an estimate for the project, not a confirmed final cost.
What construction is happening near Boerne ISD at 300 Herff Blvd?
The project record for Cibolo Creek Elementary describes replacing wood-fiber playground sections with rubberized surfacing and adding associated drainage. It was registered March 27, 2024.
Also being built nearby
All of 78006- 109 Yoalana St · Studio S Architects OfficeJul 26, 2024Studio s architects new office - finish out — renovation/alteration — this project is a tenant finish out no change to the shell no addition to the building footprint nor alterations to public infrastructure are propose · 245 m away
- 437 S. Main Street · M-S-M Holdings Inc.Apr 1, 2024Addition to hamby's of boerne — additions to existing building — addition of storage space and one bathroom to rear of existing single story wood framed building · 468 m away
- 235 Johns Rd · Boerne ISDNov 14, 2024Central office academy improvements — renovation/alteration — dividing an open area into 2 offices with gyp walls & new doors. dividing 2 larger classrooms into multiple (one into 2 & one into 3) with accordion walls & one new door. rearranging mechanical & electrical equipment in ceilings · 552 m away
- 265 N. Main Street · Hill & Bach Cellars, LLCApr 4, 2025Hill & bach cellars - interior remodel / addition — renovation/alteration — interior renovation / addition to existing structure(s) · 557 m away
- 240 Johns Road · Boerne ISDApr 15, 2024Boerne middle school north renovation & addition — renovation/alteration — 8000 sq ft classroom building addition and 2000 sq ft interior remodel into lobby space. includes sitework, site utilities, landscaping, fencing, and signage · 560 m away
- 206 Saunders St · Farber Property Holdings, LLCMay 11, 2026Home instead interior refresh — renovation/alteration — ada/tas-compliant renovation of men’s and women’s restrooms, new breakroom, interior finishes, plumbing/electrical updates, exhaust fans, and limited hvac grille relocation · 570 m away
More demolitions in 78006.