groundranger
Historic · latest filing Mar 2024Commercial

300 Herff Blvd

Boerne, TX 78006 · Boerne ISD

Cibolo Creek Elementary playground surfacing project

A playground renovation at Cibolo Creek Elementary includes removing existing wood-fiber surfacing and installing rubberized surfaces and associated drainage. The project was registered with TDLR on March 27, 2024; the applicant estimated its cost at $258,805, and the record lists the project as closed.

Summarized from Texas Department of Licensing and Regulation records · updated Mar 27, 2024

Projects
1
1 filings
Latest filing
Mar 27, 2024
since Mar 27, 2024
Largest scope
14,458 sf
Estimated cost
$259K
state registration

Where this project stands

Completed

Playground Rubberized Surfacing at Cibolo Creek ES

14,458 sq ft · $259K est.

  1. RegisteredMar 27, 2024
  2. Plan review
  3. ConstructionMay '24 – Aug '24
  4. Inspected
  5. Closed

Ran as a 3-month build.

4 contacts on this project · 3 phone numbers

Permit & project history

1 project
  1. Demolition of existing wood fiber section at upper and lower level playgrounds, new rubberized surface section and associated drainage. — cibolo creek es

    TDLR project registrationRenovation/AlterationProject Closed14,458 sq ft$259K est.
    Tenant / owner
    Playground Rubberized Surfacing At Cibolo Creek Es
    Design firm
    Pro
    Contact
    Pro

Sources: Texas Department of Licensing and Regulation

Questions about 300 Herff Blvd

What is being built at 300 Herff Blvd in Boerne?

The project replaces wood-fiber sections at the upper and lower playgrounds at Cibolo Creek Elementary with rubberized surfacing and associated drainage. TDLR registration TABS2024014750 was filed March 27, 2024.

Is a new school being built at 300 Herff Blvd?

The TDLR record describes a playground renovation, not a new school building. It includes demolition of existing surfacing and installation of rubberized surfaces and drainage.

When was the Cibolo Creek Elementary playground project registered?

The project was registered with TDLR on March 27, 2024. Its record, TABS2024014750, lists the project status as closed.

How much is the Cibolo Creek Elementary playground project expected to cost?

The applicant estimated the project cost at $258,805 in the TDLR registration. This is an estimate for the project, not a confirmed final cost.

What construction is happening near Boerne ISD at 300 Herff Blvd?

The project record for Cibolo Creek Elementary describes replacing wood-fiber playground sections with rubberized surfacing and adding associated drainage. It was registered March 27, 2024.

Also being built nearby

All of 78006

More demolitions in 78006.

Get alerts for 300 Herff Blvd