Fabra Elementary playgrounds to get rubberized surfacing

A project at Fabra Elementary School calls for replacing wood fiber sections at the upper and lower playgrounds with rubberized surfacing and adding associated drainage. The TDLR project registration was filed March 27, 2024; it lists an estimated project cost of $320,618 and a status of closed.

Summarized from Texas Department of Licensing and Regulation records · updated Mar 27, 2024

Projects
1
1 filings
Latest filing
Mar 27, 2024
since Mar 27, 2024
Largest scope
17,900 sf
Estimated cost
$321K
state registration

Where this project stands

Completed

Playground Rubberized Surfacing at Fabra ES

17,900 sq ft · $321K est.

  1. RegisteredMar 27, 2024
  2. Plan review
  3. ConstructionMay '24 – Aug '24
  4. Inspected
  5. Closed

Ran as a 3-month build.

4 contacts on this project · 3 phone numbers

Permit & project history

1 project
  1. Demolition of existing wood fiber section at upper and lower level playgrounds, new rubberized surface section and associated drainage. — fabra elementary school

    TDLR project registrationRenovation/AlterationProject Closed17,900 sq ft$321K est.
    Tenant / owner
    Playground Rubberized Surfacing At Fabra Es
    Design firm
    Pro
    Contact
    Pro

Sources: Texas Department of Licensing and Regulation

Questions about 723 Johns Road

What is being built at 723 Johns Road in Boerne?

The project covers rubberized surfacing at Fabra Elementary School’s upper and lower playgrounds, along with associated drainage. It includes demolition of the existing wood fiber sections.

When was the Fabra Elementary playground project filed?

The TDLR project registration was filed March 27, 2024. The registration number is TABS2024014757.

How much will the Fabra Elementary playground work cost?

The applicant’s TDLR estimate for the project is $320,618. This is an estimate, not a reported final project cost.

How large is the Fabra Elementary playground project?

The TDLR registration lists a project area of 17,900 square feet.

Is the Fabra Elementary playground project still underway?

The TDLR registration lists the project status as closed.

What work is planned at Fabra Elementary besides playground surfacing?

A separate TDLR filing dated August 21, 2026, describes reconstruction of the existing Fabra walking track, including site work and general construction.