2033 S Bridge St
Brady, TX 76825 · Cj Real State, LLC
2,436-square-foot Starbucks renovation in Brady
A 2,436-square-foot renovation of an existing Starbucks is planned at 2033 S Bridge St in Brady. The project registration was filed with TDLR on June 5, 2025, and describes minor wall framing, casework, finishes, and mechanical, electrical, and plumbing work. The applicant estimated the project cost at $250,000.
Summarized from Texas Department of Licensing and Regulation records · updated Jun 5, 2025
- Projects
- 1
- 1 filings
- Latest filing
- Jun 5, 2025
- since Jun 5, 2025
- Largest scope
- 2,436 sf
- Estimated cost
- $250K
- state registration
Where this project stands
Finishing up · inspection nextHwy 87 & Blackburn
2,436 sq ft · $250K est.
- RegisteredJun 5, 2025
- Plan review
- ConstructionDec '25 – Mar '26
- Inspectednow
- Closed
Scheduled to finish Mar 2, 2026; the state inspection hasn't been filed yet.
4 contacts on this project · 4 phone numbers
Permit & project history
1 projectReno of an existing starbucks including minor wall framing, casework, finishes & mep work 2,436sf — starbucks
TDLR project registrationRenovation/AlterationReview Complete2,436 sq ft$250K est.- Project #
- TABS2025020631
- Tenant / owner
- Hwy 87 & Blackburn
- Design firm
- Pro
- Contact
- Pro
Sources: Texas Department of Licensing and Regulation
Questions about 2033 S Bridge St
What is being built at 2033 S Bridge St in Brady?
The TDLR registration describes renovations to an existing Starbucks, including minor wall framing, casework, finishes, and mechanical, electrical, and plumbing work. The work covers 2,436 square feet.
Is a new Starbucks opening at 2033 S Bridge St?
The registration describes renovation of an existing Starbucks, not a new location. It was filed June 5, 2025.
When was the Starbucks renovation in Brady filed?
The project registration was filed with TDLR on June 5, 2025. Its registration number is TABS2025020631.
How much will the Starbucks renovation in Brady cost?
The applicant estimated the project cost at $250,000. This is an estimate for the project, not a reported final cost.
What's being renovated near Frontera Healthcare Network on S Bridge Street?
A 2,436-square-foot renovation of an existing Starbucks is registered at 2033 S Bridge St, about 243 meters from Frontera Healthcare Network. The filing date was June 5, 2025.
What work is planned at the Starbucks on S Bridge Street in Brady?
The TDLR description lists minor wall framing, casework, finishes, and mechanical, electrical, and plumbing work. The project is classified as a renovation or alteration.
Also being built nearby
All of 76825- 2026 S. Bridge Street · Frontera Healthcare NetworkJan 22, 20252322 frontera brady — additions to existing building — 1818 sq ft wood frame expansion to 1837 sq ft clinic. existing clinic finishes to be updated both interior and interior · 243 m away
- 2207 S Bridge St · Walmart Real Estate Business TrustOct 15, 2024Walmart 917 remodel — renovation/alteration — walmart 917 remodel vision center, restroom remodel, relocate fitting rooms; paint pharmacy; remodel online grocery pickup area with new walk in freezer/cooler; clean/paint interior walls; remodel customer service; remodel money center; rep · 543 m away