2602 Longwood Dr
Brenham, TX 77833 · Cgg Services (u.s.) Inc.
40,262-square-foot data center planned in Brenham
A 40,262-square-foot data center with accessory workspaces is planned at 2602 Longwood Dr in Brenham. The project was registered with TDLR on December 10, 2025; the applicant’s estimated project cost is $50 million.
Summarized from Texas Department of Licensing and Regulation records · updated Dec 10, 2025
- Projects
- 1
- 1 filings
- Latest filing
- Dec 10, 2025
- since Dec 10, 2025
- Largest scope
- 40,262 sf
- Estimated cost
- $50M
- state registration
Where this project stands
Approved · construction starts Jan 1, 2027Viridien US HPC Hub
40,262 sq ft · $50M est.
- RegisteredDec 10, 2025
- Plan review
- ConstructionJan '27 – Oct '27
- Inspected
- Closed
A 9-month build is scheduled. Bids for subcontractors and suppliers usually close before the start date.
4 contacts on this project · 3 phone numbers
Permit & project history
1 projectNew construction to include a 40,262 square foot data center building with accessory work spaces, including data equipment storage, data equipment assembly and facility workshops, mechanical equipment, and ups battery back-up. the data center will be — us hpc hub
TDLR project registrationNew ConstructionReview Complete40,262 sq ft$50M est.- Project #
- TABS2026007651
- Tenant / owner
- Viridien US Hpc Hub
- Design firm
- Pro
- Contact
- Pro
Sources: Texas Department of Licensing and Regulation
Questions about 2602 Longwood Dr
What is being built at 2602 Longwood Dr in Brenham?
A 40,262-square-foot data center, registered as the Viridien US HPC Hub, is planned for the address. The project description also lists data equipment storage and assembly, facility workshops, mechanical equipment, and UPS battery backup.
When was the Brenham data center project registered?
The TDLR registration was filed December 10, 2025. Its project number is TABS2026007651, and its status is listed as Review Complete.
How large will the Viridien US HPC Hub be?
The TDLR project registration describes a 40,262-square-foot data center building with accessory workspaces.
How much will the data center in Brenham cost?
The applicant’s estimated cost for the project is $50 million, according to the TDLR registration.
What will be inside the data center at 2602 Longwood Dr?
The project description lists data equipment storage and assembly, facility workshops, mechanical equipment, and UPS battery backup alongside the data center.