902 College Ave
Brenham, TX 77833 · Blinn College Sports Complex, Blinn College - Central Plant Upgrades (brenham, Tx)
Blinn College sports fieldhouse and competition fields planned
A new Blinn College sports complex is planned at 902 College Ave, including a 28,555-square-foot fieldhouse, two competition fields with grandstands and press boxes, an intramural field, and paving. The TDLR project registration was filed September 23, 2026, and is marked Review Complete. The applicant’s estimated project cost is $38,963,861.
Summarized from Texas Department of Licensing and Regulation records · updated Sep 23, 2026
- Projects
- 2
- 2 filings
- Latest filing
- Sep 23, 2026
- since Feb 18, 2025
- Largest scope
- 28,555 sf
- Estimated cost
- $39M
- state registration
Where this project stands
Approved · construction starts Nov 20, 2026Blinn College Sports Complex
28,555 sq ft · $39M est.
- RegisteredSep 23, 2026
- Plan review
- ConstructionNov '26 – May '28
- Inspected
- Closed
A 18-month build is scheduled. Bids for subcontractors and suppliers usually close before the start date.
4 contacts on this project · 3 phone numbers
Permit & project history
2 projectsNew sports fieldhouse (28,555sf) with 2 competition fields with grand stands & press boxes (soccer & softball), and 1 intramural field; and associated paving. — blinn college sports complex
TDLR project registrationNew ConstructionReview Complete28,555 sq ft$39M est.- Project #
- TABS2027001733
- Tenant / owner
- Blinn College Sports Complex
- Design firm
- Pro
- Contact
- Pro
Central plant upgrade: includes replacing chillers, adding new chillers, pumps, a cooling tower, electrical switchgear, and related civil and structural upgrades. a new architectural screen wall will enclose the new cooling tower. — blinn college - bob bullock building (central plant)
TDLR project registrationRenovation/AlterationInspection Complete6,040 sq ft$6.2M est.- Project #
- TABS2025012158
- Tenant / owner
- Blinn College - Central Plant Upgrades (brenham, Tx)
- Design firm
- Pro
- Contact
- Pro
Sources: Texas Department of Licensing and Regulation
Questions about 902 College Ave
What is being built at 902 College Ave in Brenham?
The TDLR registration describes a new Blinn College sports complex with a 28,555-square-foot fieldhouse, two competition fields with grandstands and press boxes, an intramural field, and associated paving.
When was the Blinn College sports complex filed?
The project registration was filed with TDLR on September 23, 2026. It is listed as Review Complete.
What sports will the new fields be for?
The registration identifies the two competition fields as soccer and softball fields. It also includes one intramural field.
How large will the Blinn College fieldhouse be?
The planned fieldhouse is listed as 28,555 square feet in TDLR registration TABS2027001733.
How much is the Blinn College sports complex estimated to cost?
The applicant’s TDLR estimate for the project is $38,963,861. This is an estimate, not a reported final cost.
What is happening near Wheeler Hall South Wing in Brenham?
The TDLR record at 902 College Ave describes a new Blinn College sports complex with a fieldhouse, competition fields, an intramural field, and paving.
Also being built nearby
All of 77833- 804 W. Third Street 902 College Avenue · Blinn Jr CollegeApr 28, 2026Blinn wheeler hall south wing flooring replacement — renovation/alteration — this scope of work includes removal of existing flooring and base, preparation of substrates and installation of new flooring with rubber base
- 700 Blinn Blvd · Blinn CollegeFeb 25, 2024Renovations for blinn academic building — renovation/alteration — renovation for the finishes and the exterior canopy · 344 m away