groundranger
Active · latest filing Sep 2026Commercial

100 E. Alton Gloor Blvd

Brownsville, TX 78526 · Hca Vrmc C-Section O.r. Expansion, Make Up Air Unit Replacements + 5 more

Hospital operating-room expansion and upgrades in Brownsville

At this multi-tenant commercial site, TDLR filings describe an approximately 1,990-square-foot expansion of Valley Regional Medical Center’s operating-room suite, including two C-section operating rooms and a storage room. The expansion was registered September 9, 2026; registrations dated November 24 and December 10, 2025, also list power-system and make-up-air-unit upgrades.

Summarized from Texas Department of Licensing and Regulation records · updated Sep 9, 2026

Projects
7
7 filings
Latest filing
Sep 9, 2026
since Aug 21, 2024
Largest scope
22,000 sf
Estimated cost
$2.7M
state registration

Where this project stands

In state plan review

HCA VRMC C-Section O.R. Expansion

1,990 sq ft · $1.6M est.

  1. RegisteredSep 9, 2026
  2. Plan reviewnow
  3. ConstructionSep '26 – Jun '27
  4. Inspected
  5. Closed

Design is filed with the state. Subcontractors and suppliers are usually picked around now.

4 contacts on this project · 3 phone numbers

Permit & project history

7 projects
  1. Adding approx. 1,990 sq ft to an existing hospital. two c-section ors and a storage room will be added to the existing or suite — valley regional medical center

    TDLR project registrationAdditions to Existing BuildingProject Registered1,990 sq ft$1.6M est.
    Tenant / owner
    Hca Vrmc C-Section O.r. Expansion
    Design firm
    Pro
    Contact
    Pro
  2. Replace two make up air units — valley regional medical center

    TDLR project registrationRenovation/AlterationProject Registered400 sq ft$760K est.
    Tenant / owner
    Make Up Air Unit Replacements
    Design firm
    Pro
    Contact
    Pro
  3. New epss generators and replacement of normal and emergency distribution. — valley regional medical center

    TDLR project registrationRenovation/AlterationReview Complete100 sq ft$2.7M est.
    Tenant / owner
    Normal Power And Epss Upgrade
    Design firm
    Pro
    Contact
    Pro
  4. Chiller and pump replacement — valley regional medical center

    TDLR project registrationRenovation/AlterationReview Complete22,000 sq ft$1.0M est.
    Tenant / owner
    Hca Valley Regional Chiller Replacement
    Design firm
    Pro
    Contact
    Pro
  5. 2024-021 VRMC CT Scan

    550 sq ft renovation of a waiting room into a ct scan exam and control room at valley regional medical center — valley regional medical center

    TDLR project registrationRenovation/AlterationReview Complete550 sq ft$300K est.
    Tenant / owner
    2024-021 Vrmc Ct Scan
    Design firm
    Pro
    Contact
    Pro
  6. 2000 sq ft new office finish out in an existing 3 story building structure. consisting of construction of a new outpatient behavioral health clinic with consultation rooms, break rooms, waiting areas, and receptions. — mob finish out at vrmc-op behavioral health clinic

    TDLR project registrationRenovation/AlterationReview Complete2,000 sq ft$2.0M est.
    Tenant / owner
    2024-011 Mob Finish Out At Vrmc-Op Behavioral Health Clinic
    Design firm
    Pro
    Contact
    Pro
  7. 3300 sq ft new office finish out in an existing 3 story building structure. consisting of new exam rooms, restrooms, break room and work stations. — mob finish out at valley regional medical center

    TDLR project registrationRenovation/AlterationReview Complete3,300 sq ft$330K est.
    Tenant / owner
    2024-010 Mob Finish Out At Valley Regional Medical Center Brownsville
    Design firm
    Pro
    Contact
    Pro

Sources: Texas Department of Licensing and Regulation

Questions about 100 E. Alton Gloor Blvd

What is being built at 100 E. Alton Gloor Blvd in Brownsville?

A TDLR registration describes an approximately 1,990-square-foot addition to Valley Regional Medical Center’s operating-room suite, with two C-section operating rooms and a storage room. The project was registered September 9, 2026, as TABS2027000596.

Is Valley Regional Medical Center expanding in Brownsville?

TDLR registered a project to add about 1,990 square feet to the hospital’s existing operating-room suite. The registration, TABS2027000596, is dated September 9, 2026.

What hospital upgrades are planned at 100 E. Alton Gloor Blvd?

TDLR records list replacement of two make-up air units and new emergency power supply system generators, along with replacement of normal and emergency power distribution. Those projects were registered December 10 and November 24, 2025, respectively.

How large is the Valley Regional Medical Center operating-room expansion?

The TDLR registration lists approximately 1,990 square feet for the addition. It describes two C-section operating rooms and a storage room added to the existing operating-room suite.

When were the hospital projects at this address registered?

The power-system upgrade was registered November 24, 2025, and the make-up air unit replacements on December 10, 2025. The operating-room expansion was registered September 9, 2026.

What hospital work is planned near La Catedral Restaurant in Brownsville?

TDLR filings list an operating-room expansion and two hospital upgrade projects at 100 E. Alton Gloor Blvd. The records place La Catedral Restaurant 57 meters from that address; they do not describe the restaurant as part of the hospital projects.

Also being built nearby

All of 78526

More warehouses & industrial in 78526, medical facilities in 78526, offices in 78526.

Email me when plan review is complete