groundranger
Recent · latest filing Oct 2025Commercial

5601 FM 45 South

Brownwood, TX 76801 · State Of Texas Dba Texas Nat'l Guard Armory

Four new barracks planned at Camp Bowie

A TDLR project registration describes plans for four new barracks at Camp Bowie, each measuring 7,236 square feet. The project was registered on October 29, 2025, with an applicant-estimated cost of $24.5 million.

Summarized from Texas Department of Licensing and Regulation records · updated Oct 29, 2025

Projects
1
1 filings
Latest filing
Oct 29, 2025
since Oct 29, 2025
Largest scope
28,944 sf
Estimated cost
$25M
state registration

Where this project stands

Under construction

Camp Bowie FY25 Training Center Upgrades

28,944 sq ft · $25M est.

  1. RegisteredOct 29, 2025
  2. Plan review
  3. ConstructionDec '25 – Jul '27
  4. Inspected
  5. Closed
59% through of a 20-month buildDec 1, 2025 → Jul 24, 2027

4 contacts on this project · 2 phone numbers

Permit & project history

1 project
  1. Design and construction of four (4) new barracks. each barrack is identical and each barrack is 7,236sqft. — camp bowie

    TDLR project registrationNew ConstructionReview Complete28,944 sq ft$25M est.
    Tenant / owner
    Camp Bowie Fy25 Training Center Upgrades
    Design firm
    Pro
    Contact
    Pro

Sources: Texas Department of Licensing and Regulation

Questions about 5601 FM 45 South

What is being built at 5601 FM 45 South in Brownwood?

The TDLR registration describes four new barracks at Camp Bowie. Each is planned to measure 7,236 square feet.

When was the Camp Bowie barracks project registered?

The project was registered with TDLR on October 29, 2025. Its registration number is TABS2026004586.

How many barracks are planned at Camp Bowie?

The registration describes four identical new barracks, totaling 28,944 square feet.

How much will the Camp Bowie training center upgrades cost?

The applicant estimated the project cost at $24.5 million in the TDLR registration. This is an estimate, not a reported final cost.

Is construction planned at 5601 FM 45 South?

The TDLR registration lists the project as new construction and describes the design and construction of four barracks. It was registered on October 29, 2025.

Email me when it passes inspection