2660 E. Trinity Mills Rd
Carrollton, TX 75006 · Covenant Church
Life School auditorium remodel adds a 6,600-square-foot music classroom
A remodel at 2660 E. Trinity Mills Road is planned to expand the music classroom and computer lab into a 6,600-square-foot music classroom. A TDLR project registration filed June 3, 2024, describes demolition and reconfiguration of the existing auditorium space; the registration lists the project as closed.
Summarized from Texas Department of Licensing and Regulation records · updated Jun 3, 2024
- Projects
- 1
- 1 filings
- Latest filing
- Jun 3, 2024
- since Jun 3, 2024
- Largest scope
- 6,600 sf
- Estimated cost
- $60K
- state registration
Where this project stands
CompletedLife School Auditorium Remodel
6,600 sq ft · $60K est.
- RegisteredJun 3, 2024
- Plan review
- ConstructionJun '24 – Aug '24
- Inspected
- Closed
Ran as a 2-month build.
4 contacts on this project · 3 phone numbers
Permit & project history
1 projectDemolition in preparation for expansion of music classroom and computer lab into a 6,600sf. music classroom. existing av booth and platform to be reconfigure into new space. existing electrical and hvac to remain. non-required staircase to be remo — life school carrollton elementary / covenant church
TDLR project registrationRenovation/AlterationProject Closed6,600 sq ft$60K est.- Project #
- TABS2024019922
- Tenant / owner
- Life School Auditorium Remodel
- Design firm
- Pro
- Contact
- Pro
Sources: Texas Department of Licensing and Regulation
Questions about 2660 E. Trinity Mills Rd
What is being built at 2660 E. Trinity Mills Road in Carrollton?
A Life School auditorium remodel is planned, with the music classroom and computer lab expanding into a 6,600-square-foot music classroom. The TDLR registration was filed June 3, 2024.
Is a new school being built at 2660 E. Trinity Mills Road?
The record describes a renovation and alteration, not a new school. It calls for demolition and reconfiguration of auditorium space for a larger music classroom.
When was the Life School auditorium remodel permitted?
The TDLR project registration, number TABS2024019922, was filed June 3, 2024. The record lists the project as closed.
How large will the new music classroom be at Life School in Carrollton?
The project registration describes a 6,600-square-foot music classroom. It says the existing auditorium AV booth and platform would be reconfigured into the new space.
What's being remodeled near College Park Joint Venture on East Trinity Mills Road?
The Life School auditorium at 2660 E. Trinity Mills Road is registered for a remodel to create a 6,600-square-foot music classroom. College Park Joint Venture is listed about 354 meters away.
How much is the Life School auditorium remodel estimated to cost?
The TDLR registration lists an estimated project cost of $60,000. This is the applicant's estimate, not a confirmed final cost.