3205 Dorchester Dr
Carrollton, TX 75007 · Carrollton-Farmer's Branch ISD
Dale B. Davis Elementary gets interior renovation and playground
A 6,250-square-foot renovation at Dale B. Davis Elementary School includes work on a special education suite, a new playground area, and a refresh of the music and arts department. The project was registered with TDLR on November 19, 2024; the registration lists an applicant-estimated project cost of $3.37 million. The TDLR record lists the inspection status as complete.
Summarized from Texas Department of Licensing and Regulation records · updated Nov 19, 2024
- Projects
- 1
- 1 filings
- Latest filing
- Nov 19, 2024
- since Nov 19, 2024
- Largest scope
- 6,250 sf
- Estimated cost
- $3.4M
- state registration
Where this project stands
Inspected · closing outDale B Davis Elementary School - Package 2
6,250 sq ft · $3.4M est.
- RegisteredNov 19, 2024
- Plan review
- ConstructionMar '25 – Sep '25
- Inspected
- Closednow
The building is substantially done. Move-in, fit-out and service work usually follow.
4 contacts on this project · 3 phone numbers
Permit & project history
1 projectA 6250 sq ft interior renovation of a sped suite and new playground area. renovation scope also includes refresh of music and arts department, and alternate to replace hvac fan units. — dale b davis elementary school
TDLR project registrationRenovation/AlterationInspection Complete6,250 sq ft$3.4M est.- Project #
- TABS2025005958
- Tenant / owner
- Dale B Davis Elementary School - Package 2
- Design firm
- Pro
- Contact
- Pro
Sources: Texas Department of Licensing and Regulation
Questions about 3205 Dorchester Dr
What is being built at 3205 Dorchester Dr in Carrollton?
TDLR records describe a 6,250-square-foot renovation at Dale B. Davis Elementary School, including a special education suite and a new playground area. The project was registered on November 19, 2024.
Is Dale B. Davis Elementary getting a new playground?
The TDLR project description includes a new playground area as part of the school renovation registered on November 19, 2024.
What renovations are planned at Dale B. Davis Elementary School?
The project covers a special education suite, a new playground area, and a refresh of the music and arts department. The description also lists replacement of HVAC fan units as an alternate.
How much will the Dale B. Davis Elementary renovation cost?
The TDLR registration lists an applicant-estimated cost of $3.37 million for the project. This is an estimate, not a reported final cost.
When was the Dale B. Davis Elementary project permitted?
The project was registered with the Texas Department of Licensing and Regulation on November 19, 2024. Its record lists the inspection status as complete.
What's being renovated near Woodlake in Carrollton?
At 3205 Dorchester Dr, Dale B. Davis Elementary School has a registered 6,250-square-foot renovation project. The scope includes a special education suite, a playground area, and a refresh of the music and arts department.
Also being built nearby
All of 75007- 1901 Castille DriveSep 30, 2024Woodlake section #4 — new construction — street, alley, and sidewalk reconstruction · 496 m away
- 3610 N. Josey Ln · Harbor PropertiesAug 27, 2024U.s. dermatology partners- carrollton — renovation/alteration — the scope of this project is a non-structural interior finish-out in an existing single floor suite · 517 m away
- 3621 N. Josey Lane · Goodwill Industries Of Dallas Inc.May 7, 2025Goodwill store and donation center-alteration — renovation/alteration — on the interior, a long wall and 2 doors will be added to the existing sales floor to provide a corridor that extends from the front to the existing stockroom in the rear. patch work to the sales floor area will be required. relocating 2 ada parking · 525 m away
- 1706 E Peters Colony Rd · Carrollton-Farmers Branch Independent School DistrictFeb 19, 2025Carrollton-farmers branch isd blalack middle school renovations — renovation/alteration — interior full demolition of about 50% of the existing middle school building in additional to other areas being renovated with temporary portables being installed on site while construction is ongoing. other minor site work is included · 542 m away
- 3650 Cemetery Hill Rd · City Of CarrolltonMar 3, 20262022 misc streets - cemetery hill & cromwell — renovation/alteration — reconstruction of cemetery hill road and cromwell drive · 590 m away