700 W. Whitestone Blvd
Cedar Park, TX 78613 · Good Shepherd New Building, Good Shepherd Lutheran Church Parking Lot Expansion
Good Shepherd registers a 13,000-square-foot church building
A new 13,000-square-foot religious assembly building with accessory-use spaces is planned for 700 W. Whitestone Blvd. Good Shepherd Church’s project was registered with TDLR on September 5, 2025, as new construction.
Summarized from Texas Department of Licensing and Regulation records · updated Sep 5, 2025
- Projects
- 2
- 2 filings
- Latest filing
- Sep 5, 2025
- since Sep 5, 2025
- Largest scope
- 13,000 sf
- Estimated cost
- $7.1M
- state registration
Where this project stands
In state plan reviewGood Shepherd New Building
13,000 sq ft · $7.1M est.
- RegisteredSep 5, 2025
- Plan reviewnow
- ConstructionJan '26 – May '27
- Inspected
- Closed
Design is filed with the state. Subcontractors and suppliers are usually picked around now.
4 contacts on this project · 3 phone numbers
Permit & project history
2 projectsNew religious assembly building with accessory use spaces. type ii-b construction, fully sprinkled. — good shepherd church
TDLR project registrationNew ConstructionProject Registered13,000 sq ft$7.1M est.- Project #
- TABS2026000392
- Tenant / owner
- Good Shepherd New Building
- Design firm
- Pro
- Contact
- Pro
Parking lot expansion, pedestrian pathways, and general seating / gathering areas — good shepherd lutheran church
TDLR project registrationRenovation/AlterationInspection Complete70,000 sq ft$800K est.- Project #
- TABS2023014970
- Tenant / owner
- Good Shepherd Lutheran Church Parking Lot Expansion
- Design firm
- Pro
- Contact
- Pro
Sources: Texas Department of Licensing and Regulation
Questions about 700 W. Whitestone Blvd
What is being built at 700 W. Whitestone Blvd in Cedar Park?
Good Shepherd Church registered plans for a new 13,000-square-foot religious assembly building with accessory-use spaces. The TDLR project registration is TABS2026000392.
When was the Good Shepherd building project registered?
The project was registered with the Texas Department of Licensing and Regulation on September 5, 2025.
How large will the new Good Shepherd building be?
The TDLR registration lists the building at 13,000 square feet.
What is the estimated cost of the Good Shepherd project?
The TDLR registration lists an applicant-estimated project cost of $7.1 million. This is an estimate, not a confirmed final cost.
What is being built near Austin Pita Bakery-Shop on West Whitestone Boulevard?
Good Shepherd Church registered plans for a new 13,000-square-foot religious assembly building at 700 W. Whitestone Blvd. Austin Pita Bakery-Shop is listed about 154 meters away.
Is a new church building planned near White Stone Square in Cedar Park?
Yes. Good Shepherd Church’s registered plans call for a new religious assembly building at 700 W. Whitestone Blvd, about 357 meters from White Stone Square. The project was registered on September 5, 2025.
Also being built nearby
All of 78613- 840 W Whitestone Blvd · Austin Pita Bakery-ShopApr 18, 2024Austin pita bakery/shop — renovation/alteration — interior finishout of existing building · 154 m away
- 500 West Whitestone Blvd · Prime Lodging LLCSep 19, 2024Medix infusion tenant build out — renovation/alteration — - demolition of current walls, floors and break room sink and cabinetry as detailed in demolition plans; - installation of new walls, interior glass, 7 doors and frames, 10 wall cabinets, 2 base cabinets, 2 sinks and faucets, 1 shelf, new wood floor · 166 m away
- 500 West Whitestone Blvd · Prime Lodging LLCJul 8, 2026Austin family medicine suite 100 — renovation/alteration — remove and replace all cabinets, demolish pony walls and rebuild for reception; remove hallway windows and door and build new walls, add 4 doors, replace flooring, add extra outlets to desk areas, update hvac control boxes · 166 m away
- 875 W. Whitestone Blvd · Texell Credit UnionJun 2, 2026Texell credit union - cedar park renovations — renovation/alteration — renovations to remove teller stations and add new bank equipment · 232 m away
- 410 W. Whitestone Blvd · White Stone Square LLCMar 2, 2026Safesplash - cedar park — renovation/alteration — construction of a new swimming pool within an existing building shell, including electrical, plumbing, and mechanical, interior partitions, square footage is 4,746 · 357 m away
- 400 W Whitestone Blvd · Whitestone Middleman LLCDec 18, 2025Vip furbabies — renovation/alteration — remodel of new business · 378 m away
- 300 West Whitestone Blvd · La Dosis 300 Whitestone Holdings LLCJun 5, 2024La dosis coffee taco coctails — renovation/alteration — replace sheet rock, move fixtures, add bar, paint, update all restaurant equipment · 521 m away
- 201 Walton Way · Walmart, Inc.Sep 1, 2026Walmart 2991.1005 — renovation/alteration — 35,750 sq ft interior remodel & 5,669 sq ft addition · 539 m away