635 Cibolo Valley Drive
Cibolo, TX 78108 · Florin Capital Bsd-8, LP
Wingstop interior renovation registered in Cibolo
A 1,765-square-foot interior renovation to support a new Wingstop tenant is planned at 635 Cibolo Valley Drive. The Texas Department of Licensing and Regulation registration was filed October 1, 2026, and lists an estimated project cost of $300,000.
Summarized from Texas Department of Licensing and Regulation records · updated Oct 1, 2026
- Projects
- 1
- 1 filings
- Latest filing
- Oct 1, 2026
- since Oct 1, 2026
- Largest scope
- 1,765 sf
- Estimated cost
- $300K
- state registration
Where this project stands
Approved · construction starts Dec 10, 2026Wingstop (GL#AD056)
1,765 sq ft · $300K est.
- RegisteredOct 1, 2026
- Plan review
- ConstructionDec '26 – Mar '27
- Inspected
- Closed
A 3-month build is scheduled. Bids for subcontractors and suppliers usually close before the start date.
4 contacts on this project · 4 phone numbers
Permit & project history
1 projectTenant improvement of an existing building to support new tenant. work includes demolition as required, construction of new interior partitions; new wall, floor, and ceiling finishes; new equipment; new lighting and electrical systems; new mechani — wingstop
TDLR project registrationRenovation/AlterationReview Complete1,765 sq ft$300K est.- Project #
- TABS2027002487
- Tenant / owner
- Wingstop (gl#ad056)
- Design firm
- Pro
- Contact
- Pro
Sources: Texas Department of Licensing and Regulation
Questions about 635 Cibolo Valley Drive
What is being built at 635 Cibolo Valley Drive?
A tenant improvement is planned inside an existing building to support a new Wingstop tenant. The work includes interior partitions, finishes, equipment, lighting and electrical systems.
Is a Wingstop opening in Cibolo?
A TDLR project registration describes interior work to support a new Wingstop tenant at 635 Cibolo Valley Drive. It does not give an opening date.
When was the Wingstop project registered?
The TDLR registration, project number TABS2027002487, was filed October 1, 2026. Its status is listed as Review Complete.
How large is the Wingstop renovation in Cibolo?
The registration lists 1,765 square feet of renovation work at 635 Cibolo Valley Drive.
What's being built near Mathnasium of Cibolo?
A tenant improvement for a new Wingstop tenant is planned at 635 Cibolo Valley Drive, about 337 meters from Mathnasium of Cibolo, according to the project records.
How much will the Wingstop project cost?
The TDLR registration lists an estimated project cost of $300,000.
Also being built nearby
All of 78108- 580 Cibolo Valley Drive · Alamo Healthcare Partners, LLCOct 7, 2025Family care center - cibolo ftx-11 — renovation/alteration — scope of work includes private offices, breakroom, waiting area, reception, storage, and single-user restroom(s) and is a non-procedural facility. finish level for the project is considered as "mid level" with standard office finish specifications · 71 m away
- 813 Cibolo Valley Dr Ciblo Valeey Dr · Buffalo Heights Cibolo Developers LtdAug 19, 2025Boss bagel — renovation/alteration — first generation interior finish out for restaurant · 268 m away
- 813 Cibolo Valley Dr · Buffalo Heights Cibolo Developers LtdOct 3, 2025Ace hardware buffalo heights — renovation/alteration — interior finish-out to create a reatail space · 268 m away
- 813 Cibolo Valley Dr · Buffalo Heights Cibolo Developers, LtdFeb 21, 2025Crust pizza - cibolo — renovation/alteration — interior build-out of restaurant within existing retail center · 268 m away
- 813 Cibolo Valley · Buffalo Heights Cibolo Developers LtdJul 11, 2024Buffalo heights luxxe salon suites — new construction — interior finish out for a salon suites, including mechanical, electrical, and plumbing · 268 m away
- 857 Cibolo Valley · Buffalo Heights - Cibolo Developers, Ltd.Sep 4, 2026Alliance jiu jitsu — renovation/alteration — first generation interior finish-out · 337 m away
- 857 Cibolo Valley Drive · Buffalo Heights - Cibolo Developers, Ltd.Jul 7, 2025Pt solutions — renovation/alteration — build-out of a currently vacant, new space for a physical therapy clinic. work includes modifying the existing storefront to provide a new entry/egress door. work also includes new hvac, plumbing and electric · 337 m away
- 857 Cibolo Valley Dr · Buffalo Heights Cibolo Developers, LtdJul 12, 2026Mathnasium of cibolo — renovation/alteration — interior finish out of a retail space · 337 m away
- 885 Cibolo Valley Drive · Chick-Fil-A, Inc.Nov 7, 2024Cfa 05169 cibolo p14 mfa remodel — renovation/alteration — modification of the meal fulfillment area. finish modifications and patching as required. new equipment provided · 382 m away
- 933 Cibolo Valley Drive · Suelo Dulce Cibolo, LLCFeb 17, 2025Walk up-drive thru frozen custard store — new construction — new 1622 sq ft drive thru frozen custard retail store building. new civil, landscaping, and mep building systems included · 451 m away
- 850 FM 1103 · Pnc BankJul 8, 2026Pnc bank - ground up cibolo — new construction — ground up bank with drive thru lanes. all new mechanical, electrical, plumbing and architecture included · 497 m away
More demolitions in 78108.