302 Brazoswood Drive

Clute, TX 77531 · Brazosport ISD

Brazoswood HS natatorium demolition and storage-area enclosure

A project at 302 Brazoswood Drive calls for demolition of the existing natatorium and enclosure of the athletic storage area, with backfill and regrading after pool removal. The project was registered with TDLR on March 9, 2026, and lists 7,000 square feet of work. The applicant’s estimated project cost is $1.4 million.

Summarized from Texas Department of Licensing and Regulation records · updated Mar 9, 2026

Projects
1
1 filings
Latest filing
Mar 9, 2026
since Mar 9, 2026
Largest scope
7,000 sf
Estimated cost
$1.4M
state registration

Where this project stands

Finishing up · inspection next

Brazoswood HS Natatorium

7,000 sq ft · $1.4M est.

  1. RegisteredMar 9, 2026
  2. Plan review
  3. ConstructionMay '26 – Aug '26
  4. Inspectednow
  5. Closed

Scheduled to finish Aug 28, 2026; the state inspection hasn't been filed yet.

4 contacts on this project · 3 phone numbers

Permit & project history

1 project
  1. Demolition of the existing natatorium and enclosure of the athletic storage area, with minor site work including backfill and regrading following pool removal. — brazoswood hs natatorium

    TDLR project registrationRenovation/AlterationReview Complete7,000 sq ft$1.4M est.
    Tenant / owner
    Brazoswood Hs Natatorium
    Design firm
    Pro
    Contact
    Pro

Sources: Texas Department of Licensing and Regulation

Questions about 302 Brazoswood Drive

What is happening at 302 Brazoswood Drive in Clute?

The TDLR project registration describes demolition of the existing Brazoswood HS natatorium and enclosure of the athletic storage area, plus minor site work.

Is the Brazoswood HS natatorium being demolished?

Yes. The project description calls for demolition of the existing natatorium and pool removal, followed by backfill and regrading.

When was the Brazoswood HS natatorium project registered?

The project was registered with TDLR on March 9, 2026.

What is the project number for work at Brazoswood HS Natatorium?

The TDLR project registration number is TABS2026014465.

How large is the Brazoswood HS Natatorium project?

The TDLR registration lists 7,000 square feet.

How much will the Brazoswood HS Natatorium project cost?

The applicant’s estimated cost is $1.4 million. This is an estimate for the project, not a reported final cost.