801 University Drive East
College Station, TX 77840 · Hilton Oakwood And Bluebonnet Bathroom Renovation, Hilton Rooftop Deck Additions And Remodel
Hilton bathroom and rooftop deck renovations at 801 University Drive East
TDLR records show renovations at this multi-tenant commercial property, including a Hilton bathroom renovation registered January 11, 2024. A separate Hilton project registered March 6, 2023, called for a rooftop observation deck and remodeling two hotel suites for supporting bar and kitchen prep space, restrooms, and storage.
Summarized from Texas Department of Licensing and Regulation records · updated Jan 11, 2024
- Projects
- 2
- 2 filings
- Latest filing
- Jan 11, 2024
- since Jan 11, 2024
- Largest scope
- 1,500 sf
- Estimated cost
- $700K
- state registration
Where this project stands
CompletedHilton Oakwood and Bluebonnet Bathroom Renovation
1,500 sq ft · $53K est.
- RegisteredJan 11, 2024
- Plan review
- ConstructionJan '24 – Feb '24
- Inspected
- Closed
Ran as a 2-month build.
4 contacts on this project · 3 phone numbers
Permit & project history
2 projectsCosmetic upgrade, change plumbing, electrical and millwork, fixtures, tile and paint. — hilton hotel and conference center college station
TDLR project registrationRenovation/AlterationProject Closed1,500 sq ft$53K est.- Project #
- TABS2024009029
- Tenant / owner
- Hilton Oakwood And Bluebonnet Bathroom Renovation
- Design firm
- Pro
- Contact
- Pro
Project entails adding a new elevated observation deck above the current roof on the 10th and 11th floors, along with remodeling two adjacent hotel suites into a new supporting bar and kitchen prep space, expanded restrooms, storage, and ramp/steps — hilton hotel college station
TDLR project registrationRenovation/AlterationProject Closed4,300 sq ft$700K est.- Project #
- TABS2023013391
- Tenant / owner
- Hilton Rooftop Deck Additions And Remodel
- Design firm
- Pro
- Contact
- Pro
Sources: Texas Department of Licensing and Regulation
Questions about 801 University Drive East
What is being built at 801 University Drive East?
TDLR records list renovations at the multi-tenant property, including a Hilton bathroom renovation and a separate rooftop deck project. The bathroom project was registered January 11, 2024, and the deck project was registered March 6, 2023.
Is Hilton renovating at 801 University Drive East in College Station?
Yes. A TDLR registration dated January 11, 2024, describes cosmetic bathroom upgrades, including plumbing, electrical, millwork, fixtures, tile, and paint. The registration, TABS2024009029, is marked project closed.
What is the Hilton rooftop project in College Station?
The project registration describes an elevated observation deck above the existing roof on the 10th and 11th floors, plus remodeling two nearby hotel suites into bar and kitchen prep space, expanded restrooms, and storage. It was registered March 6, 2023, as TABS2023013391 and is marked project closed.
Is there a new restaurant opening at 801 University Drive East?
The available TDLR records describe renovations, including a Hilton bathroom renovation and rooftop deck work with supporting bar and kitchen prep space. They do not state that a new restaurant is opening.
What is being renovated near Century Square in College Station?
At 801 University Drive East, TDLR records list Hilton bathroom work registered January 11, 2024, and a rooftop deck and hotel-suite remodel registered March 6, 2023. Century Square is listed 284 meters from the address.
How much will the Hilton rooftop deck project cost?
The applicant's estimated cost for the project registered March 6, 2023, is $700,000. This is an estimate for that project, not a reported total cost for the property.
Also being built nearby
All of 77840- 801 University Drive E · Calgary Square Eat LLCJan 11, 2024Hilton restaurant renovation — renovation/alteration — renovation of restaurant space with new furniture, fixtures and equipment
- 903 University Drive · A I Hoch Management College Station, LLCMay 14, 2024Bww remodel - college station, tx — renovation/alteration — 4,500 sq ft remodel to remove a low wall, update signage, av layout, furniture layout and exterior and interior finishes · 130 m away
- 713 University Drive E · Bfv Chimney Hill, LLCFeb 22, 2024Drybar — renovation/alteration — tenant finish for a salon in 1st gen space. new hvac units, new restroom& wash sinks, new electrical gear and circutis. new finishes and non-structural walls · 230 m away
- 702 E University Dr · Randy Harrison - Texas A&m Transportation ServicesJun 10, 2024Tamu pa 64 mill and replace — renovation/alteration — mill and replacement of existing asphalt parking lot. replacement includes driveway, parking lot, and sidewalk replacement · 232 m away
- 1001 University Dr · Aspire A&m II LLCSep 15, 2026Pink — new construction — interior finish out · 254 m away
- 1025 University Drive · Century SquareSep 6, 2024Red's ice house — renovation/alteration — minor alterations to existing previous restaurant tenant build out · 284 m away
- 940 University Drive · Utc RealtyFeb 20, 2024Willies grill & bar additions — renovation/alteration — addition of a new bar inside and outside · 289 m away
- 301 Tarrow Street · Texas A&m University SystemsMar 30, 2026Tamus moore-connally lobby storefront — renovation/alteration — new storefront install bi-parting sliding automatic doors · 374 m away
- 615 University Dr East · Hcl University Park LLCAug 29, 2025Xfinity tenant improvement — renovation/alteration — 3,322 sq ft tenant improvement buildout of a xfinity retail store · 415 m away
- 1133 University Dr · Chop Shop Holdings LLCMar 11, 2024Original chop shop -college station — renovation/alteration — a tenant finish out · 421 m away
- 1133 University Drive · Midway CompaniesJul 1, 2024Dimassi's — new construction — interior build-out · 421 m away
- 607 University Dr E · Hcl University Park LLCApr 14, 2026Belgravia nail spa — renovation/alteration — remodeling the existing space into a nail salon · 429 m away