groundranger
Recent · latest filing Jun 2025Commercial

1901 N. Shoreline Blvd

Corpus Christi, TX 78401 · Convention Center Flood Mitigation - City Project #25024, American Bank Center - Selena Loading Dock Overhead Door (fmac) + 2 more

American Bank Center flood mitigation and renovation work

Renovation work at the multi-tenant American Bank Center includes a storm-water pump station replacement and related storm sewer, electrical, landscaping and irrigation improvements. The flood mitigation project was registered on June 19, 2025. Earlier filings cover exterior improvements and replacement of a loading dock door at the Selena Auditorium.

Summarized from Texas Department of Licensing and Regulation records · updated Jun 19, 2025

Projects
4
4 filings
Latest filing
Jun 19, 2025
since Jan 9, 2024
Largest scope
50,000 sf
Estimated cost
$1.9M
state registration

Where this project stands

Under construction

Convention Center Flood Mitigation - City Project #25024

12,000 sq ft · $1.4M est.

  1. RegisteredJun 19, 2025
  2. Plan review
  3. ConstructionSep '25 – Mar '27
  4. Inspected
  5. Closed
80% through of a 18-month buildSep 15, 2025 → Mar 5, 2027

4 contacts on this project · 3 phone numbers

Permit & project history

4 projects
  1. Scope includes the replacement of a storm-water pump station, along with associated gravity storm sewer improvements, form main installation, electrical, landscape, and irrigation improvements. — american bank center

    TDLR project registrationRenovation/AlterationReview Complete12,000 sq ft$1.4M est.
    Tenant / owner
    Convention Center Flood Mitigation - City Project #25024
    Design firm
    Pro
    Contact
    Pro
  2. The replacement of one existing exterior overhead door with two new overhead doors, new exterior wall framing, new electrical work, and repairs to the loading dock exterior finishes. — selena auditorium

    TDLR project registrationRenovation/AlterationProject Closed720 sq ft$115K est.
    Tenant / owner
    American Bank Center - Selena Loading Dock Overhead Door (fmac)
    Design firm
    Pro
    Contact
    Pro
  3. Modifications to existing conditions that includes small amounts of demolition, new landscaping, tiered landscaping with concrete retaining walls, irrigation, benches, removable bollards, correcting erosion issue and leveling of existing concrete. — american bank center

    TDLR project registrationRenovation/AlterationProject Closed50,000 sq ft$1.9M est.
    Tenant / owner
    American Bank Center - Exterior Improvements
    Design firm
    Pro
    Contact
    Pro
  4. Include removal of existing tile flooring, updating of existing restrooms and revamping of existing hvac system. two new food and beverage areas will be added as well as partitions to indicate the new lounge area. — american bank center

    TDLR project registrationRenovation/AlterationProject Closed10,960 sq ft$1.3M est.
    Tenant / owner
    American Bank Center City Terrace And Suite Enhancements
    Design firm
    Pro
    Contact
    Pro

Sources: Texas Department of Licensing and Regulation

Questions about 1901 N. Shoreline Blvd

What work is planned at 1901 N. Shoreline Blvd?

TDLR records describe several American Bank Center renovations, including flood mitigation, exterior improvements and loading dock work. The latest filing, dated June 19, 2025, covers a storm-water pump station replacement and related improvements.

What is the American Bank Center flood mitigation project?

The project includes replacing a storm-water pump station, improving gravity storm sewer, and making electrical, landscaping and irrigation improvements. It was registered as TABS2025021630 on June 19, 2025.

Is a new building being constructed at American Bank Center?

The records describe renovation and alteration work, not a new building. The projects include storm-water infrastructure, exterior improvements and loading dock door replacement.

What are the exterior improvements at American Bank Center?

A project registered on January 9, 2024, includes landscaping, concrete retaining walls, irrigation, benches, removable bollards, erosion correction and leveling existing concrete. Its TDLR number is TABS2024008904.

What work is planned at the Selena Auditorium loading dock?

The May 1, 2024, filing describes replacing one exterior overhead door with two new doors, along with new wall framing, electrical work and repairs to the loading dock exterior. The project is TABS2024017454.

When was the latest American Bank Center project filed?

The latest listed filing was submitted June 19, 2025, for Convention Center Flood Mitigation, City Project #25024. Its TDLR number is TABS2025021630.

More demolitions in 78401.

Email me when it passes inspection