3826 Surfside Blvd
Corpus Christi, TX 78402 · City Of Corpus Christi
North Beach drainage, park and street improvements registered
A City of Corpus Christi project in North Beach calls for a new 4,600-foot drainage canal, park improvements, water and wastewater work, and reconstruction and pedestrian improvements on two roads. The project was registered with TDLR on November 25, 2024; the registration lists it as new construction.
Summarized from Texas Department of Licensing and Regulation records · updated Nov 25, 2024
- Projects
- 2
- 2 filings
- Latest filing
- Nov 25, 2024
- since Nov 25, 2024
- Largest scope
- 1,021,451 sf
- Estimated cost
- $5.0M
- state registration
Where this project stands
Finishing up · inspection nextNorth Beach Drainage Improvements(Phase 1),Beach Ave(Bond 2018),Gulfspray Ave(Bond 2018),Eco Park
1,021,451 sq ft · $3.7M est.
- RegisteredNov 25, 2024
- Plan review
- ConstructionMar '25 – Nov '26
- Inspectednow
- Closed
Scheduled to finish Nov 3, 2026; the state inspection hasn't been filed yet.
4 contacts on this project · 3 phone numbers
Permit & project history
2 projectsThis project includes the construction of a new central drainage canal (4600 lf), park improvements including two (2) concrete pedestrian trails, wastewater and water improvements, & two (2) road reconstruction and pedestrian improvements. — north beach
TDLR project registrationNew ConstructionReview Complete1,021,451 sq ft$3.7M est.- Project #
- TABS2025006369
- Tenant / owner
- Pro
- Design firm
- Pro
- Contact
- Pro
New elevated restroom facility, boardwalk to beach, parking, picnic areas, recreation play area — surfside park north beach
TDLR project registrationNew ConstructionProject Closed1,200 sq ft$5.0M est.- Project #
- TABS2023014481
- Tenant / owner
- Surfside Park North Beach Restroom & Parking Facility (21082)
- Design firm
- Pro
- Contact
- Pro
Sources: Texas Department of Licensing and Regulation
Questions about 3826 Surfside Blvd
What is being built at 3826 Surfside Blvd in Corpus Christi?
The North Beach project includes a new central drainage canal, two concrete pedestrian trails, water and wastewater improvements, and reconstruction and pedestrian improvements on two roads. Its TDLR registration is TABS2025006369.
When was the North Beach drainage project filed?
The project was registered with the Texas Department of Licensing and Regulation on November 25, 2024. Its registration status is listed as Review Complete.
What is the estimated cost of the North Beach improvements?
The TDLR registration lists an estimated project cost of $3,664,211. This is the applicant's estimate for the project.
What park improvements are planned at 3826 Surfside Blvd?
The project description includes park improvements with two concrete pedestrian trails. It is part of the North Beach Drainage Improvements project.
What's being built near Villa Del Sol Condos on Surfside Boulevard?
The North Beach project registered at 3826 Surfside Blvd includes a drainage canal, park improvements, water and wastewater work, and road and pedestrian improvements. Villa Del Sol Condos is listed 134 meters away.
Is the Surfside Boulevard project new construction?
Yes. TDLR lists the North Beach Drainage Improvements project as new construction, with registration number TABS2025006369 dated November 25, 2024.
Also being built nearby
All of 78402- 3826 Surfside Blvd, Corpus Christi, Tx, 78402 · City Of Corpus ChristiJun 19, 2025Ncap25012 - north beach sidewalk repairs - 23008 - minor streets and facilities improvements - deli — renovation/alteration — demolition of 1,730 sq ft of existing sidewalk, and installation of 1,200 sq ft of 4" thick concrete sidewalk rerouting
- 3938 Surfside Blvd · Villa Del Sol CondosMay 28, 2024Villa del sol — renovation/alteration — staircase renovation · 134 m away
- 3612 Surfside Blvd · City Of Corpus ChristiApr 30, 2026Ncap26816 - breaker avenue and golf place beach access sidewalk reroutes — new construction — demolition and disposal of 6,930 sq ft of existing concrete sidewalk, excavation, installation of 5,600 sq ft of 6" thick concrete sidewalk away from the shoreline atop 6" of stabilized subgrade, and relocating trash bag receptacles · 374 m away