2111 S. Staples St
Corpus Christi, TX 78404 · Fwr Foods, INC
KFC interior renovation planned at 2111 S. Staples St.
A 3,120-square-foot interior renovation of the dining area and restrooms is registered for the existing KFC at 2111 S. Staples St. The Texas Department of Licensing and Regulation registration was filed February 13, 2026. The applicant estimated the project cost at $78,000.
Summarized from Texas Department of Licensing and Regulation records · updated Feb 13, 2026
- Projects
- 1
- 1 filings
- Latest filing
- Feb 13, 2026
- since Feb 13, 2026
- Largest scope
- 3,120 sf
- Estimated cost
- $78K
- state registration
Where this project stands
Finishing up · inspection nextKFC (D212151)
3,120 sq ft · $78K est.
- RegisteredFeb 13, 2026
- Plan review
- ConstructionFeb '26 – Apr '26
- Inspectednow
- Closed
Scheduled to finish Apr 15, 2026; the state inspection hasn't been filed yet.
4 contacts on this project · 2 phone numbers
Permit & project history
1 projectInterior renovation of the dining area and restrooms for an existing restaurant. — kfc
TDLR project registrationRenovation/AlterationReview Complete3,120 sq ft$78K est.- Project #
- TABS2026012536
- Tenant / owner
- Kfc (d212151)
- Design firm
- Pro
- Contact
- Pro
Sources: Texas Department of Licensing and Regulation
Questions about 2111 S. Staples St
What is being built at 2111 S. Staples St. in Corpus Christi?
The existing KFC is registered for an interior renovation of its dining area and restrooms. The project covers 3,120 square feet.
Is a new KFC opening at 2111 S. Staples St.?
The record describes renovations to an existing restaurant, not a new location. It does not give an opening date.
When was the KFC renovation filed?
The TDLR project registration was filed February 13, 2026. Its project number is TABS2026012536.
How much will the KFC renovation cost?
The applicant estimated the project cost at $78,000 in the TDLR registration. This is an estimate, not a reported final cost.
What parts of the KFC are being renovated?
The registration describes work in the dining area and restrooms. It lists the project as a renovation or alteration.
How large is the renovation at 2111 S. Staples St.?
The TDLR registration lists the renovation area as 3,120 square feet.
Also being built nearby
All of 78404- 101 Baldwin Blvd · Del Mar CollegeJul 25, 2025Del mar college fine arts deferred maintenance — renovation/alteration — mechanical systems replacement, improve building envelope deficiencies, limited plumbing and architectural improvements on two floors · 433 m away
- 101 Baldwin Blvd 101 Baldwin Blvd · Del Mar College DistrictJul 25, 2024Ccisd collegiate hs security vestibule — renovation/alteration — replace exterior doors and build an interior vestibule · 433 m away
- 746 Texas Ave · Tupelo Management LLCMar 19, 2025746 texas ave — renovation/alteration — all new drywall on ceilings and walls. texture and paint. foam board insultationand r13 bat on all exterior walls and attached apartment walls. spray foam insulation on roof and floor r20. new flooring, new appliances, solid tops, backsplashes · 512 m away
More restaurants in 78404.