3709 Lott Ave
Corpus Christi, TX 78410 · Calallen ISD
Calallen ISD files for Elementary East renovation
A 12,500-square-foot renovation at Calallen ISD’s Elementary East was registered with TDLR on March 31, 2025. The work includes replacing flooring, base, ceiling and light fixtures in the entry, corridor and cafeteria, plus plumbing fixture changes in restrooms.
Summarized from Texas Department of Licensing and Regulation records · updated Mar 31, 2025
- Projects
- 1
- 1 filings
- Latest filing
- Mar 31, 2025
- since Mar 31, 2025
- Largest scope
- 12,500 sf
- Estimated cost
- $800K
- state registration
Where this project stands
CompletedElementary East Renovation
12,500 sq ft · $800K est.
- RegisteredMar 31, 2025
- Plan review
- ConstructionJun '25 – Sep '25
- Inspected
- Closed
Ran as a 3-month build.
4 contacts on this project · 3 phone numbers
Permit & project history
1 projectReplacement of flooring, base, ceiling & light fixtures in entry, corridor, & cafeteria space. plumbing fixture & fixture changes in restrooms. — calallen isd elementary east
TDLR project registrationRenovation/AlterationProject Closed12,500 sq ft$800K est.- Project #
- TABS2025015453
- Tenant / owner
- Elementary East Renovation
- Design firm
- Pro
- Contact
- Pro
Sources: Texas Department of Licensing and Regulation
Questions about 3709 Lott Ave
What is being built at 3709 Lott Ave?
The filing is for a renovation at Calallen ISD’s Elementary East, not a new building. It lists interior finish and fixture replacements.
When was the Elementary East renovation filed?
The TDLR project registration was filed on March 31, 2025. Its project number is TABS2025015453.
What work is planned at Calallen ISD Elementary East?
The registration describes replacing flooring, base, ceiling and light fixtures in the entry, corridor and cafeteria, along with plumbing fixture changes in restrooms.
How large is the Elementary East renovation?
The TDLR registration lists the project at 12,500 square feet.
How much is the Calallen ISD renovation expected to cost?
The applicant’s estimated project cost is $800,000, according to the TDLR registration. This is an estimate, not a confirmed final cost.
Is the Elementary East renovation complete?
The TDLR record lists the project status as closed. The filing does not state when construction was completed.