1901 N. Shoreline Blvd
Corpus Christi, TX 78411 · City Of Corpus Christi
Selena Auditorium pit lift and stage flooring replacement
Work at Selena Auditorium includes replacing the orchestra pit lift, orchestra platform and stage flooring, along with electrical and foundation work. A Texas Department of Licensing and Regulation project registration dated June 10, 2024, describes the renovation; its status is listed as closed.
Summarized from Texas Department of Licensing and Regulation records · updated Jun 10, 2024
- Projects
- 1
- 1 filings
- Latest filing
- Jun 10, 2024
- since Jun 10, 2024
- Largest scope
- 5,695 sf
- Estimated cost
- $593K
- state registration
Where this project stands
CompletedAmerican Bank Center - Selena Auditorium Pit Lift
5,695 sq ft · $593K est.
- RegisteredJun 10, 2024
- Plan review
- ConstructionAug '24 – Mar '25
- Inspected
- Closed
Ran as a 8-month build.
4 contacts on this project · 3 phone numbers
Permit & project history
1 projectThe removal/replacement of an existing orchestra pit lift system, with a new pit lift system, temporary shoring, electrical work, foundation work. the removal/replacement of orchestra platform and stage flooring. — selena auditorium
TDLR project registrationRenovation/AlterationProject Closed5,695 sq ft$593K est.- Project #
- TABS2024020403
- Tenant / owner
- American Bank Center - Selena Auditorium Pit Lift
- Design firm
- Pro
- Contact
- Pro
Sources: Texas Department of Licensing and Regulation
Questions about 1901 N. Shoreline Blvd
What is being built at 1901 N. Shoreline Blvd?
The project is a renovation at Selena Auditorium, replacing the existing orchestra pit lift system, orchestra platform and stage flooring. The registration also lists temporary shoring, electrical work and foundation work.
Is a new Selena Auditorium being built in Corpus Christi?
No new auditorium is described in the project registration. It covers replacement and renovation work inside Selena Auditorium.
When was the Selena Auditorium pit lift project registered?
The TDLR registration, TABS2024020403, is dated June 10, 2024. Its listed status is closed.
How much is the Selena Auditorium renovation estimated to cost?
The applicant's TDLR estimate for the project is $592,604. This is an estimate, not a reported final cost.
What work is included in the Selena Auditorium project?
The registration lists a new orchestra pit lift system, temporary shoring, electrical and foundation work, and replacement of the orchestra platform and stage flooring.