Reclaimed water main planned from Oso WRP to Greenwood WWTP
A reclaimed water transmission main from Oso WRP to Greenwood WWTP, along with site improvements, was registered with TDLR on August 11, 2026. The project description includes street resurfacing and sidewalk and ADA ramp work as needed for pipeline installation; the applicant’s estimated project cost is $108 million.
Summarized from Texas Department of Licensing and Regulation records · updated Aug 11, 2026
- Projects
- 1
- 1 filings
- Latest filing
- Aug 11, 2026
- since Aug 11, 2026
- Largest scope
- 12,861 sf
- Estimated cost
- $108M
- state registration
Where this project stands
Under constructionReclaimed Water for Industrial Reuse Project
12,861 sq ft · $108M est.
- RegisteredAug 11, 2026
- Plan review
- ConstructionAug '26 – Jun '27
- Inspected
- Closed
4 contacts on this project · 3 phone numbers
Permit & project history
1 projectSite improvements at the oso wrp & a reclaimed water transmission main from oso wrp to greenwood wwtp. project includes mill and overlay various streets &remove & replace existing sidewalk & ada ramps as needed to facilitate pipeline installation. — oso wrp and reclaimed water transmission main
TDLR project registrationRenovation/AlterationReview Complete12,861 sq ft$108M est.- Project #
- TABS2026027503
- Tenant / owner
- Reclaimed Water For Industrial Reuse Project
- Design firm
- Pro
- Contact
- Pro
Sources: Texas Department of Licensing and Regulation
Questions about 501 Nile Dr
What is being built at 501 Nile Dr in Corpus Christi?
The project includes a reclaimed water transmission main from Oso WRP to Greenwood WWTP, plus site improvements. TDLR registration TABS2026027503 was filed August 11, 2026.
What is the reclaimed water project at Oso WRP?
The registered project includes site improvements at Oso WRP and a reclaimed water transmission main connecting Oso WRP to Greenwood WWTP.
Will the project involve street or sidewalk work?
The project description says various streets may be milled and overlaid, and existing sidewalks and ADA ramps may be removed and replaced as needed for pipeline installation.
How much is the Oso WRP reclaimed water project expected to cost?
The applicant’s estimated cost for the project is $108 million, according to the TDLR registration filed August 11, 2026.
What is the status of the reclaimed water transmission main project?
The TDLR record lists the project status as “Review Complete.”