6300 Ocean Drive
Corpus Christi, TX 78412 · Tamu Cc Islanders Dining Hall Phase 2, Tamucc Temporary Beach Access Boardwalk + 3 more
TAMU-CC dining hall renovation registered
Records for this multi-tenant campus site include an interior renovation of the existing Texas A&M-Corpus Christi Islanders dining hall. The 8,950-square-foot project was registered with TDLR on April 3, 2026, and includes new flooring, millwork and food service equipment.
Summarized from Texas Department of Licensing and Regulation records · updated Apr 3, 2026
- Projects
- 6
- 6 filings
- Latest filing
- Apr 3, 2026
- since Apr 15, 2024
- Largest scope
- 12,000 sf
- Estimated cost
- $1.5M
- state registration
Where this project stands
Finishing up · inspection nextTAMU CC Islanders Dining Hall Phase 2
8,950 sq ft · $250K est.
- RegisteredApr 3, 2026
- Plan review
- ConstructionMay '26 – Aug '26
- Inspectednow
- Closed
Scheduled to finish Aug 7, 2026; the state inspection hasn't been filed yet.
4 contacts on this project · 3 phone numbers
Permit & project history
6 projectsInterior renovation of a dining hall on an existing 1-story building. the scope consists of new flooring throughout dining area, new finish fronts at existing millwork, new millwork and coordinating food service equipment as noted. — texas a&m corpus christi
TDLR project registrationRenovation/AlterationReview Complete8,950 sq ft$250K est.- Project #
- TABS2026016790
- Tenant / owner
- Tamu Cc Islanders Dining Hall Phase 2
- Design firm
- Pro
- Contact
- Pro
Construction of a boardwalk connecting accessible route to beach sand — tamucc temporary beach access boardwalk
TDLR project registrationNew ConstructionProject Closed1,000 sq ft$350K est.- Project #
- TABS2025023246
- Tenant / owner
- Tamucc Temporary Beach Access Boardwalk
- Design firm
- Pro
- Contact
- Pro
Construction of a boardwalk connecting accessible route to beach sand — tamucc temporary beach access boardwalk
TDLR project registrationNew ConstructionInspection Complete3,000 sq ft$350K est.- Project #
- TABS2025023244
- Tenant / owner
- Tamucc Temporary Beach Access Boardwalk
- Design firm
- Pro
- Contact
- Pro
Interior build-out of a new restaurant on the first floor of an existing building. scope consists of new bar area, new finishes and furniture, enclosed patio area, kitchen equipment, lighting, mechanical, electrical, and plumbing. — texas a&m corpus christi - student union
TDLR project registrationRenovation/AlterationProject Closed3,430 sq ft$500K est.- Project #
- TABS2024021269
- Tenant / owner
- Islanders Sandbar And Grill
- Design firm
- Pro
- Contact
- Pro
Interior renovation of existing dining hall. scope consists of new finishes, new furniture, new millwork, new lighting, new kitchen equipment as noted, new exhaust hood, roof penetrations, and upgrades to electrical and mechanical as required — islander dining hall
TDLR project registrationRenovation/AlterationReview Complete12,000 sq ft$1.5M est.- Project #
- TABS2024016141
- Tenant / owner
- Islander Dining Hall Remodel
- Design firm
- Pro
- Contact
- Pro
Interior renovation ofexisting restaurant; the scope consists of new finishes, new lighting, new furniture, and an adjustment to the layour of existing kitchen equipment as noted. — mary and jeff bell library
TDLR project registrationRenovation/AlterationProject Closed2,285 sq ft$175K est.- Project #
- TABS2024007936
- Tenant / owner
- Salty Seagull At Tamu Cc
- Design firm
- Pro
- Contact
- Pro
Sources: Texas Department of Licensing and Regulation
Questions about 6300 Ocean Drive
What is being built at 6300 Ocean Drive?
TDLR records describe an interior renovation of the existing Islanders dining hall at Texas A&M-Corpus Christi, not a new building. The project was registered on April 3, 2026.
Is Texas A&M-Corpus Christi building a new dining hall?
The TDLR record describes renovation work inside an existing one-story dining hall. It does not describe construction of a new dining hall.
When was the dining hall renovation registered?
The project was registered with TDLR on April 3, 2026. Its project number is TABS2026016790.
What work is included in the dining hall renovation?
The listed scope includes new flooring throughout the dining area, new finish fronts at existing millwork, new millwork and food service equipment.
Is a beach access boardwalk also listed at this address?
Yes. TDLR records list a temporary beach access boardwalk connecting an accessible route to beach sand. Two registrations for that project are dated July 10 and July 11, 2025.
Is a new restaurant opening at 6300 Ocean Drive?
The available records describe renovation of an existing campus dining hall, not a new restaurant opening. They do not identify a separate restaurant tenant.